메뉴 건너뛰기




Volumn 5, Issue 5, 2009, Pages 447-461

Trends in quantitative risk assessments

Author keywords

Causal chains; Decision making; Human and organisational factors; Quantitative risk assessments; Uncertainties

Indexed keywords


EID: 77955860239     PISSN: 09731318     EISSN: 29938341     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (8)

References (45)
  • 1
    • 77954773508 scopus 로고
    • Reactor safety study, an assessment of accident risks
    • Report NUREG-75/014, Washington, D.C. U.S. Nuclear Regulatory Commission
    • NRC, Reactor Safety Study, An Assessment of Accident Risks. Wash 1400. Report NUREG-75/014. Washington, D.C. U.S. Nuclear Regulatory Commission, 1975
    • (1975) Wash 1400
  • 2
    • 3042755044 scopus 로고    scopus 로고
    • How useful is quantitative risk assessment
    • Apostolakis, G. How Useful is Quantitative Risk Assessment, Risk Analysis. 24, 515-520, 2004.
    • (2004) Risk Analysis , vol.24 , pp. 515-520
    • Apostolakis, G.1
  • 3
    • 0003363849 scopus 로고
    • Acceptable risk
    • D.I. Blockley, Editor, McGraw-Hill, New York
    • Reid, S.G., Acceptable Risk. In: D.I. Blockley, Editor, Engineering Safety, McGraw-Hill, New York, pp. 138-166, 1992.
    • (1992) Engineering Safety , pp. 138-166
    • Reid, S.G.1
  • 4
    • 34047101420 scopus 로고    scopus 로고
    • Science, precaution and risk assessment: Towards more measured and constructive policy debate
    • Stirling, A., Science, Precaution and Risk Assessment: towards more measured and constructive policy debate, European Molecular Biology Organisation Reports, 8, 309-315, 2007.
    • (2007) European Molecular Biology Organisation Reports , vol.8 , pp. 309-315
    • Stirling, A.1
  • 5
    • 85014614766 scopus 로고    scopus 로고
    • Three decades of risk research: Accomplishments and new challenges
    • Renn, O., Three Decades of Risk Research: Accomplishments and New Challenges, Journal of Risk Research 1 (1), 49-71, 1998.
    • (1998) Journal of Risk Research , vol.1 , Issue.1 , pp. 49-71
    • Renn, O.1
  • 6
    • 84884707585 scopus 로고    scopus 로고
    • Risk at a turning point?
    • Stirling, A., Risk at a Turning Point?', Journal of Risk Research, 1, 97-109, 1998.
    • (1998) Journal of Risk Research , vol.1 , pp. 97-109
    • Stirling, A.1
  • 8
    • 0030286892 scopus 로고    scopus 로고
    • Uncertainties in risk analysis: Six levels of treatment
    • Paté-Cornell, ME., Uncertainties in Risk Analysis: Six Levels of Treatment, Reliability Engineering and System Safety, 54(2-3) 95-111, 1996.
    • (1996) Reliability Engineering and System Safety , vol.54 , Issue.2-3 , pp. 95-111
    • Paté-Cornell, M.E.1
  • 9
    • 0019540987 scopus 로고
    • On the quantitative definition of risk
    • Kaplan, S. and B.J. Garrick, On the Quantitative Definition of Risk, Risk Analysis, 1: 11-27, 1981.
    • (1981) Risk Analysis , vol.1 , pp. 11-27
    • Kaplan, S.1    Garrick, B.J.2
  • 15
    • 0025681550 scopus 로고
    • The concept of probability in safety assessments of technological systems
    • Apostolakis, G. The Concept of Probability in Safety Assessments of Technological Systems, Science, 250, 1359-1364, 1990.
    • (1990) Science , vol.250 , pp. 1359-1364
    • Apostolakis, G.1
  • 18
    • 61449177857 scopus 로고    scopus 로고
    • On risk defined as an event where the outcome is uncertain
    • Aven, T. and Renn, O., On Risk Defined As An Event Where the Outcome is Uncertain. J. Risk Research, 12, 1-11, 2009.
    • (2009) J. Risk Research , vol.12 , pp. 1-11
    • Aven, T.1    Renn, O.2
  • 20
    • 33646911442 scopus 로고    scopus 로고
    • IRGC, International Risk Governance Council, Author: O. Renn with Annexes by P. Graham. International Risk Governance Council. Geneva
    • IRGC, International Risk Governance Council, White Paper on Risk Governance. Towards an Integrative Approach. Author: O. Renn with Annexes by P. Graham. International Risk Governance Council. Geneva, 2005.
