메뉴 건너뛰기




Volumn 48, Issue 14, 2010, Pages 4101-4121

Joint hybrid repair and remanufacturing systems and supply control

Author keywords

Hedging point policy; Remanufacturing; Simulation; Stochastic optimal control; Unreliable supply; Uverhaul

Indexed keywords

ANALYTICAL MODELLING; CAPITAL ASSET; CONTROL POLICY; COST PARAMETERS; EQUIPMENT FAILURES; EXPECTED LIFE; HEDGING POINT; INFINITE HORIZONS; INTEGRATED SYSTEMS; LEADTIME; MANUFACTURING SYSTEM; RANDOM LEAD TIME; REMANUFACTURING SYSTEM; REPLACEMENT COMPONENTS; REPLACEMENT PARTS; RESPONSE SURFACE METHODOLOGY; SIMULATION EXPERIMENTS; STOCHASTIC OPTIMAL CONTROL; SUPPLY CONTROL; TOTAL COSTS; WORN-OUT EQUIPMENT;

EID: 77952622123     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540902933148     Document Type: Article
Times cited : (13)

References (35)
  • 1
    • 0023440234 scopus 로고
    • Modeling lead-time demand for lumpy demand and variable lead time
    • Bagchi, U., 1987. Modeling lead-time demand for lumpy demand and variable lead time. Naval Research Logistics, 34 (5), 687-704.
    • (1987) Naval Research Logistics , vol.34 , Issue.5 , pp. 687-704
    • Bagchi, U.1
  • 3
    • 61449093931 scopus 로고    scopus 로고
    • Control of a repair and overhaul system with probabilistic parts availability
    • Berthaut, F., Pellerin, R., and Gharbi, A., 2009. Control of a repair and overhaul system with probabilistic parts availability. Production Planning & Control, 20 (1), 57-67.
    • (2009) Production Planning & Control , vol.20 , Issue.1 , pp. 57-67
    • Berthaut, F.1    Pellerin, R.2    Gharbi, A.3
  • 4
    • 0037333176 scopus 로고    scopus 로고
    • Joint optimization of block-replacement and periodicreview spare-provisioning policy
    • Brezavscek, A. and Hudoklin, A., 2003. Joint optimization of block-replacement and periodicreview spare-provisioning policy. IEEE Transactions on Reliability, 52 (1), 112-117.
    • (2003) IEEE Transactions on Reliability , vol.52 , Issue.1 , pp. 112-117
    • Brezavscek, A.1    Hudoklin, A.2
  • 5
    • 0039034212 scopus 로고    scopus 로고
    • Optimality of state-dependent (s, S) policies in inventory models with Markovian modulated demand and lost sales
    • Cheng, F. and Sethi, S.P., 1999. Optimality of state-dependent (s, S) policies in inventory models with Markovian modulated demand and lost sales. Production and Operations management, 8 (2), 183-192.
    • (1999) Production and Operations Management , vol.8 , Issue.2 , pp. 183-192
    • Cheng, F.1    Sethi, S.P.2
  • 6
    • 0004274964 scopus 로고    scopus 로고
    • Alexandria, VA: APICS-Educational Society for Resource Management
    • Cox, J.F. and Blackstone Jr, J.H., 2002. APICS dictionary. Alexandria, VA: APICS-Educational Society for Resource Management.
    • (2002) APICS Dictionary
    • Cox, J.F.1    Blackstone Jr., J.H.2
  • 7
    • 0034634819 scopus 로고    scopus 로고
    • Product acquisition management: Current industry practice and a proposed framework
    • Daniel, V., Guide Jr, R., and Jayaraman, V., 2000. Product acquisition management: current industry practice and a proposed framework. International Journal of Production Research, 38 (16), 3779-3800.
    • (2000) International Journal of Production Research , vol.38 , Issue.16 , pp. 3779-3800
    • Daniel, V.1    Guide Jr., R.2    Jayaraman, V.3
  • 8
    • 0031277045 scopus 로고    scopus 로고
    • Quantitative models for reserve logistics: A review
    • Fleischmann, M., 1997. Quantitative models for reserve logistics: a review. European Journal of Operational Research, 103 (1), 1-17.
    • (1997) European Journal of Operational Research , vol.103 , Issue.1 , pp. 1-17
    • Fleischmann, M.1
  • 12
    • 77952092117 scopus 로고    scopus 로고
    • Joint production and supply control in three levels flexible manufacturing systems
    • doi: 10.1007/s10845-008-0197-y [in press]
    • Hajji, A., Gharbi, A., and Kenne, J.P., 2008. Joint production and supply control in three levels flexible manufacturing systems. Submitted to Journal of Intelligent Manufacturing, doi: 10.1007/s10845-008-0197-y [in press].
    • (2008) Submitted to Journal of Intelligent Manufacturing
    • Hajji, A.1    Gharbi, A.2    Kenne, J.P.3
  • 13
    • 70449424754 scopus 로고    scopus 로고
    • Joint replenishment and manufacturing activities control in three levels unreliable supply chain
