메뉴 건너뛰기




Volumn 22, Issue 3, 2007, Pages 1129-1138

Supplier asset allocation in a pool-based electricity market

Author keywords

Assets allocation; Electricity market; Portfolio selection; Risk management

Indexed keywords

ASSET MANAGEMENT; DECISION MAKING; MATHEMATICAL MODELS; RESOURCE ALLOCATION; RISK MANAGEMENT;

EID: 34548017678     PISSN: 08858950     EISSN: None     Source Type: Journal    
DOI: 10.1109/TPWRS.2007.901282     Document Type: Article
Times cited : (43)

References (52)
  • 2
    • 0028547148 scopus 로고
    • Optional forward contracts for electric markets
    • Nov
    • T. W. Gedra, "Optional forward contracts for electric markets," IEEE Trans. Power Syst., vol. 9, no. 4, pp. 1766-1773, Nov. 1994.
    • (1994) IEEE Trans. Power Syst , vol.9 , Issue.4 , pp. 1766-1773
    • Gedra, T.W.1
  • 3
    • 0142135084 scopus 로고    scopus 로고
    • Electricity market risk management using forward contracts with bilateral options
    • Sep
    • T. S. Chung, S. H. Zhang, C. W. Yu, and K. P. Wong, "Electricity market risk management using forward contracts with bilateral options," Proc. Inst. Elect. Eng., Gen., Transm., Distrib., vol. 150, no. 5, pp. 588-594, Sep. 2003.
    • (2003) Proc. Inst. Elect. Eng., Gen., Transm., Distrib , vol.150 , Issue.5 , pp. 588-594
    • Chung, T.S.1    Zhang, S.H.2    Yu, C.W.3    Wong, K.P.4
  • 4
    • 0035151549 scopus 로고    scopus 로고
    • Integrating real and financial options in demand-side electricity contracts
    • S. Oren, "Integrating real and financial options in demand-side electricity contracts," Decision Support Syst., vol. 30, no. 3, pp. 279-288, 2001.
    • (2001) Decision Support Syst , vol.30 , Issue.3 , pp. 279-288
    • Oren, S.1
  • 5
    • 28244432515 scopus 로고    scopus 로고
    • Supply function equilibrium bidding strategies with fixed forward contracts
    • Nov
    • H. Niu, R. Baldick, and G. Zhu, "Supply function equilibrium bidding strategies with fixed forward contracts," IEEE Trans. Power Syst. vol. 20, no. 4, pp. 1859-1867, Nov. 2005.
    • (2005) IEEE Trans. Power Syst , vol.20 , Issue.4 , pp. 1859-1867
    • Niu, H.1    Baldick, R.2    Zhu, G.3
  • 6
    • 84861513359 scopus 로고    scopus 로고
    • Forward contracts for electricity and their correlation with spot markets
    • Bologna, Italy, Jun. 23-26
    • S. Palamarchuk, "Forward contracts for electricity and their correlation with spot markets," in Proc. IEEE Bologna PowerTech Conf., Bologna, Italy, Jun. 23-26, 2003.
    • (2003) Proc. IEEE Bologna PowerTech Conf
    • Palamarchuk, S.1
  • 7
    • 0037448776 scopus 로고    scopus 로고
    • Managing electricity market price risk
    • Feb
    • I. Vehvilainen and J. Keppo, "Managing electricity market price risk," Eur. J. Oper. Res., vol. 145, no. 1, pp. 136-147, Feb. 2003.
    • (2003) Eur. J. Oper. Res , vol.145 , Issue.1 , pp. 136-147
    • Vehvilainen, I.1    Keppo, J.2
  • 8
    • 0038180767 scopus 로고    scopus 로고
    • Risk assessment in energy trading
    • May
    • R. Dahlgren, C. C. Liu, and J. Lawarree, "Risk assessment in energy trading," IEEE Trans. Power Syst., vol. 18, no. 2, pp. 503-511, May 2003.
