메뉴 건너뛰기




Volumn 14, Issue 2, 2010, Pages 46-53

Development of index for measuring leanness: Study of an Indian auto component industry

Author keywords

Fuzzy control; Lean production; Manufacturing systems; Quality management

Indexed keywords


EID: 77952931605     PISSN: 13683047     EISSN: None     Source Type: Journal    
DOI: 10.1108/13683041011047858     Document Type: Article
Times cited : (121)

References (26)
  • 1
    • 57349130262 scopus 로고    scopus 로고
    • Shifting to lean service: Stealing a page from manufacturers' playbooks
    • Allway, M. and Corbett, S. (2002), "Shifting to lean service: stealing a page from manufacturers' playbooks" in Journal of Organizational Excellence, Vol. 21, No. 2, pp. 45-54.
    • (2002) Journal of Organizational Excellence , vol.21 , Issue.2 , pp. 45-54
    • Allway, M.1    Corbett, S.2
  • 2
    • 23844470234 scopus 로고    scopus 로고
    • A case study of supplier selection for lean supply by using a mathematical model
    • Barla, S.B. (2003), "A case study of supplier selection for lean supply by using a mathematical model" in Logistics Information Management, Vol. 16, No. 6, pp. 451-9.
    • (2003) Logistics Information Management , vol.16 , Issue.6 , pp. 451-459
    • Barla, S.B.1
  • 3
    • 68749121404 scopus 로고    scopus 로고
    • Measuring the leanness of manufacturing systems - a case study of Ford Motor Company and General Motors
    • Bayou, M. and de Korvin, A. (2008), "Measuring the leanness of manufacturing systems - a case study of Ford Motor Company and General Motors" in Journal of Engineering. Technology and Management, Vol. 25, No. 4, pp. 287-304.
    • (2008) Journal of Engineering. Technology and Management , vol.25 , Issue.4 , pp. 287-304
    • Bayou, M.1    de Korvin, A.2
  • 4
    • 8844266090 scopus 로고    scopus 로고
    • Measuring the efficiency of Brazilian post office stores using data envelopment analysis
    • Borenstein, D., Becker, J.L. and Prado, V.J. (2004), "Measuring the efficiency of Brazilian post office stores using data envelopment analysis" in Journal of Operations & Production Management, Vol. 24, No. 10, pp. 1055-78.
    • (2004) Journal of Operations & Production Management , vol.24 , Issue.10 , pp. 1055-1078
    • Borenstein, D.1    Becker, J.L.2    Prado, V.J.3
  • 5
    • 0025640766 scopus 로고
    • Measurement of adoptability and flexibility in production system
    • Brill, P.H. and Mandelbaum, M. (1990), "Measurement of adoptability and flexibility in production system" in European Journal of Operational Research, Vol. 49, No. 3, pp. 325-32.
    • (1990) European Journal of Operational Research , vol.49 , Issue.3 , pp. 325-332
    • Brill, P.H.1    Mandelbaum, M.2
  • 6
    • 3242712963 scopus 로고    scopus 로고
    • An innovative performance measurement method for supply chain management
    • Chan, F.T.S. and Qi, H.J. (2003), "An innovative performance measurement method for supply chain management" in Supply Chain Management: An International Journal, Vol. 8, No. 3, pp. 209-33.
    • (2003) Supply Chain Management: An International Journal , vol.8 , Issue.3 , pp. 209-233
    • Chan, F.T.S.1    Qi, H.J.2
  • 7
    • 84986105960 scopus 로고    scopus 로고
    • A conceptual model of performance measurement for supply chains
    • Chan, F.T.S., Qi, H.J., Chan, H.K., Lau, H.C.W. and Lp, R.W.L. (2003), "A conceptual model of performance measurement for supply chains" in Management Decision, Vol. 41, No. 7, pp. 635-42.
    • (2003) Management Decision , vol.41 , Issue.7 , pp. 635-642
    • Chan, F.T.S.1    Qi, H.J.2    Chan, H.K.3    Lau, H.C.W.4    Lp, R.W.L.5
  • 8
    • 84993104383 scopus 로고    scopus 로고
    • A technical evaluation index for curtain wall and cladding facades
    • Chew, M.Y.L., Tan, S.S. and Kang, K.H. (2004), "A technical evaluation index for curtain wall and cladding facades" in Structural Survey, Vol. 22, No. 4, pp. 210-27.
    • (2004) Structural Survey , vol.22 , Issue.4 , pp. 210-227
    • Chew, M.Y.L.1    Tan, S.S.2    Kang, K.H.3
  • 10
    • 40249108473 scopus 로고    scopus 로고
    • Performance measurement in strategic buyer-supplier relationships. The mediating role of socialization mechanisms
    • Cousins, P.D., Lawson, B. and Squire, B. (2008), "Performance measurement in strategic buyer-supplier relationships. The mediating role of socialization mechanisms" in International Journal of Operations & Production Management, Vol. 28, No. 3, pp. 238-58.
    • (2008) International Journal of Operations & Production Management , vol.28 , Issue.3 , pp. 238-258
    • Cousins, P.D.1    Lawson, B.2    Squire, B.3
  • 11
    • 3242722567 scopus 로고    scopus 로고
    • Supporting small businesses in their transition to lean production
    • Emiliani, M.L. (2000), "Supporting small businesses in their transition to lean production" in Supply Chain Management: An International Journal, Vol. 5, No. 2, pp. 66-705.
