메뉴 건너뛰기




Volumn 36, Issue C, 2010, Pages 65-72

Simultaneous balancing and scheduling of flexible mixed model assembly lines with sequence-dependent setup times

Author keywords

Balancing; Constraint Programming; Mixed Integer Programming; Mixed Model Assembly Lines; Scheduling; Sequencing

Indexed keywords


EID: 77954920614     PISSN: 15710653     EISSN: 15710653     Source Type: Journal    
DOI: 10.1016/j.endm.2010.05.009     Document Type: Article
Times cited : (17)

References (3)
  • 1
    • 77954904765 scopus 로고    scopus 로고
    • ILOG, OPL Studio 3.7.
    • ILOG, OPL Studio 3.7,(2003).
    • (2003)
  • 2
    • 77954920217 scopus 로고    scopus 로고
    • Machine Loading, Tool Allocation and Scheduling Problems in Flexible Manufacturing Systems, IEEE International Conference on Robotics and Automation, Barcelona, Spain.
    • Quiroga O.D., Zebellos L.J., and Henning G.P., Machine Loading, Tool Allocation and Scheduling Problems in Flexible Manufacturing Systems, IEEE International Conference on Robotics and Automation, Barcelona, Spain. (2005).
    • (2005)
    • Quiroga, O.D.1    Zebellos, L.J.2    Henning, G.P.3
  • 3
    • 0037121160 scopus 로고    scopus 로고
    • Monolithic vs. hierarchical balancing and scheduling of a flexible assembly line
    • Sawik T. Monolithic vs. hierarchical balancing and scheduling of a flexible assembly line. European Journal of Operational Research 2002, 143:115-124.
    • (2002) European Journal of Operational Research , vol.143 , pp. 115-124
    • Sawik, T.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.