    • (2003) IEEE Trans. Power Syst , vol.18 , Issue.2 , pp. 503-511
    • Dahlgren, R.1    Liu, C.C.2    Lawarree, J.3
  • 10
    • 0033221395 scopus 로고    scopus 로고
    • Financial risk management in a competitive electricity market
    • Nov
    • R. Bjorgan, C. C. Liu, and J. Lawarree, "Financial risk management in a competitive electricity market," IEEE Trans. Power Syst., vol. 14, no. 4, pp. 1285-1291, Nov. 1999.
    • (1999) IEEE Trans. Power Syst , vol.14 , Issue.4 , pp. 1285-1291
    • Bjorgan, R.1    Liu, C.C.2    Lawarree, J.3
  • 11
    • 0025387454 scopus 로고
    • Forward contracts for the operation of an electricity industry under spot pricing
    • Feb
    • R. J. Kaye, H. R. Outhred, and C. H. Bannister, "Forward contracts for the operation of an electricity industry under spot pricing," IEEE Trans. Power Syst., vol. 5, no. 1, pp. 46-52, Feb. 1990.
    • (1990) IEEE Trans. Power Syst , vol.5 , Issue.1 , pp. 46-52
    • Kaye, R.J.1    Outhred, H.R.2    Bannister, C.H.3
  • 12
    • 0345258417 scopus 로고    scopus 로고
    • Modeling and pricing of block flexible electricity contracts
    • Nov
    • X. Zhang, X. Wang, and Y. H. Song, "Modeling and pricing of block flexible electricity contracts," IEEE Trans. Power Syst., vol. 18, no. 4, pp. 1382-1388, Nov. 2003.
    • (2003) IEEE Trans. Power Syst , vol.18 , Issue.4 , pp. 1382-1388
    • Zhang, X.1    Wang, X.2    Song, Y.H.3
  • 13
    • 0034186779 scopus 로고    scopus 로고
    • Pricing flexible electricity contracts
    • May
    • R. Bjorgan, H. Song, C. C. Liu, and R. Dahlgren, "Pricing flexible electricity contracts," IEEE Trans. Power Syst., vol. 15, no. 2, pp. 477-482, May 2000.
    • (2000) IEEE Trans. Power Syst , vol.15 , Issue.2 , pp. 477-482
    • Bjorgan, R.1    Song, H.2    Liu, C.C.3    Dahlgren, R.4
  • 14
    • 0142135084 scopus 로고    scopus 로고
    • Electricity market risk management using forward contracts with bilateral options
    • Sep
    • T. S. Chung, S. H. Zhang, C. W. Yu, and K. P. Wong, "Electricity market risk management using forward contracts with bilateral options," Proc. Inst. Elect. Eng., Gen., Transm., Distrib., vol. 150, no. 5, pp. 588-594, Sep. 2003.
    • (2003) Proc. Inst. Elect. Eng., Gen., Transm., Distrib , vol.150 , Issue.5 , pp. 588-594
    • Chung, T.S.1    Zhang, S.H.2    Yu, C.W.3    Wong, K.P.4
  • 15
    • 0028547148 scopus 로고
    • Optional forward contracts for electric power markets
    • Nov
    • T. W. Gedra, "Optional forward contracts for electric power markets," IEEE Trans. Power Syst., vol. 9, no. 4, pp. 1766-1773, Nov. 1994.
    • (1994) IEEE Trans. Power Syst , vol.9 , Issue.4 , pp. 1766-1773
    • Gedra, T.W.1
  • 16
    • 0029253069 scopus 로고
    • Evaluating risk management strategies in resource planning
    • Feb
    • C. J. Andrews, "Evaluating risk management strategies in resource planning," IEEE Trans. Power Syst., vol. 10, no. 1, pp. 420-426, Feb. 1995.
