메뉴 건너뛰기




Volumn 16, Issue 4, 2010, Pages 717-723

Disassembly of simple electromechanical products based on fuzzy number Petri nets

Author keywords

Disassembly; Electromechanical product; Fuzzy number; Petri nets; Possibility degree

Indexed keywords

DISASSEMBLY; DISASSEMBLY SEQUENCE; EVALUATION INDEX; FUZZY NUMBERS; POSSIBILITY DEGREE; THREE-PHASE ASYNCHRONOUS MOTOR; TRIANGULAR FUZZY NUMBERS;

EID: 77953797172     PISSN: 10065911     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (3)

References (16)
  • 1
    • 45749148628 scopus 로고    scopus 로고
    • Manufacturing mode selection in knowledgeable manufacturing during product life cycle
    • MA K P, YAN H S. Manufacturing mode selection in knowledgeable manufacturing during product life cycle[J]. International Journal of Advanced Manufacturing Technology, 2008, 37(11/12): 1191-1199.
    • (2008) International Journal of Advanced Manufacturing Technology , vol.37 , Issue.11-12 , pp. 1191-1199
    • Ma, K.P.1    Yan, H.S.2
  • 3
    • 33746954064 scopus 로고    scopus 로고
    • Optimizing disassembly processes subjected to sequence-dependent cost
    • LAMBERT A J D. Optimizing disassembly processes subjected to sequence-dependent cost[J]. Computers & Operations Research, 2007, 24(2): 536-551.
    • (2007) Computers & Operations Research , vol.24 , Issue.2 , pp. 536-551
    • Lambert, A.J.D.1
  • 4
    • 0141819336 scopus 로고    scopus 로고
    • Modeling and analysis system for product disassembly and recycle based on graph theory
    • Chinese source
    • MENG Peng, DUAN Guanghong, WANG Jinsong, et al. Modeling and analysis system for product disassembly and recycle based on graph theory[J]. Chinese Journal of Mechanical Engineering, 2002, 38(S1): 85-89(in Chinese).
    • (2002) Chinese Journal of Mechanical Engineering , vol.38 , Issue.SUPPL.1 , pp. 85-89
    • Meng, P.1    Duan, G.2    Wang, J.3
  • 5
    • 5144225711 scopus 로고    scopus 로고
    • Research on bottleneck of disassembly AND/OR graph in design for recycling
    • Chinese source
    • GAO Jiangang, DUAN Guanghong, WANG Jinsong. Research on bottleneck of disassembly AND/OR graph in design for recycling[J]. Computer Integrated Manufacturing Systems, 2002, 8(7): 575-579(in Chinese).
    • (2002) Computer Integrated Manufacturing Systems , vol.8 , Issue.7 , pp. 575-579
    • Gao, J.1    Duan, G.2    Wang, J.3
  • 6
    • 52949121761 scopus 로고    scopus 로고
    • Robustness analysis of holonic assembly/disassembly processes with Petri nets
    • HSIEH F S. Robustness analysis of holonic assembly/disassembly processes with Petri nets[J]. Automatica, 2008, 44(10): 2538-2548.
    • (2008) Automatica , vol.44 , Issue.10 , pp. 2538-2548
    • Hsieh, F.S.1
  • 7
    • 54949097830 scopus 로고    scopus 로고
    • Unified colored timed Petri net models for the adaptive control of disassembly systems
    • Washington, D. C., USA: IEEE Computer Society Press
    • TANG Ying. Unified colored timed Petri net models for the adaptive control of disassembly systems[C]//Proceedings of the 4th IEEE International Conference on Automation Science and Engineering. Washington, D. C., USA: IEEE Computer Society Press, 2008: 638-643.
    • (2008) Proceedings of the 4th IEEE International Conference on Automation Science and Engineering , pp. 638-643
    • Tang, Y.1
  • 8
    • 55649095371 scopus 로고    scopus 로고
    • Research on Petri net disassembly process model based on constraint relationship of parts for mechanical equipment
    • Chinese source
    • LI Shiting, ZHU Bo, CAI Qi, et al. Research on Petri net disassembly process model based on constraint relationship of parts for mechanical equipment[J]. China Mechanical Engineering, 2008, 19(19): 2302-2305(in Chinese).
    • (2008) China Mechanical Engineering , vol.19 , Issue.19 , pp. 2302-2305
    • Li, S.1    Zhu, B.2    Cai, Q.3
  • 9
    • 0035546631 scopus 로고    scopus 로고
    • Petri net approach to disassembly process planning for products with complex AND/OR precedence relationships
    • MOORE K E, GUNGOR A, GUPTA S M. Petri net approach to disassembly process planning for products with complex AND/OR precedence relationships[J]. European Journal of Operational Research, 2001, 135(2): 428-449.
    • (2001) European Journal of Operational Research , vol.135 , Issue.2 , pp. 428-449
    • Moore, K.E.1    Gungor, A.2    Gupta, S.M.3
  • 10
    • 34247575131 scopus 로고    scopus 로고
    • A fuzzy Petri net model for intelligent databases
    • BOSTON K B, YAZICI A. A fuzzy Petri net model for intelligent databases[J]. Data and Knowledge Engineering, 2007, 62(2): 219-247.
    • (2007) Data and Knowledge Engineering , vol.62 , Issue.2 , pp. 219-247
    • Boston, K.B.1    Yazici, A.2
  • 11
    • 33746869277 scopus 로고    scopus 로고
    • An intelligent modeling system to improve the machining process quality in CNC machine tools using adaptive fuzzy Petri nets
    • KASIROLVALAD Z, MOTLAGH M R J, SHADMANI M A. An intelligent modeling system to improve the machining process quality in CNC machine tools using adaptive fuzzy Petri nets[J]. International Journal of Advanced Manufacturing Technology, 2006, 29(9-10): 1050-1061.
    • (2006) International Journal of Advanced Manufacturing Technology , vol.29 , Issue.9-10 , pp. 1050-1061
    • Kasirolvalad, Z.1    Motlagh, M.R.J.2    Shadmani, M.A.3
  • 13
    • 4844227632 scopus 로고    scopus 로고
    • Intelligent decision making in disassembly process based on fuzzy reasoning Petri nets
    • GAO MeiMei, ZHOU Mengchu, TANG Ying. Intelligent decision making in disassembly process based on fuzzy reasoning Petri nets[J]. IEEE Transactions on Systems, Man, and Cybernetics, 2004, 34(5): 2029-2034.
    • (2004) IEEE Transactions on Systems, Man, and Cybernetics , vol.34 , Issue.5 , pp. 2029-2034
    • Gao, M.1    Zhou, M.2    Tang, Y.3
  • 14
    • 33947114793 scopus 로고    scopus 로고
    • Fuzzy Petri net based disassembly planning considering human factors
    • TANG Ying, ZHOU Mengchu, GAO Meimei. Fuzzy Petri net based disassembly planning considering human factors[J]. IEEE Transactions on Systems, Man, and Cybernetics, 2006, 36(2): 718-725.
    • (2006) IEEE Transactions on Systems, Man, and Cybernetics , vol.36 , Issue.2 , pp. 718-725
    • Tang, Y.1    Zhou, M.2    Gao, M.3
  • 15
    • 2342499339 scopus 로고    scopus 로고
    • Algorithm for priority of fuzzy complementary judgement matrix
    • Chinese source
    • XU Zeshui. Algorithm for priority of fuzzy complementary judgement matrix[J]. Journal of System Engineering, 2001, 16(4): 311-314(in Chinese).
    • (2001) Journal of System Engineering , vol.16 , Issue.4 , pp. 311-314
    • Xu, Z.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.