메뉴 건너뛰기




Volumn 184, Issue 2, 2007, Pages 945-949

Erratum to: A note on flow shop scheduling problems with a learning effect on no-idle dominant machines [Appl. Math. Comput. 184 (2007) 945-949] (DOI:10.1016/j.amc.2006.05.206);A note on flow shop scheduling problems with a learning effect on no-idle dominant machines

Author keywords

Algorithm; Learning effect; Permutation flow shop; Scheduling

Indexed keywords

ALGORITHMS; CONSTRAINT THEORY; LEARNING SYSTEMS; OPTIMIZATION; POLYNOMIALS; PROBLEM SOLVING;

EID: 33846617917     PISSN: 00963003     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.amc.2007.10.049     Document Type: Erratum
Times cited : (26)

References (14)
  • 1
    • 0345201636 scopus 로고    scopus 로고
    • Single-machine scheduling with learning consideration
    • Biskup D. Single-machine scheduling with learning consideration. European Journal of Operational Research 115 (1999) 173-178
    • (1999) European Journal of Operational Research , vol.115 , pp. 173-178
    • Biskup, D.1
  • 5
    • 0017918132 scopus 로고
    • Flow shop and job-shop schedules: complexity and approximation
    • Gonzalez T., and Sahni S. Flow shop and job-shop schedules: complexity and approximation. Operations Research 26 (1978) 36-52
    • (1978) Operations Research , vol.26 , pp. 36-52
    • Gonzalez, T.1    Sahni, S.2
  • 6
    • 0002906088 scopus 로고    scopus 로고
    • Some results of the worst-case analysis for flow shop scheduling
    • Smutnicki C. Some results of the worst-case analysis for flow shop scheduling. European Journal of Operational Research 109 (1998) 66-87
    • (1998) European Journal of Operational Research , vol.109 , pp. 66-87
    • Smutnicki, C.1
  • 9
  • 12
    • 0742284281 scopus 로고    scopus 로고
    • Minimizing total completion time in a two-machine flow-shop with a learning effect
    • Lee W.-C., and Wu C.-C. Minimizing total completion time in a two-machine flow-shop with a learning effect. International Journal Production Economics 88 (2004) 85-93
    • (2004) International Journal Production Economics , vol.88 , pp. 85-93
    • Lee, W.-C.1    Wu, C.-C.2
  • 13
    • 33846562605 scopus 로고    scopus 로고
    • A makespan study of the two-machine flow-shop scheduling problem with a learning effect
    • Wu C.-C. A makespan study of the two-machine flow-shop scheduling problem with a learning effect. Journal of Statistics and Management Systems 8 (2005) 13-25
    • (2005) Journal of Statistics and Management Systems , vol.8 , pp. 13-25
    • Wu, C.-C.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.