-
1
-
-
0023977010
-
The shifting bottleneck procedure for job shop scheduling
-
J. Adams, E. Balas and D. Zawack, The shifting bottleneck procedure forjob shop scheduling, International Journal of Flexible Manufacturing Systems,vol.34, no.3, pp.391-401, 1987.
-
(1987)
International Journal of Flexible Manufacturing Systems
, vol.34
, Issue.3
, pp. 391-401
-
-
Adams, J.1
Balas, E.2
Zawack, D.3
-
2
-
-
0026126118
-
A computational study of the job-shop scheduling problem
-
D. Applegate and W. Cook. A computational study of the job-shopscheduling problem. ORSA Journal on Computing, vol.3, no.2, pp.149-156, 1991.
-
(1991)
ORSA Journal on Computing
, vol.3
, Issue.2
, pp. 149-156
-
-
Applegate, D.1
Cook, W.2
-
5
-
-
0020013653
-
A state-of-the-art survey of dispatching rules for manufacturing job shopoperations
-
J. Blackstone, D. Phillips and G. Hogg, A state-of-the-art survey ofdispatching rules for manufacturing job shop operations, International Journalof Production Research, vol.20, pp.26-45, 1982.
-
(1982)
International Journal of Production Research
, vol.20
, pp. 26-45
-
-
Blackstone, J.1
Phillips, D.2
Hogg, G.3
-
6
-
-
0030242695
-
A tutorial survey of job-shop scheduling problems using geneticalgorithms: Part I. Representation
-
R. Cheng, M. Gen and Y. Tsujimura, A tutorial survey of job-shopscheduling problems using genetic algorithms: Part I. Representation,International Journal of Computers and Industrial Engineering, vol.30, no.4,pp.983-997, 1996.
-
(1996)
International Journal of Computers and Industrial Engineering
, vol.30
, Issue.4
, pp. 983-997
-
-
Cheng, R.1
Gen, M.2
Tsujimura, Y.3
-
8
-
-
0031268178
-
Jobshop scheduling with imprecise durations: A fuzzy approach
-
P. Fortemps, Jobshop scheduling with imprecise durations: A fuzzyapproach, IEEE Transactions on Fuzzy Systems, vol.5, no.4, pp.557-569, 1997.
-
(1997)
IEEE Transactions on Fuzzy Systems
, vol.5
, Issue.4
, pp. 557-569
-
-
Fortemps, P.1
-
10
-
-
0016952078
-
The complexity of flowshop and jobshop scheduling
-
M. Garey, D. Johnson and R. Sethi, The complexity of flowshop and jobshopscheduling, Mathematics of Operations Research, vol.1, pp.117-129, 1976.
-
(1976)
Mathematics of Operations Research
, vol.1
, pp. 117-129
-
-
Garey, M.1
Johnson, D.2
Sethi, R.3
-
11
-
-
0000996580
-
Two scheduling problems with fuzzy due dates
-
H. Ishii, M. Tada and T. Masuda, Two scheduling problems with fuzzy duedates, Fuzzy Sets and Systems, vol.46, pp.339-347, 1992.
-
(1992)
Fuzzy Sets and Systems
, vol.46
, pp. 339-347
-
-
Ishii, H.1
Tada, M.2
Masuda, T.3
-
12
-
-
0028523480
-
Genetic algorithms and neighborhood search algorithms for fuzzy flowshopscheduling problems
-
H. Ishibuchi, N. Yamamoto, I. Murata and H. Tanaka, Genetic algorithmsand neighborhood search algorithms for fuzzy flowshop scheduling problems, FuzzySets and Systems, vol.67, pp.81-100, 1994.
-
(1994)
Fuzzy Sets and Systems
, vol.67
, pp. 81-100
-
-
Ishibuchi, H.1
Yamamoto, N.2
Murata, I.3
Tanaka, H.4
-
13
-
-
63549144798
-
Time-cost tradeoff problem based on confidence-interval estimates andlevel (1-α) fuzzy numbers
-
F. T. Lin, Time-cost tradeoff problem based on confidence- intervalestimates and level (1-α) fuzzy numbers, International Journal ofInnovative Computing, Information and Control, vol.4, no.10, pp.2551-2564, 2008.
-
(2008)
International Journal of Innovative Computing, Information and Control
, vol.4
, Issue.10
, pp. 2551-2564
-
-
Lin, F.T.1
-
14
-
-
48249132269
-
Fuzzy constraints linear programming: A genetic algorithm approach
-
F. T. Lin and M. G. Lee, Fuzzy constraints linear programming: A geneticalgorithm approach, International Journal of Innovative Computing, Informationand Control, vol.3, no.1, pp.71-83, 2007.
-
(2007)
International Journal of Innovative Computing, Information and Control
, vol.3
, Issue.1
, pp. 71-83
-
-
Lin, F.T.1
Lee, M.G.2
|