메뉴 건너뛰기




Volumn 37, Issue 8, 2010, Pages 1094-1106

Enhancing construction project supply chains and performance evaluation methods: A case study of a bridge construction project

Author keywords

Computer simulation; Construction supply chain management; SCOR

Indexed keywords

BRIDGE CONSTRUCTIONS; COMMUNICATION EFFICIENCY; CONSTRUCTION PROJECTS; CONSTRUCTION STAGES; CONSTRUCTION SUPPLY CHAIN; CONSTRUCTION SUPPLY CHAIN MANAGEMENT; HYBRID MODELING; MATERIALS MANAGEMENT; OPERATIONAL MODELING; PERFORMANCE EVALUATION; PROJECT MANAGERS; SCOR MODELS; SUPPLY CHAIN OPERATIONS REFERENCES; SUPPLY CHAIN PROCESS; WIN-WIN;

EID: 77955521708     PISSN: 03151468     EISSN: None     Source Type: Journal    
DOI: 10.1139/L10-047     Document Type: Article
Times cited : (19)

References (12)
  • 2
    • 0000545232 scopus 로고
    • Tests for building confidence in system dynamics models
    • North-Holland Publishing Company, New York
    • Forrester, J.W., and Senge, P.M. 1980. Tests for building confidence in system dynamics models. TIMS Studies in the Management Sciences 14: North-Holland Publishing Company, New York.
    • (1980) TIMS Studies In the Management Sciences 14
    • Forrester, J.W.1    Senge, P.M.2
  • 3
    • 77955535394 scopus 로고    scopus 로고
    • A hierarchical approach to supply chain simulation modeling using the Supply Chain Operations Reference model
    • University of Maryland, College Park, Md
    • Herrmann, J.W., and Guruprasad, P. 2006. A hierarchical approach to supply chain simulation modeling using the Supply Chain Operations Reference model. Department of Mechanical Engineering and Institute for Systems Research, University of Maryland, College Park, Md.
    • (2006) Department of Mechanical Engineering and Institute For Systems Research
    • Herrmann, J.W.1    Guruprasad, P.2
  • 5
    • 2342594456 scopus 로고    scopus 로고
    • A review and analysis of supply chain operation reference (SCOR) model
    • doi:10.1108/13598540410517557
    • Huan, S.H., Sheoran, S.K., and Wang, G. 2004. A review and analysis of supply chain operation reference (SCOR) model. Supply Chain Management: An International Journal, 9(1): 23-29. doi:10.1108/13598540410517557.
    • (2004) Supply Chain Management: An International Journal , vol.9 , Issue.1 , pp. 23-29
    • Huan, S.H.1    Sheoran, S.K.2    Wang, G.3
  • 7
    • 12444305434 scopus 로고    scopus 로고
    • Linking SCOR planning practices to supply chain performance: An exploratory study
    • doi:10.1108/01443570410569010
    • Lockamy, III A., and McCormack, K. 2004. Linking SCOR planning practices to supply chain performance: An exploratory study. International Journal of Operations & Production Management, 24(12): 1192-1218. doi:10.1108/01443570410569010.
    • (2004) International Journal of Operations & Production Management , vol.24 , Issue.12 , pp. 1192-1218
    • Lockamy, A.1    McCormack, K.2
  • 9
    • 13244251277 scopus 로고    scopus 로고
    • Towards an agent-based construction supply network modelling and simulation platform
    • doi:10.1016/j.autcon.2004.08.003
    • Tah, J.H.M. 2005. Towards an agent-based construction supply network modelling and simulation platform. Automation in Construction, 14(3): 353-359. doi:10.1016/j.autcon.2004.08.003.
    • (2005) Automation In Construction , vol.14 , Issue.3 , pp. 353-359
    • Tah, J.H.M.1
  • 10
    • 33645150497 scopus 로고    scopus 로고
    • Developing a resource supply chain planning system for construction projects
    • doi:10.1061/(ASCE)0733-9364(2006)132:4(393)
    • Tserng, H.P., Yin, S.Y.L., and Li, S. 2006. Developing a resource supply chain planning system for construction projects. Journal of Construction Engineering and Management, 132(4): 393-407. doi:10.1061/(ASCE)0733-9364(2006)132:4(393).
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.4 , pp. 393-407
    • Tserng, H.P.1    Yin, S.Y.L.2    Li, S.3
  • 11
    • 0034391514 scopus 로고    scopus 로고
    • The four roles of supply chain management in construction
    • doi:10.1016/S0969- 7012(00)00013-7
    • Vrijhoef, R., and Koskela, L. 2000. The four roles of supply chain management in construction. European Journal of Purchasing and Supply Management, 6(3-4): 169-178. doi:10.1016/S0969- 7012(00)00013-7.
    • (2000) European Journal of Purchasing and Supply Management , vol.6 , Issue.3-4 , pp. 169-178
    • Vrijhoef, R.1    Koskela, L.2
  • 12
    • 13944254414 scopus 로고    scopus 로고
    • Strategic positioning of inventory to match demand in a capital projects supply chain
    • doi:10.1061/(ASCE) 0733-9364(2004)130:6(818).
    • Walsh, K.D., Hershauer, J.C., Tommelein, I.D., and Walsh, T.A. 2004. Strategic positioning of inventory to match demand in a capital projects supply chain. Journal of Construction Engineering and Management, 130(6): 818-826. doi:10.1061/(ASCE) 0733-9364(2004)130:6(818).
    • (2004) Journal of Construction Engineering and Management , vol.130 , Issue.6 , pp. 818-826
    • Walsh, K.D.1    Hershauer, J.C.2    Tommelein, I.D.3    Walsh, T.A.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.