    • (2005) White Paper on Risk Governance. Towards An Integrative Approach
  • 26
    • 0020741474 scopus 로고
    • Possibility versus probability
    • Natvig, B., Possibility versus Probability. Fuzzy Sets and Systems 10: 31-36, 1983.
    • (1983) Fuzzy Sets and Systems , vol.10 , pp. 31-36
    • Natvig, B.1
  • 29
    • 0025028516 scopus 로고
    • Uncertainties in system analysis: Probabilistic versus nonprobabilistic Theories
    • Wu, J.S., Apostolakis, G.E. and Okrent, D.,. Uncertainties In System Analysis: Probabilistic Versus Nonprobabilistic Theories. Reliability Engineering and System Safety, 30: 163-181, 1990.
    • (1990) Reliability Engineering and System Safety , vol.30 , pp. 163-181
    • Wu, J.S.1    Apostolakis, G.E.2    Okrent, D.3
  • 32
    • 1342344540 scopus 로고    scopus 로고
    • A new accident model for engineering safer systems
    • Leveson, N., A New Accident Model for Engineering Safer Systems. Safety Science, 42, 237-270, 2004.
    • (2004) Safety Science , vol.42 , pp. 237-270
    • Leveson, N.1
  • 33
    • 0031279121 scopus 로고    scopus 로고
    • Risk management in a dynamic society: A modelling problem
    • Rasmussen, J., Risk Management in A Dynamic Society: A Modelling Problem. Safety Science 27 (2/ 3), 183-213, 1997.
    • (1997) Safety Science , vol.27 , Issue.2-3 , pp. 183-213
    • Rasmussen, J.1
  • 35
    • 33644750173 scopus 로고    scopus 로고
    • Quantifying the influence of safety management on the reliability of safety barriers
    • Duijm, N.J. and Goossens, L., Quantifying the Influence of Safety Management on the Reliability of Safety Barriers, Journal of Hazardous Materials. 130(3), 284-292, 2006.
    • (2006) Journal of Hazardous Materials , vol.130 , Issue.3 , pp. 284-292
    • Duijm, N.J.1    Goossens, L.2
  • 36
    • 39749127782 scopus 로고    scopus 로고
    • Methodology for incorporating humanand organizational factors in risk analyses for offshore installations
    • Aven, T., Hauge, S. Sklet, S. and Vinnem, J.E., Methodology for Incorporating Humanand Organizational Factors in Risk Analyses for Offshore Installations, Int. J. of Materials & Structural Reliability, 4, 1-14, 2006.
    • (2006) Int. J. of Materials & Structural Reliability , vol.4 , pp. 1-14
    • Aven, T.1    Hauge, S.2    Sklet, S.3    Vinnem, J.E.4
  • 37
    • 0030205540 scopus 로고    scopus 로고
    • Human and management factors in probabilistic risk analysis: The SAM approach and observations from recent applications
    • Paté-Cornell, E.M. and Murphy, D.M., Human and management factors in probabilistic risk analysis: the SAM approach and observations from recent applications. Reliability Engineering and System Safety, 53, 115-126, 1996.
    • (1996) Reliability Engineering and System Safety , vol.53 , pp. 115-126
    • Paté-Cornell, E.M.1    Murphy, D.M.2
  • 39
    • 84876459523 scopus 로고    scopus 로고
    • A hybrid technique for organizational safety risk analysis
    • Hong Kong, 19-23/5-08
    • Mohaghegh, Z., Kazemi, R. and Mosleh, A., A Hybrid Technique for Organizational Safety Risk Analysis. In Conference proceedings PSAM 9, Hong Kong, 19-23/5-08, 2008.
    • (2008) Conference proceedings PSAM 9
    • Mohaghegh, Z.1    Kazemi, R.2    Mosleh, A.3
  • 42
    • 33947576752 scopus 로고    scopus 로고
    • Risk assessment of organizational factors in aviation systems
    • Luxhøj, J. T., A. Choopavang, and D. N. Arendt, Risk Assessment of Organizational Factors in Aviation Systems, Air Traffic Control Quarterly, Vol. 9, No. 3, pp. 135-174, 2001.
    • (2001) Air Traffic Control Quarterly , vol.9 , Issue.3 , pp. 135-174
    • Luxhøj, J.T.1    Choopavang, A.2    Arendt, D.N.3
  • 45
    • 0029112020 scopus 로고
    • Risk perception and communication unplugged: Twenty years of process
    • Fischhoff, B., Risk Perception and Communication Unplugged: Twenty Years of Process, Risk Analysis, 15, 501-527, 1995.
    • (1995) Risk Analysis , vol.15 , pp. 501-527
    • Fischhoff, B.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.