메뉴 건너뛰기




Volumn , Issue , 2010, Pages 166-171

Overview of power system operational reliability

Author keywords

Condition dependent reliabiity model; Fast sorting technique; Operational reliability; Operational reliability evaluation tools; Reliability indices

Indexed keywords

CONDITION DEPENDENT RELIABIITY MODEL; CONSTANT FAILURE RATE; ENERGY MANAGEMENT SYSTEM; ENVIRONMENT CONDITIONS; FAILURE RATE; FAST SORTING TECHNIQUE; LONG TERM PERFORMANCE; ONLINE OPERATIONS; OPERATING CONDITION; OPERATIONAL RELIABILITY; POWER SYSTEMS; RELIABILITY EVALUATION; RELIABILITY INDICES; SPECIAL ALGORITHMS; SYSTEM RELIABILITY; SYSTEM RISK; TIME FRAME; TIME VARYING;

EID: 77956444824     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/PMAPS.2010.5528993     Document Type: Conference Paper
Times cited : (20)

References (18)
  • 3
    • 34248398480 scopus 로고    scopus 로고
    • Power system operational reliability evaluation based on real-time operating state
    • Singapore, 29. Nov. -Dec. 2
    • Yuanzhang Sun, Lin Cheng, Haitao Liu, Shan He, "Power system operational reliability evaluation based on real-time operating state", The 7th International Power Engineering Conference (IPEC 2005), Singapore, 29. Nov. -Dec. 2 2005 Page(s):722 - 727 Vol. 2.
    • (2005) 7th International Power Engineering Conference (IPEC 2005) , vol.2 , pp. 722-727
    • Sun, Y.1    Cheng, L.2    Liu, H.3    He, S.4
  • 4
    • 42549110385 scopus 로고    scopus 로고
    • Short-term reliability online evaluation basing on transient state probability
    • IEEE 24-28 June 2007
    • Lin Cheng, Haitao Liu, Xin Zou, Yuanzhang Sun, "Short-term Reliability Online Evaluation Basing On Transient State Probability", Power Engineering Society General Meeting, 2007. IEEE 24-28 June 2007 Page(s):1 - 7.
    • (2007) Power Engineering Society General Meeting , pp. 1-7
    • Cheng, L.1    Liu, H.2    Zou, X.3    Sun, Y.4
  • 5
    • 77953346144 scopus 로고    scopus 로고
    • Operational reliability assessment of power systems considering condition-dependent failure rate
    • Yuanzhang Sun, Peng Wang, Haitao Liu, Lin Cheng, "Operational reliability assessment of power systems considering condition-dependent failure rate", IET Gener. Transm. Distrib., 2010, 4(1): 60-72.
    • (2010) IET Gener. Transm. Distrib. , vol.4 , Issue.1 , pp. 60-72
    • Sun, Y.1    Wang, P.2    Liu, H.3    Cheng, L.4
  • 6
    • 37249043854 scopus 로고    scopus 로고
    • Online short-term reliability evaluation using a fast sorting technique
    • DOI 10.1049/iet-gtd:20070340
    • Haitao Liu, Yuanzhang Sun, Lin Cheng, Peng Wang, Feng Xiao, "Online Short-Term Reliability Evaluation Using Fast Sorting Technique", IET Generation, Transmission & Distribution, 2008, 2(1): 139-148. (Pubitemid 350280818)
    • (2008) IET Generation, Transmission and Distribution , vol.2 , Issue.1 , pp. 139-148
    • Liu, H.1    Sun, Y.2    Cheng, L.3    Wang, P.4    Xiao, F.5
  • 7
    • 0036124732 scopus 로고    scopus 로고
    • Reliability cost/worth assessment of distribution systemsincorporating time-varying weather conditions and restoration resources
    • Peng Wang, R. Billinton, "Reliability cost/worth assessment of distribution systemsincorporating time-varying weather conditions and restoration resources", IEEE Transaction on Power Delivery, 2002, 17(1): 260-265.
    • (2002) IEEE Transaction on Power Delivery , vol.17 , Issue.1 , pp. 260-265