    • (2000) Supply Chain Management: An International Journal , vol.5 , Issue.2 , pp. 66-705
    • Emiliani, M.L.1
  • 13
    • 0035209911 scopus 로고    scopus 로고
    • A state-time model to measure the reconfigurability of manufacturing area - key to performance
    • Kuhnle, H. (2001), "A state-time model to measure the reconfigurability of manufacturing area - key to performance" in Integrated Manufacturing Systems, Vol. 12, No. 7, pp. 493-9.
    • (2001) Integrated Manufacturing Systems , vol.12 , Issue.7 , pp. 493-499
    • Kuhnle, H.1
  • 15
    • 0042363456 scopus 로고    scopus 로고
    • A business process change framwork for examining lean manufacturing: A case study
    • Motwani, J. (2003), "A business process change framwork for examining lean manufacturing: a case study" in Industrial Management and data systems, Vol. 103, No. 5, pp. 346-99.
    • (2003) Industrial Management and Data Systems , vol.103 , Issue.5 , pp. 346-399
    • Motwani, J.1
  • 18
    • 59749084618 scopus 로고    scopus 로고
    • The impacts of lean production on working conditions: A case study of a harvester assembly line in Brazil
    • Saurin, T.A. and Ferreira, C.F. (2009), "The impacts of lean production on working conditions: a case study of a harvester assembly line in Brazil" in International Journal of Industrial Ergonomics, Vol. 39, No. 2, pp. 403-12.
    • (2009) International Journal of Industrial Ergonomics , vol.39 , Issue.2 , pp. 403-412
    • Saurin, T.A.1    Ferreira, C.F.2
  • 19
    • 0037357671 scopus 로고    scopus 로고
    • Lean manufacturing: Context, practice bundles, and performance
    • Shah, R. and Ward, P.T. (2003), "Lean manufacturing: context, practice bundles, and performance" in Journal of Operations Management, Vol. 21, No. 2, pp. 129-49.
    • (2003) Journal of Operations Management , vol.21 , Issue.2 , pp. 129-149
    • Shah, R.1    Ward, P.T.2
  • 20
    • 34548163843 scopus 로고    scopus 로고
    • An integrated BSC-AHP approach for supply chain management evaluation
    • Sharma, M.K. and Bhagwat, R. (2007), "An integrated BSC-AHP approach for supply chain management evaluation" in Measuring Business Excellence, Vol. 11, No. 3, pp. 57-68.
    • (2007) Measuring Business Excellence , vol.11 , Issue.3 , pp. 57-68
    • Sharma, M.K.1    Bhagwat, R.2
  • 21
    • 18844411311 scopus 로고    scopus 로고
    • Use the supply relationship to develop lean and green suppliers
    • Simpson, D.F. and Power, D.J. (2005), "Use the supply relationship to develop lean and green suppliers" in Supply Chain Management: An International Journal, Vol. 10, No. 1, pp. 60-8.
    • (2005) Supply Chain Management: An International Journal , vol.10 , Issue.1 , pp. 60-68
    • Simpson, D.F.1    Power, D.J.2
  • 22
    • 34547325245 scopus 로고    scopus 로고
    • The effect of TPS on US manufacturing during 1981-1998: Inventory increased or decreased as a function of plant performance
    • Swamidass, P.M. (2007), "The effect of TPS on US manufacturing during 1981-1998: inventory increased or decreased as a function of plant performance" in International Journal of Production Research, Vol. 45, No. 16, pp. 3763-78.
    • (2007) International Journal of Production Research , vol.45 , Issue.16 , pp. 3763-3778
    • Swamidass, P.M.1
  • 23
    • 0036190151 scopus 로고    scopus 로고
    • A model for evaluating the degree of leanness of manufacturing firms
    • Soriano-Meier, H. and Forrester, P.L. (2002), "A model for evaluating the degree of leanness of manufacturing firms" in Integrated Manufacturing Systems, Vol. 13, No. 2, pp. 104-9.
    • (2002) Integrated Manufacturing Systems , vol.13 , Issue.2 , pp. 104-109
    • Soriano-Meier, H.1    Forrester, P.L.2
  • 24
    • 33645652483 scopus 로고    scopus 로고
    • Application of constrained management and lean manufacturing in developing best practices for productivity improvement in an auto-assembly plant
    • Taj, S. and Berro, L. (2006), "Application of constrained management and lean manufacturing in developing best practices for productivity improvement in an auto-assembly plant" in International Journal of Productivity and Performance Management, Vol. 55, Nos 3/4, pp. 332-45.
    • (2006) International Journal of Productivity and Performance Management , vol.55 , Issue.3-4 , pp. 332-345
    • Taj, S.1    Berro, L.2
  • 25
    • 54349104675 scopus 로고    scopus 로고
    • A leanness measure of manufacturing systems for quantifying impacts of lean initiatives
    • Wan, H.-D. and Frank, C.F. (2008), "A leanness measure of manufacturing systems for quantifying impacts of lean initiatives" in International Journal of Production Research, Vol. 46, No. 23, pp. 6567-84.
    • (2008) International Journal of Production Research , vol.46 , Issue.23 , pp. 6567-6584
    • Wan, H.-D.1    Frank, C.F.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.