메뉴 건너뛰기




Volumn 4, Issue 10, 2008, Pages 2551-2564

Time-cost tradeoff problem based on confidence-interval estimates and level (1 - α) fuzzy numbers

Author keywords

Confidence interval estimates; Fuzzy critical path; Fuzzy time cost tradeoff problem; Project crashing; Project management

Indexed keywords


EID: 63549144798     PISSN: 13494198     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Conference Paper
Times cited : (13)

References (16)
  • 2
    • 13444270579 scopus 로고    scopus 로고
    • Network decomposition-based benchmark results for discrete time-cost tradeoff problem
    • C. Akkan, A. Drexl and Kimms, Network decomposition-based benchmark results for discrete time-cost tradeoff problem, European Journal of Operational Research, vol. 165, pp. 339-358, 2005.
    • (2005) European Journal of Operational Research , vol.165 , pp. 339-358
    • Akkan, C.1    Drexl, A.2    Kimms3
  • 3
    • 0029772743 scopus 로고    scopus 로고
    • Project management with time, cost, and quality considerations
    • A. J. G. Badu and N. Suresh, Project management with time, cost, and quality considerations, European Journal of Operational Research, vol. 88, pp. 320-327, 1996.
    • (1996) European Journal of Operational Research , vol.88 , pp. 320-327
    • Badu, A.J.G.1    Suresh, N.2
  • 4
    • 0035885517 scopus 로고    scopus 로고
    • Critical path analysis in the network with fuzzy activity times
    • S. Chanas and P. Zielinski, Critical path analysis in the network with fuzzy activity times, Fuzzy Sets and Systems, vol. 122, pp. 195-204, 2001.
    • (2001) Fuzzy Sets and Systems , vol.122 , pp. 195-204
    • Chanas, S.1    Zielinski, P.2
  • 7
    • 0031102411 scopus 로고    scopus 로고
    • Complexity of the discrete time-cost tradeoff problem for project networks
    • P. De, E. J. Dunne, J. B. Ghosh, C. E. Wells, Complexity of the discrete time-cost tradeoff problem for project networks, Operational Research, vol. 45, pp. 302-306, 1997.
    • (1997) Operational Research , vol.45 , pp. 302-306
    • De, P.1    Dunne, E.J.2    Ghosh, J.B.3    Wells, C.E.4
  • 8
    • 0020798185 scopus 로고
    • Fuzzy-network planning-FNET
    • I. Gazdik, Fuzzy-network planning-FNET, IEEE Transaction on Reliability, R-32/3, pp. 304-313, 1983.
    • (1983) IEEE Transaction on Reliability , vol.R-32 3 , pp. 304-313
    • Gazdik, I.1
  • 12
    • 11144288749 scopus 로고    scopus 로고
    • Fuzzy activity times in critical path and project crashing problems
    • S. T. Liu, Fuzzy activity times in critical path and project crashing problems, Cybernetics and Systems: An International Journal, vol. 34, pp. 161-172, 2003.
    • (2003) Cybernetics and Systems: An International Journal , vol.34 , pp. 161-172
    • Liu, S.T.1
  • 13
    • 0027592830 scopus 로고
    • Using PERT as an approximation of fuzzy project-network analysis
    • C. S. McCahon, Using PERT as an approximation of fuzzy project-network analysis, IEEE Transactions on Engineering Management, vol. 40, no. 2, pp. 146-153, 1993.
    • (1993) IEEE Transactions on Engineering Management , vol.40 , Issue.2 , pp. 146-153
    • McCahon, C.S.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.