메뉴 건너뛰기




Volumn 3, Issue 3, 2009, Pages 501-506

Integrating production scheduling and Material Requirements Planning

Author keywords

Advanced planning and scheduling (APS); Bill of material (BOM); Integerlinear programming model; Material requirements planning (MRP)

Indexed keywords

ADVANCED PLANNING AND SCHEDULING; BILL OF MATERIALS; CAPACITY CONSTRAINTS; MATERIAL REQUIREMENTS PLANNING; NUMERICAL RESULTS; OBJECTIVE FUNCTIONS; OPERATING SEQUENCES; PLANNING AND SCHEDULING; PRODUCTION PLANS; PRODUCTION SCHEDULING; PROGRAMMING MODELS;

EID: 77953910278     PISSN: 1881803X     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (13)

References (24)
  • 2
    • 0020832935 scopus 로고
    • Mathematical programming approaches to capacity-constrained MRP systems:Review, formulation and problem reduction
    • P. J. Billington, J. D. McClain and L. J. Thomas, Mathematicalprogramming approaches to capacity-constrained MRP systems: Review, formulationand problem reduction, Manag. Sci., Vol. 29, No. 10, pp. 1126-1141, 1983.
    • (1983) Manag. Sci. , vol.29 , Issue.10 , pp. 1126-1141
    • Billington, P.J.1    McClain, J.D.2    Thomas, L.J.3
  • 3
    • 84990557283 scopus 로고
    • A new framework for manufacturing planning and control systems
    • C. C. Sum and A. V. Hill, A new framework for manufacturing planning andcontrol systems, Decision Sci., Vol. 24, No. 4, pp. 739-760, 1993.
    • (1993) Decision Sci. , vol.24 , Issue.4 , pp. 739-760
    • Sum, C.C.1    Hill, A.V.2
  • 4
    • 0031126052 scopus 로고    scopus 로고
    • Integrating MRP and finite capacity planning
    • M. Taal, and J. C. Wortmann, Integrating MRP and finite capacityplanning, Prod. Plan. Control, Vol. 8, No. 3, pp. 245-254, 1997.
    • (1997) Prod. Plan. Control , vol.8 , Issue.3 , pp. 245-254
    • Taal, M.1    Wortmann, J.C.2
  • 7
    • 63849331000 scopus 로고    scopus 로고
    • Production logistics system based on a hybrid push/pull control strategyin make-to-order environments
    • B. Li, and C. Yang, Production logistics system based on a hybridPush/Pull control strategy in Make-to-Order environments, International Journalof Innovative Computing, Information and Control, Vol. 5, No. 5, pp. 1343-1350,2009.
    • (2009) International Journal of Innovative Computing, Information and Control , vol.5 , Issue.5 , pp. 1343-1350
    • Li, B.1    Yang, C.2
  • 8
    • 0021428250 scopus 로고
    • An integrated model for master scheduling, lot sizing and capacityrequirements planning
    • A. C. Bahl and L. P. Ritzman, An integrated model for master scheduling,lot sizing and capacity requirements planning, J. Oper. Res. Soc, Vol. 35, No.5, pp. 389-399, 1984.
    • (1984) J. Oper. Res. Soc , vol.35 , Issue.5 , pp. 389-399
    • Bahl, A.C.1    Ritzman, L.P.2
  • 9
    • 0023343801 scopus 로고
    • Scheduling tasks with due dates in a fabrication/assembly process
    • B. Faaland, and T. Schmitt, Scheduling tasks with due dates in afabrication/assembly process, Oper. Res., Vol. 35, No. 3, pp. 378-388, 1987.
    • (1987) Oper. Res. , vol.35 , Issue.3 , pp. 378-388
    • Faaland, B.1    Schmitt, T.2
  • 10
    • 0020206915 scopus 로고
    • Schedule based MRP: An integrated approach to production scheduling andmaterial requirements planning
    • N. A. J. Hastings, P. Marshall and R. J. Willis, Schedule based MRP: Anintegrated approach to production scheduling and material requirements planning,J. Oper. Res. Soc, Vol. 3, No. 11, pp. 1021-1029, 1982.
    • (1982) J. Oper. Res. Soc , vol.3 , Issue.11 , pp. 1021-1029
    • Hastings, N.A.J.1    Marshall, P.2    Willis, R.J.3
  • 11
    • 0028769399 scopus 로고
    • On practical resource allocation for production planning and schedulingwith period overlapping setups