    • Wang, P.1    Billinton, R.2
  • 8
    • 70350294291 scopus 로고    scopus 로고
    • A hybrid conditions dependent outage model of a transformer in reliability evaluation
    • Jian He, Yuanzhang Sun, Peng Wang, Lin Cheng, "A Hybrid Conditions Dependent Outage Model of a Transformer in Reliability Evaluation," IEEE Transactions on Power Delivery, 2009, 24(4): 2025-2033.
    • (2009) IEEE Transactions on Power Delivery , vol.24 , Issue.4 , pp. 2025-2033
    • He, J.1    Sun, Y.2    Wang, P.3    Cheng, L.4
  • 9
    • 0029457227 scopus 로고
    • A comparison of Monte carlo simulation techniques for compositepower system reliability assessment
    • Canada 15-16 May
    • R. Billinton, A. Sankarakrishnan, "A Comparison of Monte Carlo Simulation Techniques for Compositepower System Reliability Assessment", IEEE Communications, Power, and Computing. Conference Proceedings, Canada 15-16 May 1995, Page(s): 145-150 Vol.1.
    • (1995) IEEE Communications, Power, and Computing. Conference Proceedings , vol.1 , pp. 145-150
    • Billinton, R.1    Sankarakrishnan, A.2
  • 10
    • 40849126673 scopus 로고    scopus 로고
    • A novel state selection technique for power system reliability evaluation
    • Haitao Liu, Yuanzhang Sun, Peng Wang, Lin Cheng, "A Novel State Selection Technique For Power System Reliability Evaluation", Electric Power Systems Research, 2008, 78(6): 1019-1027.
    • (2008) Electric Power Systems Research , vol.78 , Issue.6 , pp. 1019-1027
    • Liu, H.1    Sun, Y.2    Wang, P.3    Cheng, L.4
  • 12
    • 0030109655 scopus 로고    scopus 로고
    • Evaluation of reliability worth and value of lost load
    • K.K.Kariuki, R.N.Allan. Evaluation of reliability worth and value of lost load. IEE Proc. -Gener. Transm. Distrib., vol. 143, no. 2, 1996, pp.171-180.
    • (1996) IEE Proc. -Gener. Transm. Distrib. , vol.143 , Issue.2 , pp. 171-180
    • Kariuki, K.K.1    Allan, R.N.2
  • 15
    • 0028482457 scopus 로고
    • Generating system operating health analysis considering stand-by units, interruptible load and postponable outages
    • R. Billinton, M. Fotuhi-Firuzabad, "Generating system operating health analysis considering stand-by units, interruptible load and postponable outages", IEEE Trans. Power Syst., 1994, 9, (3), pp. 1618-1625.
    • (1994) IEEE Trans. Power Syst. , vol.9 , Issue.3 , pp. 1618-1625
    • Billinton, R.1    Fotuhi-Firuzabad, M.2
  • 16
    • 3242744599 scopus 로고    scopus 로고
    • Large-scale composite generation and transmission system adequacy evaluation
    • Lin Cheng, Yuanzhang Sun, Wangqi Zheng, "Large-scale composite generation and transmission system adequacy evaluation. Automation of Electric Power Systems", Vol. 28, No. 11, pp. 75-78, 2004.
    • (2004) Automation of Electric Power Systems , vol.28 , Issue.11 , pp. 75-78
    • Cheng, L.1    Sun, Y.2    Zheng, W.3
  • 18
    • 0038580410 scopus 로고    scopus 로고
    • Well-being framework for composite Generation and transmission system reliability evaluation
    • L. Goel, C. Feng, "Well-being framework for composite Generation and transmission system reliability evaluation", IEE Proc.-Gener. Trans. Distrib., Vol.146, No.3, pp. 528-534, 1999.
    • (1999) IEE Proc.-Gener. Trans. Distrib. , vol.146 , Issue.3 , pp. 528-534
    • Goel, L.1    Feng, C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.