    • (1995) IEEE Trans. Power Syst , vol.10 , Issue.1 , pp. 420-426
    • Andrews, C.J.1
  • 17
    • 4644326618 scopus 로고    scopus 로고
    • A comprehensive framework for evaluating nonutility generation projects
    • Singapore, Feb
    • H. Dai, F. F. Wu, and Y. Ni, "A comprehensive framework for evaluating nonutility generation projects," in Proc. IEEE Power Eng. Soc. Winter Meeting, Singapore, Feb. 2000, vol. 2, pp. 1040-1045.
    • (2000) Proc. IEEE Power Eng. Soc. Winter Meeting , vol.2 , pp. 1040-1045
    • Dai, H.1    Wu, F.F.2    Ni, Y.3
  • 18
    • 4043101021 scopus 로고    scopus 로고
    • Risk-constrained self-scheduling of a thermal power producer
    • Aug
    • A. J. Conejo, F. J. Nogales, J. M. Arroyo, and R. Garcia-Bertrand, "Risk-constrained self-scheduling of a thermal power producer," IEEE Trans. Power Syst., vol. 19, no. 3, pp. 1569-1574, Aug. 2004.
    • (2004) IEEE Trans. Power Syst , vol.19 , Issue.3 , pp. 1569-1574
    • Conejo, A.J.1    Nogales, F.J.2    Arroyo, J.M.3    Garcia-Bertrand, R.4
  • 20
    • 12344274516 scopus 로고    scopus 로고
    • Towards the development of risk-constrained optimal bidding strategies for generation companies in electricity markets
    • X. Ma, F. Wen, Y. Ni, and J. Liu, "Towards the development of risk-constrained optimal bidding strategies for generation companies in electricity markets," Elect. Power Syst. Res., vol. 73, pp. 305-312, 2005.
    • (2005) Elect. Power Syst. Res , vol.73 , pp. 305-312
    • Ma, X.1    Wen, F.2    Ni, Y.3    Liu, J.4
  • 21
    • 0036577147 scopus 로고    scopus 로고
    • Probabilistic optimality in long-term energy sales
    • May
    • R. A. Campo, "Probabilistic optimality in long-term energy sales," IEEE Trans. Power Syst., vol. 17, no. 2, pp. 237-242, May 2002.
    • (2002) IEEE Trans. Power Syst , vol.17 , Issue.2 , pp. 237-242
    • Campo, R.A.1
  • 22
    • 0036699426 scopus 로고    scopus 로고
    • Trading wind generation in short term energy markets
    • Aug
    • G. N. Bathurst, J. Weatherill, and G. Strbac, "Trading wind generation in short term energy markets," IEEE Trans. Power Syst., vol. 17, no. 3, pp. 782-789, Aug. 2002.
    • (2002) IEEE Trans. Power Syst , vol.17 , Issue.3 , pp. 782-789
    • Bathurst, G.N.1    Weatherill, J.2    Strbac, G.3
  • 23
    • 1542269724 scopus 로고    scopus 로고
    • Market allocation between bilateral contracts and spot market without financial transmission rights
    • M. Liu, F. F.Wu, and Y. Ni, "Market allocation between bilateral contracts and spot market without financial transmission rights," in Proc. IEEE Power Eng. Soc. Summer Meeting, 2003, vol. 2, pp. 13-17.
    • (2003) Proc. IEEE Power Eng. Soc. Summer Meeting , vol.2 , pp. 13-17
    • Liu, M.1    Wu, F.F.2    Ni, Y.3
  • 24
    • 0035339588 scopus 로고    scopus 로고
    • Integrated risk management of hydro power schedule and contract management
    • May
    • B. Mo, A. Gjelsvik, and A. Grundt, "Integrated risk management of hydro power schedule and contract management," IEEE Trans. Power Syst., vol. 16, no. 2, pp. 216-221, May 2001.
    • (2001) IEEE Trans. Power Syst , vol.16 , Issue.2 , pp. 216-221
    • Mo, B.1    Gjelsvik, A.2    Grundt, A.3
  • 25
    • 0036872154 scopus 로고    scopus 로고
    • Economic performance of contracts in electricity markets: A fuzzy and multiple criteria approach
    • Nov
    • A. Schmutz, E. Gnansounou, and G. Sarlos, "Economic performance of contracts in electricity markets: A fuzzy and multiple criteria approach," IEEE Trans. Power Syst., vol. 17, no. 4, pp. 966-973, Nov. 2002.