    • C. Dillenberger, L. F. Escudeero, A. Wollensak and W. Zhang, On practicalresource allocation for production planning and scheduling with periodoverlapping setups, Eur. J. Oper. Res., Vol. 75, No. 2, pp. 275-286, 1994.
    • (1994) Eur. J. Oper. Res. , vol.75 , Issue.2 , pp. 275-286
    • Dillenberger, C.1    Escudeero, L.F.2    Wollensak, A.3    Zhang, W.4
  • 12
    • 0034516883 scopus 로고    scopus 로고
    • Integration of assembly and fabrication for make-to-order production
    • R. Kolish, Integration of assembly and fabrication for make-to-orderproduction, Int. J. Prod. Econ., Vol. 38, No. 3, pp. 287-306, 2000.
    • (2000) Int. J. Prod. Econ. , vol.38 , Issue.3 , pp. 287-306
    • Kolish, R.1
  • 13
    • 3142777327 scopus 로고    scopus 로고
    • Advanced planning and scheduling based on precedence and resourceconstraints for e-plant chains
    • C. Moon, J. S. Kim and M. Gen, Advanced planning and scheduling based onprecedence and resource constraints for e-plant chains, Int. J. Prod. Res., Vol.42, No. 15, pp. 2941-2955, 2004.
    • (2004) Int. J. Prod. Res. , vol.42 , Issue.15 , pp. 2941-2955
    • Moon, C.1    Kim, J.S.2    Gen, M.3
  • 19
    • 0032141635 scopus 로고    scopus 로고
    • A multi-objective genetic local search algorithm and its application toflowshop scheduling
    • H. Ishibuchi, and T. Murata, A multi-objective genetic local searchalgorithm and its application to flowshop scheduling, IEEE T. Syst. Man. Cy. C,Vol. 28, No. 3, pp. 392-403, 1998.
    • (1998) IEEE T. Syst. Man. Cy. C , vol.28 , Issue.3 , pp. 392-403
    • Ishibuchi, H.1    Murata, T.2
  • 20
    • 0030241443 scopus 로고    scopus 로고
    • Genetic algorithms for flowshop scheduling problems
    • T. Murata, H. Ishibuchi and H. Tanaka, Genetic algorithms for flowshopscheduling problems, Comput. Ind. Eng., Vol. 30, No. 4, pp. 1061-1071, 1996.
    • (1996) Comput. Ind. Eng. , vol.30 , Issue.4 , pp. 1061-1071
    • Murata, T.1    Ishibuchi, H.2    Tanaka, H.3
  • 21
    • 0030241820 scopus 로고    scopus 로고
    • Multi-objective genetic algorithm and its applications to flowshopscheduling
    • T. Murata, H. Ishibuchi and H. Tanaka, Multi-objective genetic algorithmand its applications to flowshop scheduling, Comput. Ind. Eng., Vol. 30, No. 4,pp. 957-968, 1996.
    • (1996) Comput. Ind. Eng. , vol.30 , Issue.4 , pp. 957-968
    • Murata, T.1    Ishibuchi, H.2    Tanaka, H.3
  • 22
    • 33749498988 scopus 로고    scopus 로고
    • Scheduling for efficiency and stability in the dynamic job shop
    • R. Rangsaritratsamee, and W. G. Ferrell, Scheduling for efficiency andstability in the dynamic job shop, Int. J. Ind. Eng. Theory Appl. Pract., Vol.12, No. 3, pp. 206-217, 2005.
    • (2005) Int. J. Ind. Eng. Theory Appl. Pract. , vol.12 , Issue.3 , pp. 206-217
    • Rangsaritratsamee, R.1    Ferrell, W.G.2
  • 23
    • 1442285828 scopus 로고    scopus 로고
    • Dynamic rescheduling that simultaneously considers efficiency andstability
    • R. Rangsaritratsamee, W. G. Ferrell Jr. and M. E. Kurz, Dynamicrescheduling that simultaneously considers efficiency and stability, Comput.Ind. Eng., Vol. 46, pp. 1-15, 2004.
    • (2004) Comput. Ind. Eng. , vol.46 , pp. 1-15
    • Rangsaritratsamee, R.1    Ferrell Jr., W.G.2    Kurz, M.E.3
  • 24
    • 48249144997 scopus 로고    scopus 로고
    • Adaptive genetic algorithms for multi-resource constrained projectscheduling problem with multiple modes
    • K. Kim, M. Gen and M. Kim, Adaptive genetic algorithms for multi-resourceconstrained project scheduling problem with multiple modes, InternationalJournal of Innovative Computing, Information and Control, Vol. 2, No. 1, pp.41-49, 2006.
    • (2006) International Journal of Innovative Computing, Information and Control , vol.2 , Issue.1 , pp. 41-49
    • Kim, K.1    Gen, M.2    Kim, M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.