Mathematical programming approaches to capacity-constrained MRP systems:Review, formulation and problem reduction
-
P. J. Billington, J. D. McClain and L. J. Thomas, Mathematicalprogramming approaches to capacity-constrained MRP systems: Review, formulationand problem reduction, Manag. Sci., Vol. 29, No. 10, pp. 1126-1141, 1983.
-
(1983)
Manag. Sci.
, vol.29
, Issue.10
, pp. 1126-1141
-
-
Billington, P.J.1
McClain, J.D.2
Thomas, L.J.3
-
3
-
-
84990557283
-
A new framework for manufacturing planning and control systems
-
C. C. Sum and A. V. Hill, A new framework for manufacturing planning andcontrol systems, Decision Sci., Vol. 24, No. 4, pp. 739-760, 1993.
-
(1993)
Decision Sci.
, vol.24
, Issue.4
, pp. 739-760
-
-
Sum, C.C.1
Hill, A.V.2
-
4
-
-
0031126052
-
Integrating MRP and finite capacity planning
-
M. Taal, and J. C. Wortmann, Integrating MRP and finite capacityplanning, Prod. Plan. Control, Vol. 8, No. 3, pp. 245-254, 1997.
-
(1997)
Prod. Plan. Control
, vol.8
, Issue.3
, pp. 245-254
-
-
Taal, M.1
Wortmann, J.C.2
-
7
-
-
63849331000
-
Production logistics system based on a hybrid push/pull control strategyin make-to-order environments
-
B. Li, and C. Yang, Production logistics system based on a hybridPush/Pull control strategy in Make-to-Order environments, International Journalof Innovative Computing, Information and Control, Vol. 5, No. 5, pp. 1343-1350,2009.
-
(2009)
International Journal of Innovative Computing, Information and Control
, vol.5
, Issue.5
, pp. 1343-1350
-
-
Li, B.1
Yang, C.2
-
8
-
-
0021428250
-
An integrated model for master scheduling, lot sizing and capacityrequirements planning
-
A. C. Bahl and L. P. Ritzman, An integrated model for master scheduling,lot sizing and capacity requirements planning, J. Oper. Res. Soc, Vol. 35, No.5, pp. 389-399, 1984.
-
(1984)
J. Oper. Res. Soc
, vol.35
, Issue.5
, pp. 389-399
-
-
Bahl, A.C.1
Ritzman, L.P.2
-
9
-
-
0023343801
-
Scheduling tasks with due dates in a fabrication/assembly process
-
B. Faaland, and T. Schmitt, Scheduling tasks with due dates in afabrication/assembly process, Oper. Res., Vol. 35, No. 3, pp. 378-388, 1987.
-
(1987)
Oper. Res.
, vol.35
, Issue.3
, pp. 378-388
-
-
Faaland, B.1
Schmitt, T.2
-
10
-
-
0020206915
-
Schedule based MRP: An integrated approach to production scheduling andmaterial requirements planning
-
N. A. J. Hastings, P. Marshall and R. J. Willis, Schedule based MRP: Anintegrated approach to production scheduling and material requirements planning,J. Oper. Res. Soc, Vol. 3, No. 11, pp. 1021-1029, 1982.
-
(1982)
J. Oper. Res. Soc
, vol.3
, Issue.11
, pp. 1021-1029
-
-
Hastings, N.A.J.1
Marshall, P.2
Willis, R.J.3
-
11
-
-
0028769399
-
On practical resource allocation for production planning and schedulingwith period overlapping setups
-
C. Dillenberger, L. F. Escudeero, A. Wollensak and W. Zhang, On practicalresource allocation for production planning and scheduling with periodoverlapping setups, Eur. J. Oper. Res., Vol. 75, No. 2, pp. 275-286, 1994.
-
(1994)
Eur. J. Oper. Res.
, vol.75
, Issue.2
, pp. 275-286
-
-
Dillenberger, C.1
Escudeero, L.F.2
Wollensak, A.3
Zhang, W.4
-
12
-
-
0034516883
-
Integration of assembly and fabrication for make-to-order production
-
R. Kolish, Integration of assembly and fabrication for make-to-orderproduction, Int. J. Prod. Econ., Vol. 38, No. 3, pp. 287-306, 2000.
-
(2000)
Int. J. Prod. Econ.
, vol.38
, Issue.3
, pp. 287-306
-
-
Kolish, R.1
-
13
-
-
3142777327
-
Advanced planning and scheduling based on precedence and resourceconstraints for e-plant chains
-
C. Moon, J. S. Kim and M. Gen, Advanced planning and scheduling based onprecedence and resource constraints for e-plant chains, Int. J. Prod. Res., Vol.42, No. 15, pp. 2941-2955, 2004.
