|
Volumn , Issue , 2009, Pages 188-192
|
Rescheduling a permutation flowshop problems under the arrival a new set ofjobs
|
Author keywords
Bi objective optimization; Flowshop; Rescheduling; Simulated annealing
|
Indexed keywords
BI-OBJECTIVE OPTIMIZATION;
FLOW-SHOPS;
PERMUTATION FLOW SHOPS;
PRACTICAL SOLUTIONS;
RESCHEDULING;
TWO STAGE;
ANNEALING;
INDUSTRIAL ENGINEERING;
SIMULATED ANNEALING;
|
EID: 77956113061
PISSN: None
EISSN: None
Source Type: Conference Proceeding
DOI: None Document Type: Conference Paper |
Times cited : (8)
|
References (9)
|