-
1
-
-
77953534461
-
-
Bohrer P (2005) Crane scheduling in container terminals. Diploma thesis, Department of Mathematics, University of Kaiserslautern.
-
-
-
-
2
-
-
38349053974
-
-
Choe R, Park T, Min Ok S, Ryel Ryu K (2007) Real-time scheduling for non-crossing stacking cranes in an automated container terminal. In: AI 2007: advances in artificial intelligence, lecture notes in computer science. Springer, Berlin/Heidelberg, pp 625-631.
-
-
-
-
3
-
-
0024686408
-
The crane scheduling problem
-
Daganzo CF (1989) The crane scheduling problem. Transp Res 23B(3): 159-175.
-
(1989)
Transp Res
, vol.23 B
, Issue.3
, pp. 159-175
-
-
Daganzo, C.F.1
-
4
-
-
36148954265
-
Optimizing the landside operation of a container terminal
-
Froyland G, Koch T, Megow N, Duane E, Wren H (2008) Optimizing the landside operation of a container terminal. OR Spectr 30(1): 53-75.
-
(2008)
OR Spectr
, vol.30
, Issue.1
, pp. 53-75
-
-
Froyland, G.1
Koch, T.2
Megow, N.3
Duane, E.4
Wren, H.5
-
5
-
-
0002767793
-
An optimal routing algorithm for a transfer crane in port container terminals
-
Kim KH, Kim KY (1999) An optimal routing algorithm for a transfer crane in port container terminals. Transp Sci 33(1): 17-33.
-
(1999)
Transp Sci
, vol.33
, Issue.1
, pp. 17-33
-
-
Kim, K.H.1
Kim, K.Y.2
-
6
-
-
77953541557
-
-
Koch T (2004) Rapid mathematical programming. PhD thesis, TU Berlin. Available as ZIB-Report 04-58.
-
-
-
-
7
-
-
0036475313
-
Analysis and algorithms for the transtainer routing problem in container port operations
-
Narasimhan A, Palekar US (2002) Analysis and algorithms for the transtainer routing problem in container port operations. Transp Sci 36(1): 63-78.
-
(2002)
Transp Sci
, vol.36
, Issue.1
, pp. 63-78
-
-
Narasimhan, A.1
Palekar, U.S.2
-
8
-
-
10444233579
-
Crane scheduling in container yards with inter-crane interference
-
Ng WC (2005) Crane scheduling in container yards with inter-crane interference. Eur J Oper Res 164(1): 64-78.
-
(2005)
Eur J Oper Res
, vol.164
, Issue.1
, pp. 64-78
-
-
Ng, W.C.1
-
9
-
-
11444266631
-
Yard crane scheduling in port container terminals
-
Ng WC, Mak KL (2005) Yard crane scheduling in port container terminals. Appl Math Model 29(3): 263-276.
-
(2005)
Appl Math Model
, vol.29
, Issue.3
, pp. 263-276
-
-
Ng, W.C.1
Mak, K.L.2
-
10
-
-
77953538029
-
-
Saanen Y (2004) An approach for designing robotized marine container terminals. PhD thesis, Delft University of Technology.
-
-
-
-
11
-
-
33846677160
-
-
Saanen Y, van Valkengoed M (2006) Comparison of three automated stacking alternatives by means of simulation. In: Proceedings of the winter simulation conference 2005, pp 1567-1576.
-
-
-
-
12
-
-
34547350136
-
-
Saanen Y, Rijsenbrij J (2007) Which system fits your hub? In: Cargo Systems, June 2007, pp 47-51.
-
-
-
-
13
-
-
36248971841
-
Operations research at container terminals: A literature update
-
Stahlbock R, Voß S (2008) Operations research at container terminals: a literature update. OR Spectr 30(1): 1-52.
-
(2008)
OR Spectr
, vol.30
, Issue.1
, pp. 1-52
-
-
Stahlbock, R.1
Voß, S.2
-
14
-
-
77953538279
-
-
Stahlbock R, Voß S, Eisenberg R (2008) Increasing the efficiency of container terminals by automated double rail mounted gantry cranes. In: Presented at the 3rd German-Korean workshop on container terminal management: IT-based planning and control of seaport container terminals and transportation systems, August 27-31, Bremen, Germany.
-
-
-
-
15
-
-
77953545340
-
-
van Valkengoed M (2004) How passing cranes influence stack operations in a container terminal: a simulation study. TBA Nederland, Delft, and Master's thesis, University of Amsterdam.
-
-
-
-
16
-
-
77953542795
-
-
Zyngiridis I (2005) Optimizing container movements using one and two automated stacking cranes. Master's thesis, Naval Postgraduate School, Monterey.
-
-
-
|