메뉴 건너뛰기




Volumn 4830 LNAI, Issue , 2007, Pages 625-631

Real-time scheduling for non-crossing stacking cranes in an automated container terminal

Author keywords

Automated container terminal; Optimization; Real time scheduling; Stacking crane

Indexed keywords

AUTOMATION; CONSTRAINT THEORY; CONTAINERS; FERRY TERMINALS; HEURISTIC METHODS; REAL TIME SYSTEMS;

EID: 38349053974     PISSN: 03029743     EISSN: 16113349     Source Type: Book Series    
DOI: 10.1007/978-3-540-76928-6_65     Document Type: Conference Paper
Times cited : (18)

References (6)
  • 3
    • 84885901838 scopus 로고    scopus 로고
    • Genetic Algorithms to Schedule Container Transfers at Multimodal Terminals
    • Kozan, E., Preston, P.: Genetic Algorithms to Schedule Container Transfers at Multimodal Terminals. International Transactions in Operational Research 6, 311-329 (1999)
    • (1999) International Transactions in Operational Research , vol.6 , pp. 311-329
    • Kozan, E.1    Preston, P.2
  • 4
    • 10444233579 scopus 로고    scopus 로고
    • Crane scheduling in container yards with inter-crane interference
    • Ng, W.C.: Crane scheduling in container yards with inter-crane interference. J. Operational Research 164, 64-78 (2005)
    • (2005) J. Operational Research , vol.164 , pp. 64-78
    • Ng, W.C.1
  • 5
    • 31444432278 scopus 로고    scopus 로고
    • An effective heuristic for scheduling a yard crane to handle jobs with different ready times
    • Ng, W.C., Mak, K.L.: An effective heuristic for scheduling a yard crane to handle jobs with different ready times. J. Engineering Optimization 37, 867-877 (2005)
    • (2005) J. Engineering Optimization , vol.37 , pp. 867-877
    • Ng, W.C.1    Mak, K.L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.