-
(2004)
Int. J. Prod. Res.
, vol.42
, Issue.15
, pp. 2941-2955
-
-
Moon, C.1
Kim, J.S.2
Gen, M.3
-
14
-
-
77953880044
-
Production planning and scheduling approach in a supply chain
-
Chiang Rai, Thailand
-
R. Masuchun, Production planning and scheduling approach in a supplychain, Proc. of the 2007 Electrical Engineering/Electronics, Computer,Telecommunications and Information Technology (ECTI) International Conference,vol. 09-12, PP. 585-588, Chiang Rai, Thailand, 2007.
-
(2007)
Proc. of the 2007 Electrical Engineering/Electronics, Computer,Telecommunications and Information Technology (ECTI) International Conference
, vol.9-12
, pp. 585-588
-
-
Masuchun, R.1
-
17
-
-
0004048738
-
-
Springer: Berlin
-
J. Blazewicz, K. H. Ecker, E. Pesch, G. Schmidt and J. Weglarz,Scheduling Computer and Manufacturing Processes, Springer: Berlin, 2001.
-
(2001)
Scheduling Computer and Manufacturing Processes
-
-
Blazewicz, J.1
Ecker, K.H.2
Pesch, E.3
Schmidt, G.4
Weglarz, J.5
-
19
-
-
0032141635
-
A multi-objective genetic local search algorithm and its application toflowshop scheduling
-
H. Ishibuchi, and T. Murata, A multi-objective genetic local searchalgorithm and its application to flowshop scheduling, IEEE T. Syst. Man. Cy. C,Vol. 28, No. 3, pp. 392-403, 1998.
-
(1998)
IEEE T. Syst. Man. Cy. C
, vol.28
, Issue.3
, pp. 392-403
-
-
Ishibuchi, H.1
Murata, T.2
-
20
-
-
0030241443
-
Genetic algorithms for flowshop scheduling problems
-
T. Murata, H. Ishibuchi and H. Tanaka, Genetic algorithms for flowshopscheduling problems, Comput. Ind. Eng., Vol. 30, No. 4, pp. 1061-1071, 1996.
-
(1996)
Comput. Ind. Eng.
, vol.30
, Issue.4
, pp. 1061-1071
-
-
Murata, T.1
Ishibuchi, H.2
Tanaka, H.3
-
21
-
-
0030241820
-
Multi-objective genetic algorithm and its applications to flowshopscheduling
-
T. Murata, H. Ishibuchi and H. Tanaka, Multi-objective genetic algorithmand its applications to flowshop scheduling, Comput. Ind. Eng., Vol. 30, No. 4,pp. 957-968, 1996.
-
(1996)
Comput. Ind. Eng.
, vol.30
, Issue.4
, pp. 957-968
-
-
Murata, T.1
Ishibuchi, H.2
Tanaka, H.3
-
22
-
-
33749498988
-
Scheduling for efficiency and stability in the dynamic job shop
-
R. Rangsaritratsamee, and W. G. Ferrell, Scheduling for efficiency andstability in the dynamic job shop, Int. J. Ind. Eng. Theory Appl. Pract., Vol.12, No. 3, pp. 206-217, 2005.
-
(2005)
Int. J. Ind. Eng. Theory Appl. Pract.
, vol.12
, Issue.3
, pp. 206-217
-
-
Rangsaritratsamee, R.1
Ferrell, W.G.2
-
23
-
-
1442285828
-
Dynamic rescheduling that simultaneously considers efficiency andstability
-
R. Rangsaritratsamee, W. G. Ferrell Jr. and M. E. Kurz, Dynamicrescheduling that simultaneously considers efficiency and stability, Comput.Ind. Eng., Vol. 46, pp. 1-15, 2004.
-
(2004)
Comput. Ind. Eng.
, vol.46
, pp. 1-15
-
-
Rangsaritratsamee, R.1
Ferrell Jr., W.G.2
Kurz, M.E.3
-
24
-
-
48249144997
-
Adaptive genetic algorithms for multi-resource constrained projectscheduling problem with multiple modes
-
K. Kim, M. Gen and M. Kim, Adaptive genetic algorithms for multi-resourceconstrained project scheduling problem with multiple modes, InternationalJournal of Innovative Computing, Information and Control, Vol. 2, No. 1, pp.41-49, 2006.
-
(2006)
International Journal of Innovative Computing, Information and Control
, vol.2
, Issue.1
, pp. 41-49
-
-
Kim, K.1
Gen, M.2
Kim, M.3
|