    • (2002) IEEE Trans. Power Syst , vol.17 , Issue.4 , pp. 966-973
    • Schmutz, A.1    Gnansounou, E.2    Sarlos, G.3
  • 29
    • 0002557876 scopus 로고    scopus 로고
    • Economic analysis of the electricity. Market in England and Wales
    • Apr
    • D. T. Y. Cheng, "Economic analysis of the electricity. Market in England and Wales," IEEE Power Eng. Rev., vol. 19, no. 4, pp. 57-59, Apr. 1999.
    • (1999) IEEE Power Eng. Rev , vol.19 , Issue.4 , pp. 57-59
    • Cheng, D.T.Y.1
  • 30
    • 0038180775 scopus 로고    scopus 로고
    • Is NETA the blueprint for wholesale electricity trading arrangements of the future?
    • May
    • S. Hesmondhalg, "Is NETA the blueprint for wholesale electricity trading arrangements of the future?," IEEE Trans. Power Syst., vol. 18, no. 2, pp. 548-554, May 2003.
    • (2003) IEEE Trans. Power Syst , vol.18 , Issue.2 , pp. 548-554
    • Hesmondhalg, S.1
  • 31
    • 34548016030 scopus 로고    scopus 로고
    • W. Mielczarski, The Electricity Market in Poland-Recent Advances. Power Economics, Feb. 2002. [Online]. Available: http://www.findarticles.com/p/ articles/mi_qa3888/is_200202/ai_n9031235.
    • W. Mielczarski, The Electricity Market in Poland-Recent Advances. Power Economics, Feb. 2002. [Online]. Available: http://www.findarticles.com/p/ articles/mi_qa3888/is_200202/ai_n9031235.
  • 32
    • 27144445873 scopus 로고    scopus 로고
    • East China power market development and trial operation
    • San Francisco, CA, Jun, panel session summary
    • F. Zhu, L. Yang, B. Fan, X.Wei, and D. Gan, "East China power market development and trial operation," in Proc. IEEE Power Eng. Soc. General Meeting, San Francisco, CA, Jun. 2005, panel session summary.
    • (2005) Proc. IEEE Power Eng. Soc. General Meeting
    • Zhu, F.1    Yang, L.2    Fan, B.3    Wei, X.4    Gan, D.5
  • 33
    • 0036698934 scopus 로고    scopus 로고
    • Hedging with futures contracts in a deregulated electricity industry
    • August
    • E. Tanlapco, J. Lawarree, and C. C. Liu, "Hedging with futures contracts in a deregulated electricity industry," IEEE Trans. Power Syst., vol. 17, no. 3, pp. 577-582, August 2002.
    • (2002) IEEE Trans. Power Syst , vol.17 , Issue.3 , pp. 577-582
    • Tanlapco, E.1    Lawarree, J.2    Liu, C.C.3
  • 35
    • 36349006231 scopus 로고    scopus 로고
    • Potomac Economics, Ltd
    • New York ISO, May 2004. Online. Available
    • Potomac Economics, Ltd., 2003 State of the Market Report - New York ISO, May 2004. Online. Available: http://www.nyiso.com.
    • (2003) State of the Market Report
  • 36
    • 34548045481 scopus 로고    scopus 로고
    • ISO New England, Inc., 2003 Annual Markets Report, 2004. [Online]. Available: http://www.iso-ne.com.
    • ISO New England, Inc., 2003 Annual Markets Report, 2004. [Online]. Available: http://www.iso-ne.com.
  • 39
    • 27744530791 scopus 로고    scopus 로고
    • Power system planning and operation in international markets - Perspectives from the Nordic region and Europe
    • Nov
    • I. Wangensteen, A. Botterud, and N. Flatabø, "Power system planning and operation in international markets - Perspectives from the Nordic region and Europe," Proc. IEEE, vol. 93, no. 11, pp. 2049-2059, Nov. 2005.
