-
1
-
-
0022768294
-
A survey of exact algorithms for the simple assembly line balancing
-
I. Baybars, "A survey of exact algorithms for the simple assemblyline balancing", Management Science, Vol.32, No.8, pp909-932, 1986.
-
(1986)
Management Science
, vol.32
, Issue.8
, pp. 909-932
-
-
Baybars, I.1
-
2
-
-
33846998345
-
Stochastic U-line balancing using genetic algorithms
-
Baykasoǧlu, A., L. Özbakir, "Stochastic U-line balancingusing genetic algorithms", International Journal of Advanced ManufacturingTechnology, Vol.32, No.1-2, pp.139-147, 2007.
-
(2007)
International Journal of Advanced Manufacturing Technology
, vol.32
, Issue.1-2
, pp. 139-147
-
-
Baykasoǧlu, A.1
Özbakir, L.2
-
3
-
-
25144450992
-
A survey on problems and methods in generalized assembly line balancing
-
Becker, C, A. Scholl, "A survey on problems and methods ingeneralized assembly line balancing", European Journal of OperationalResearch, Vol.168, No.31,pp694-715,2006.
-
(2006)
European Journal of Operational Research
, vol.168
, Issue.31
, pp. 694-715
-
-
Becker, C.1
Scholl, A.2
-
4
-
-
17444423715
-
A heuristic approach for transfer lines balancing
-
Dolgui A., B. Finel, N. Guschinsky, G. Levin, F. Ver-nadat, "Aheuristic approach for transfer lines balancing", Journal of IntelligentManufacturing, Vol.16, No.2,pp 159-171.2005.
-
(2005)
Journal of Intelligent Manufacturing
, vol.16
, Issue.2
, pp. 159-171
-
-
Dolgui, A.1
Finel, B.2
Guschinsky, N.3
Levin, G.4
Ver-nadat, F.5
-
5
-
-
33746402024
-
MIP approach to balancing transfer lines with blocks of paralleloperations
-
DOI 10.1080/07408170500531334, PII JV4W5876HX373874
-
Dolgui, A., B. Finel, N. Guschinsky, G. Levin, F. Vernadat, "MIPapproach to balancing transfer lines with blocks of parallel operations",IIE Transactions, Vol.38, pp869-882, 2006. (Pubitemid 44123460)
-
(2006)
IIE Transactions (Institute of Industrial Engineers)
, vol.38
, Issue.10
, pp. 869-882
-
-
Dolgui, A.1
Finel, B.2
Guschinsky, N.3
Levin, G.4
Vernadat, F.5
-
6
-
-
0024641634
-
A comprehensive literature review and analysis of the design, balancingand scheduling of assembly lines
-
Ghosh, S., R. Gagnon, "A comprehensive literature review andanalysis of the design, balancing and scheduling of assembly lines",International Journal of Production Research, Vol.27, No.4, pp637-670, 1989.
-
(1989)
International Journal of Production Research
, vol.27
, Issue.4
, pp. 637-670
-
-
Ghosh, S.1
Gagnon, R.2
-
7
-
-
70449445066
-
Equilibrage des lignes ďusinage à boî tiersmultibroches avec la méthode GRASP
-
MOSIM08, Paris, France, 31 mars-2 avril, CD-ROM
-
Guschinskaya, O., A. Dolgui, "Equilibrage des lignes ďusinageà boîtiers multibroches avec la méthode GRASP", Actesde la 7e conférence Internationale francophone de modélisation etsimulation (MOSIM08), Paris, France, 31 mars-2 avril, 2008, CD-ROM, 10 pages.
-
(2008)
Actes de la 7e conférence Internationale francophone demodélisation et simulation
, pp. 10
-
-
Guschinskaya, O.1
Dolgui, A.2
-
8
-
-
70449398531
-
A transfer line balancing problem by heuristic methods: Industrial casestudies
-
Guschinskaya, O., A. Dolgui, "A transfer line balancing problem byheuristic methods: industrial case studies", Decision Making inManufacturing and Services, Vol.2, No.1-2, pp33-46, 2008.
-
(2008)
Decision Making in Manufacturing and Services
, vol.2
, Issue.1-2
, pp. 33-46
-
-
Guschinskaya, O.1
Dolgui, A.2
-
9
-
-
67651160370
-
Comparison of exact and heuristic methods for a transfer line balancingproblem
-
doi:10.1016/j.ijpe.2008.11.018
-
Guschinskaya, O., A. Dolgui, "Comparison of exact and heuristicmethods for a transfer line balancing problem", International Journal ofProduction Economics, doi:10.1016/j.ijpe.2008.11.018.
-
International Journal of Production Economics
-
-
Guschinskaya, O.1
Dolgui, A.2
-
11
-
-
0001017536
-
Genetic algorithms for the operations researcher
-
C.R. Reeves, "Genetic algorithms for the operationsresearcher", INFORMS Journal on Computing, Vol.9, No.3, pp231-250, 1997.
-
(1997)
INFORMS Journal on Computing
, vol.9
, Issue.3
, pp. 231-250
-
-
Reeves, C.R.1
|