-
2
-
-
12144259310
-
Wind power planning: Assessing long term costs and benefits
-
S. Kennedy, "Wind power planning: Assessing long term costs and benefits," Energy Policy, vol. 33, pp. 1661-1675, 2005.
-
(2005)
Energy Policy
, vol.33
, pp. 1661-1675
-
-
Kennedy, S.1
-
3
-
-
0026963683
-
Optimum windmill -site matching
-
Z. M. Salameh and I. Safari, "Optimum windmill -site matching," IEEE Trans. Energy Convers., vol. 4, no. 7, pp. 669-675, 1992.
-
(1992)
IEEE Trans. Energy Convers
, vol.4
, Issue.7
, pp. 669-675
-
-
Salameh, Z.M.1
Safari, I.2
-
4
-
-
0032652440
-
Determination of the optimum site-matching wind turbine using risk-based capacity benefit factors
-
Jan
-
H. Chen, R. Billinton, "Determination of the optimum site-matching wind turbine using risk-based capacity benefit factors," IEE Proc-Gener. Transm. Distrib., vol. 146, no. 1, pp. 96-100, Jan. 1999.
-
(1999)
IEE Proc-Gener. Transm. Distrib
, vol.146
, Issue.1
, pp. 96-100
-
-
Chen, H.1
Billinton, R.2
-
6
-
-
0030233016
-
Generation availability assessment of wind farms
-
Sep
-
F. C. Sayas, and R. N. Allan, "Generation availability assessment of wind farms," Proc. Inst. Elect. Eng., Gen., Transm., Distrib., vol. 143, no. 5, pp. 507-518, Sep. 1996.
-
(1996)
Proc. Inst. Elect. Eng., Gen., Transm., Distrib
, vol.143
, Issue.5
, pp. 507-518
-
-
Sayas, F.C.1
Allan, R.N.2
-
7
-
-
33847611597
-
Probabilistic wind farms generation model for reliability studies applied to Brazilian sites
-
Nov
-
A. P. Leite, C. L. T. Borges, D. M. Falcão, "Probabilistic wind farms generation model for reliability studies applied to Brazilian sites," IEEE Trans. Power Syst., vol. 21, no. 4, pp. 1493-1501, Nov. 2006.
-
(2006)
IEEE Trans. Power Syst
, vol.21
, Issue.4
, pp. 1493-1501
-
-
Leite, A.P.1
Borges, C.L.T.2
Falcão, D.M.3
-
8
-
-
40849098849
-
Multistate wind energy conversion system models for adequacy assessment of generating systems incorporating wind energy
-
Mar
-
R. Billinton and Y. Gao, "Multistate wind energy conversion system models for adequacy assessment of generating systems incorporating wind energy," IEEE Trans. Energy Convers., vol. 23, no. 1, pp. 163-170, Mar. 2008.
-
(2008)
IEEE Trans. Energy Convers
, vol.23
, Issue.1
, pp. 163-170
-
-
Billinton, R.1
Gao, Y.2
-
9
-
-
0020497503
-
Development of a new procedure for reliability modeling of wind turbine generators
-
Jan
-
P. Giorsetto and F. K. Utsurogi, "Development of a new procedure for reliability modeling of wind turbine generators", IEEE Trans. Power App. Syst., vol. 102, no. 1, pp. 134-143, Jan. 1983.
-
(1983)
IEEE Trans. Power App. Syst
, vol.102
, Issue.1
, pp. 134-143
-
-
Giorsetto, P.1
Utsurogi, F.K.2
-
10
-
-
84857630509
-
-
Available
-
[Online]. Available: http://www.vestas.com.
-
-
-
-
11
-
-
84857630072
-
-
Available
-
[Online]. Available: http://www.gewindenergy.com/
-
-
-
-
12
-
-
78651576849
-
-
Iranian Renewable Energy Organization Archives, Tehran, Iran
-
Iranian Renewable Energy Organization Archives, Tehran, Iran.
-
-
-
-
13
-
-
0030241740
-
Time-series models for reliability evaluation of power systems including wind energy
-
R. Billinton, H. Chen, and R. Ghajar, "Time-series models for reliability evaluation of power systems including wind energy," Microelectron. Rel., vol. 36, no. 9, pp. 1253-1261, 1996.
-
(1996)
Microelectron. Rel
, vol.36
, Issue.9
, pp. 1253-1261
-
-
Billinton, R.1
Chen, H.2
Ghajar, R.3
-
14
-
-
0024719222
-
A reliability test system for educational purposes basic data
-
Aug
-
R. Billinton, S. Kumar, N. Chowdhury, K. Debnath, L. Goel, E. Khan, P. Kos, G. Nourbakhsh, and J. Oteng-Adjei, "A reliability test system for educational purposes basic data," IEEE Trans. Power Syst., vol. 4, no. 4, pp. 1238-1244, Aug. 1989.
-
(1989)
IEEE Trans. Power Syst
, vol.4
, Issue.4
, pp. 1238-1244
-
-
Billinton, R.1
Kumar, S.2
Chowdhury, N.3
Debnath, K.4
Goel, L.5
Khan, E.6
Kos, P.7
Nourbakhsh, G.8
Oteng-Adjei, J.9
|