-
1
-
-
77954884689
-
Study and development of assembly line balancing system
-
in Chinese
-
Luo Zhuo, Wu Naiqi. Study and development of assembly line balancing system[J]. Industrial Engineering Journal, 2007, 10(1): 103-107(in Chinese)
-
(2007)
Industrial Engineering Journal
, vol.10
, Issue.1
, pp. 103-107
-
-
Luo, Z.1
Wu, N.2
-
3
-
-
38949137145
-
Branch-and-bound algorithms for simple assembly line balancing problem
-
Liu S, Ng K, Ong H. Branch-and-bound algorithms for simple assembly line balancing problem[J]. The International Journal of Advanced Manufacturing Technology, 2008, 36(1): 169-177.
-
(2008)
The International Journal of Advanced Manufacturing Technology
, vol.36
, Issue.1
, pp. 169-177
-
-
Liu, S.1
Ng, K.2
Ong, H.3
-
4
-
-
40749094894
-
Mixed-model assembly line balance for mass customization
-
in Chinese
-
Yuan Minghai, Li Dongbo, Yu Minjian. Mixed-model assembly line balance for mass customization[J]. Computer Integrated Manufacturing Systems, 2008, 14(1): 79-83(in Chinese)
-
(2008)
Computer Integrated Manufacturing Systems
, vol.14
, Issue.1
, pp. 79-83
-
-
Yuan, M.1
Li, D.2
Yu, M.3
-
5
-
-
27744559270
-
Stochastic assembly line balancing using beam search
-
Erel E, Sabuncuoglu I, Sekerci H. Stochastic assembly line balancing using beam search[J]. International Journal of Production Research, 2005, 43(7): 1411-1426.
-
(2005)
International Journal of Production Research
, vol.43
, Issue.7
, pp. 1411-1426
-
-
Erel, E.1
Sabuncuoglu, I.2
Sekerci, H.3
-
6
-
-
25144504530
-
A heuristic solution for fuzzy mixed-model line balancing problem
-
Hop N V. A heuristic solution for fuzzy mixed-model line balancing problem[J]. European Journal of Operational Research, 2006, 168(3): 798-810.
-
(2006)
European Journal of Operational Research
, vol.168
, Issue.3
, pp. 798-810
-
-
Hop, N.V.1
-
8
-
-
0007063545
-
Minmax regret median location on a network under uncertainty
-
Averbakh I, Berman O. Minmax regret median location on a network under uncertainty[J]. Informs Journal on Computing, 2000, 12(2): 104-110.
-
(2000)
Informs Journal on Computing
, vol.12
, Issue.2
, pp. 104-110
-
-
Averbakh, I.1
Berman, O.2
-
9
-
-
0348233470
-
A branch and bound algorithm for the robust shortest path problem with interval data
-
Montemanni R, Gambardella L M, Donati A V. A branch and bound algorithm for the robust shortest path problem with interval data[J]. Operations Research Letters, 2004, 32(3): 225-232.
-
(2004)
Operations Research Letters
, vol.32
, Issue.3
, pp. 225-232
-
-
Montemanni, R.1
Gambardella, L.M.2
Donati, A.V.3
-
10
-
-
7544232733
-
A branch and bound algorithm for the robust spanning tree problem with interval data
-
Montemanni R, Gambardella L M. A branch and bound algorithm for the robust spanning tree problem with interval data[J]. European Journal of Operational Research, 2005, 161(3): 771-779.
-
(2005)
European Journal of Operational Research
, vol.161
, Issue.3
, pp. 771-779
-
-
Montemanni, R.1
Gambardella, L.M.2
-
11
-
-
0033894477
-
Robust scheduling of a two-machine flow Shop with uncertain processing times
-
Kouvelis P, Daniels R L, Vairaktarakis G. Robust scheduling of a two-machine flow Shop with uncertain processing times[J]. IIE Transactions, 2000, 32(5): 421-432.
-
(2000)
IIE Transactions
, vol.32
, Issue.5
, pp. 421-432
-
-
Kouvelis, P.1
Daniels, R.L.2
Vairaktarakis, G.3
-
12
-
-
60749131201
-
The robust traveling salesman problem with interval data
-
Montemanni R, Barta J, Mastrolilli M, et al. The robust traveling salesman problem with interval data[J]. Transportation Science, 2007, 41(3): 366-381.
-
(2007)
Transportation Science
, vol.41
, Issue.3
, pp. 366-381
-
-
Montemanni, R.1
Barta, J.2
Mastrolilli, M.3
-
14
-
-
77951130921
-
Homepage for assembly line optimization research
-
Scholl A.Homepage for assembly line optimization research[EB/OL].[2008-07-05]. http://www.assembly-line-balancing.de/.
-
-
-
Scholl, A.1
|