    • (2005) Proc. IEEE , vol.93 , Issue.11 , pp. 2049-2059
    • Wangensteen, I.1    Botterud, A.2    Flatabø, N.3
  • 40
    • 32344446655 scopus 로고    scopus 로고
    • An improved measure of risk aversion
    • S. D. Hanna and S. Lindamood, "An improved measure of risk aversion," Fin. Counsel. Plan., vol. 15, no. 2, pp. 27-38, 2004.
    • (2004) Fin. Counsel. Plan , vol.15 , Issue.2 , pp. 27-38
    • Hanna, S.D.1    Lindamood, S.2
  • 41
    • 0032592961 scopus 로고    scopus 로고
    • The IEEE reliability test system-1996
    • Reliability Test System Task Force of the Application of Probability Methods Subcommitee, Aug
    • Reliability Test System Task Force of the Application of Probability Methods Subcommitee, "The IEEE reliability test system-1996," IEEE Trans. Power Syst., vol. 14, no. 3, pp. 1010-1020, Aug. 1999.
    • (1999) IEEE Trans. Power Syst , vol.14 , Issue.3 , pp. 1010-1020
  • 42
    • 0036474273 scopus 로고    scopus 로고
    • The economics of electricity hedging and a proposed modification for the futures contract for electricity
    • Feb
    • R. A. Collins, "The economics of electricity hedging and a proposed modification for the futures contract for electricity," IEEE Trans. Power Syst., vol. 17, no. 1, pp. 100-107, Feb. 2002.
    • (2002) IEEE Trans. Power Syst , vol.17 , Issue.1 , pp. 100-107
    • Collins, R.A.1
  • 43
    • 4344599675 scopus 로고    scopus 로고
    • A life-cycle view of electricity futures contracts
    • R. Brooks and A. A. El-Keib, "A life-cycle view of electricity futures contracts," J. Energy Fin. Develop., vol. 3, no. 2, pp. 171-183, 1998.
    • (1998) J. Energy Fin. Develop , vol.3 , Issue.2 , pp. 171-183
    • Brooks, R.1    El-Keib, A.A.2
  • 44
    • 12444269085 scopus 로고    scopus 로고
    • California electricity futures: The NYMEX experience
    • Jan
    • J. S. Moulton, "California electricity futures: The NYMEX experience," Energy Econ., vol. 27, no. 1, pp. 181-194, Jan. 2005.
    • (2005) Energy Econ , vol.27 , Issue.1 , pp. 181-194
    • Moulton, J.S.1
  • 45
    • 0000235095 scopus 로고
    • Valuing risky projects: Options pricing theory and decision analysis
    • J. Smith and B. Nau, "Valuing risky projects: Options pricing theory and decision analysis," Manage. Sci., vol. 41, no. 4, pp. 795-816, 1995.
    • (1995) Manage. Sci , vol.41 , Issue.4 , pp. 795-816
    • Smith, J.1    Nau, B.2
  • 46
    • 0002547367 scopus 로고
    • A general quadratic programming algorithm
    • R. Fletcher, "A general quadratic programming algorithm," J. Inst. Math. Appl., vol. 7, pp. 76-91, 1971.
    • (1971) J. Inst. Math. Appl , vol.7 , pp. 76-91
    • Fletcher, R.1
  • 47
    • 0347603701 scopus 로고    scopus 로고
    • Cincinnati, OH: South-Western College Publishing
    • H. Levy, Introduction to Investment. Cincinnati, OH: South-Western College Publishing, 1996.
    • (1996) Introduction to Investment
    • Levy, H.1
  • 49
    • 6344228054 scopus 로고    scopus 로고
    • Robust asset allocation
    • R. H. Tütüncü and M. Koenig, "Robust asset allocation," Ann. Oper. Res., vol. 132, pp. 157-187, 2004.
    • (2004) Ann. Oper. Res , vol.132 , pp. 157-187
    • Tütüncü, R.H.1    Koenig, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.