    • Hajji, A., Gharbi, A., and Kenne, J.P., 2009. Joint replenishment and manufacturing activities control in three levels unreliable supply chain. Intenational Journal of Production Research, 47 (12), 3231-3251.
    • (2009) Intenational Journal of Production Research , vol.47 , Issue.12 , pp. 3231-3251
    • Hajji, A.1    Gharbi, A.2    Kenne, J.P.3
  • 14
    • 19744372304 scopus 로고    scopus 로고
    • The cost of lead-time variability: The case of the exponential distribution
    • He, X.J., Kim, J.G., and Hayya, J.C., 2005. The cost of lead-time variability: the case of the exponential distribution. International Journal of Production Economics, 97 (2), 130-142.
    • (2005) International Journal of Production Economics , vol.97 , Issue.2 , pp. 130-142
    • He, X.J.1    Kim, J.G.2    Hayya, J.C.3
  • 15
    • 25144521929 scopus 로고    scopus 로고
    • Optimal and near-optimal policies for lost sales inventory models with at most one replenishment order outstanding
    • Hill, R.M. and Johansen, S.G., 2006. Optimal and near-optimal policies for lost sales inventory models with at most one replenishment order outstanding. European Journal of Operational Research, 169 (1), 111-132.
    • (2006) European Journal of Operational Research , vol.169 , Issue.1 , pp. 111-132
    • Hill, R.M.1    Johansen, S.G.2
  • 16
    • 41449114818 scopus 로고    scopus 로고
    • Modeling and analyzing a joint optimization policy of block-replacement and spare inventory with random-leadtime
    • Huang, R., et al., 2008. Modeling and analyzing a joint optimization policy of block-replacement and spare inventory with random-leadtime. IEEE Transactions on Reliability, 57 (1), 113-124.
    • (2008) IEEE Transactions on Reliability , vol.57 , Issue.1 , pp. 113-124
    • Huang, R.1
  • 17
    • 0035815822 scopus 로고    scopus 로고
    • Leadtime effects and policy improvement for stochastic inventory control with remanufacturing
    • Inderfurth, K. and Van der Laan, E., 2001. Leadtime effects and policy improvement for stochastic inventory control with remanufacturing. International Journal of Production Economics, 71 (1-3), 381-390.
    • (2001) International Journal of Production Economics , vol.71 , Issue.1-3 , pp. 381-390
    • Inderfurth, K.1    Van Der Laan, E.2
  • 18
    • 0033079907 scopus 로고    scopus 로고
    • Experimental design in production and maintenance control problem of a single machine, single product manufacturing system
    • Kenne, J.P. and Gharbi, A., 1999. Experimental design in production and maintenance control problem of a single machine, single product manufacturing system. International Journal of Production Research, 37 (3), 621-637.
    • (1999) International Journal of Production Research , vol.37 , Issue.3 , pp. 621-637
    • Kenne, J.P.1    Gharbi, A.2
  • 19
    • 0037449040 scopus 로고    scopus 로고
    • A new approach for controlling a hybrid stochastic manufacturing/ remanufacturing system with inventories and different leadtimes
    • Kiesmüller, G.P., 2003. A new approach for controlling a hybrid stochastic manufacturing/ remanufacturing system with inventories and different leadtimes. European Journal of Operational Research, 147 (1), 62-71.
    • (2003) European Journal of Operational Research , vol.147 , Issue.1 , pp. 62-71
    • Kiesmüller, G.P.1
  • 20
    • 0020915621 scopus 로고
    • An algorithm for the computer control of a flexible manufacturing system
    • Kimemia, J.G. and Gershwin, S.B., 1983. An algorithm for the computer control of a flexible manufacturing system. IIE Transactions, 15 (4), 353-362.
    • (1983) IIE Transactions , vol.15 , Issue.4 , pp. 353-362
    • Kimemia, J.G.1    Gershwin, S.B.2
  • 22
    • 10144234131 scopus 로고    scopus 로고
    • A joint economic lot size model for raw material ordering, manufacturing setup, and finished goods delivering
    • Lee, W., 2005. A joint economic lot size model for raw material ordering, manufacturing setup, and finished goods delivering. Omega, 33 (2), 163-174.
    • (2005) Omega , vol.33 , Issue.2 , pp. 163-174
    • Lee, W.1
  • 23
    • 0028392099 scopus 로고
    • Optimal feedback production planning in a stochastic twomachine flowshop
    • Lou, S., Sethi, S.P., and Zhang, Q., 1994. Optimal feedback production planning in a stochastic twomachine flowshop. European Journal of Operational Research, 73 (2), 331-345.
    • (1994) European Journal of Operational Research , vol.73 , Issue.2 , pp. 331-345
    • Lou, S.1    Sethi, S.P.2    Zhang, Q.3
  • 24
    • 0032051262 scopus 로고    scopus 로고
    • A continuous-review inventory system with lost sales and variable lead time
    • Mohebbi, E. and Posner, M.J.M., 1998. A continuous-review inventory system with lost sales and variable lead time. Naval Research Logistics, 45 (3), 259-278. (Pubitemid 128592886)
    • (1998) Naval Research Logistics , vol.45 , Issue.3 , pp. 259-278
    • Mohebbi, E.1    Posner, M.J.M.2
  • 28
    • 0024048635 scopus 로고
    • Production control of a manufacturing system with multiple machine states
    • Sharifnia, A., 1988. Production control of a manufacturing system with multiple machine states. IEEE Transactions on Automatic Control, 33 (7), 620-625.
    • (1988) IEEE Transactions on Automatic Control , vol.33 , Issue.7 , pp. 620-625
    • Sharifnia, A.1
  • 29
    • 0028424446 scopus 로고
    • The effect of leadtime uncertainty in a simple stochastic inventory model
    • Song, J.S., 1994. The effect of leadtime uncertainty in a simple stochastic inventory model. Management Science, 40 (5), 603-613.
    • (1994) Management Science , vol.40 , Issue.5 , pp. 603-613
    • Song, J.S.1
  • 30
    • 0036758161 scopus 로고    scopus 로고
    • Performance analysis and optimization of assemble-to-order system with ransom lead times
    • Song, J.S. and Yao, D.D., 2002. Performance analysis and optimization of assemble-to-order system with ransom lead times. Operations Research, 50 (5), 889-903.
    • (2002) Operations Research , vol.50 , Issue.5 , pp. 889-903
    • Song, J.S.1    Yao, D.D.2
  • 31
    • 9544249379 scopus 로고    scopus 로고
    • Considering stochastic lead times in a manufacturing/ remanufacturing system, with deterministic demands and returns
    • 285-300
    • Tang, O. and GrubbstrÖm, W., 2005. Considering stochastic lead times in a manufacturing/ remanufacturing system, with deterministic demands and returns. International Journal of Production Economics, 93-94, 285-300.
    • (2005) International Journal of Production Economics , pp. 93-94
    • Tang, O.1    Grubbström, W.2
  • 32
    • 0031251420 scopus 로고    scopus 로고
    • Production planning and inventory control with remanufacturing and disposal
    • Van der Laan, E. and Salomon, M., 1997. Production planning and inventory control with remanufacturing and disposal. European Journal of Operational Research, 102 (2), 264-278.
    • (1997) European Journal of Operational Research , vol.102 , Issue.2 , pp. 264-278
    • Van Der Laan, E.1    Salomon, M.2
  • 33
    • 0345253867 scopus 로고    scopus 로고
    • An investigation of lead-time effects in manufacturing/remanufacturing systems under simple PUSH and PULL strategies
    • Van der Laan, E., Salomon, M., and Dekker, R., 1999. An investigation of lead-time effects in manufacturing/remanufacturing systems under simple PUSH and PULL strategies. European Journal of Operational Research, 115 (1), 195-214.
    • (1999) European Journal of Operational Research , vol.115 , Issue.1 , pp. 195-214
    • Van Der Laan, E.1    Salomon, M.2    Dekker, R.3
  • 34
    • 34249976864 scopus 로고
    • Systems governed by ordinary differential equations with continuous, switching and impulse controls
    • Yong, J., 1989. Systems governed by ordinary differential equations with continuous, switching and impulse controls. Applied Mathematics and Optimization, 20 (3), 223-235.
    • (1989) Applied Mathematics and Optimization , vol.20 , Issue.3 , pp. 223-235
    • Yong, J.1
  • 35
    • 33746782910 scopus 로고    scopus 로고
    • Cost performance and bullwhip effect in a hybrid manufacturing and remanufacturing system with different control policies
    • Zanoni, S., Ferretti, I., and Tang, O., 2006. Cost performance and bullwhip effect in a hybrid manufacturing and remanufacturing system with different control policies. International Journal of Production Research, 44 (18-19), 3847-3862.
    • (2006) International Journal of Production Research , vol.44 , Issue.18-19 , pp. 3847-3862
    • Zanoni, S.1    Ferretti, I.2    Tang, O.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.