메뉴 건너뛰기




Volumn 28, Issue 5, 2010, Pages 514-527

Assessing the overall performance of value engineering workshops for construction projects

Author keywords

Construction projects; Performance assessment; Value engineering workshop

Indexed keywords

CONSTRUCTION PROJECTS; FACTOR ANALYSIS; PERFORMANCE ASSESSMENT; PERFORMANCE ASSESSMENT MODELS; PROCESS IMPROVEMENT; QUESTIONNAIRE SURVEYS; SELF-DIAGNOSIS;

EID: 77952581438     PISSN: 02637863     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijproman.2009.08.005     Document Type: Article
Times cited : (67)

References (19)
  • 2
    • 77950823630 scopus 로고    scopus 로고
    • Measuring performance of a VM program
    • Bethany K. Measuring performance of a VM program. Value World 2003, 26(2):12-17.
    • (2003) Value World , vol.26 , Issue.2 , pp. 12-17
    • Bethany, K.1
  • 3
    • 77952582712 scopus 로고    scopus 로고
    • Evaluating the performance of VE study using factor analysis and AHP. In: Proceedings of SAVE International 44th Annual Conference, Montreal, Canada, July 12-15, CDR-200408.
    • Chang, P.Y., Chen, W.T., 2004. Evaluating the performance of VE study using factor analysis and AHP. In: Proceedings of SAVE International 44th Annual Conference, Montreal, Canada, July 12-15, CDR-200408.
    • (2004)
    • Chang, P.Y.1    Chen, W.T.2
  • 4
    • 77950803659 scopus 로고    scopus 로고
    • Utilization computer to enhance the efficiency of value engineering study
    • (in Chinese)
    • Chen W.T., Chang P.Y. Utilization computer to enhance the efficiency of value engineering study. Journal of Civil and Hydraulic 2008, 35(1):78-85. (in Chinese).
    • (2008) Journal of Civil and Hydraulic , vol.35 , Issue.1 , pp. 78-85
    • Chen, W.T.1    Chang, P.Y.2
  • 5
    • 77952583248 scopus 로고    scopus 로고
    • Modeling the performance of a construction value engineering study. In: Proceedings of the 6th Building Production and Management Technology Conference, Tainan, Taiwan, October 15,(in Chinese).
    • Chen, W.T., Liou, C.S., Wang, C.R., 2003. Modeling the performance of a construction value engineering study. In: Proceedings of the 6th Building Production and Management Technology Conference, Tainan, Taiwan, October 15, pp. 71-84 (in Chinese).
    • (2003) , pp. 71-84
    • Chen, W.T.1    Liou, C.S.2    Wang, C.R.3
  • 7
    • 77952582475 scopus 로고    scopus 로고
    • Federal Highway Administration, The Value Engineering Process.
    • Federal Highway Administration, 2008. The Value Engineering Process. http://www.fhwa.dot.gov/ve/veproc.cfm.
    • (2008)
  • 9
    • 77952581334 scopus 로고    scopus 로고
    • Value elevation by the evaluation of behavioral facilitation skills. In: Proceedings of SAVE International 42nd Conference, Colorado, USA, May 5-8,
    • Leung, M.Y., Wong, K.M., 2002. Value elevation by the evaluation of behavioral facilitation skills. In: Proceedings of SAVE International 42nd Conference, Colorado, USA, May 5-8, pp. 139-145.
    • (2002) , pp. 139-145
    • Leung, M.Y.1    Wong, K.M.2
  • 10
    • 33845760469 scopus 로고    scopus 로고
    • Measuring the performance of value management studies in construction: critical review
    • Lin G., Shen Q. Measuring the performance of value management studies in construction: critical review. Journal of Construction Engineering and Management 2007, 23(1):2-9.
    • (2007) Journal of Construction Engineering and Management , vol.23 , Issue.1 , pp. 2-9
    • Lin, G.1    Shen, Q.2
  • 12
    • 77952585626 scopus 로고    scopus 로고
    • Constructively measuring value programs' effectiveness. In: Proceedings of SAVE International 38th Conference, Washington, DC, June 15-17,
    • Martin, J.S., 1998. Constructively measuring value programs' effectiveness. In: Proceedings of SAVE International 38th Conference, Washington, DC, June 15-17, pp. 239-248.
    • (1998) , pp. 239-248
    • Martin, J.S.1
  • 13
    • 77952584380 scopus 로고
    • Owner/designer participation improver value engineering studies
    • Mohart J.L. Owner/designer participation improver value engineering studies. Value World 1985, 9(3):9-27.
    • (1985) Value World , vol.9 , Issue.3 , pp. 9-27
    • Mohart, J.L.1
  • 16
    • 77952581355 scopus 로고    scopus 로고
    • Keys to successful VE implementation. In: Proceedings of SAVE International 38th Conference, Washington DC, June 15-17,
    • Pucetas, J.D., 1998. Keys to successful VE implementation. In: Proceedings of SAVE International 38th Conference, Washington DC, June 15-17, pp. 333-342.
    • (1998) , pp. 333-342
    • Pucetas, J.D.1
  • 18
    • 13944274913 scopus 로고    scopus 로고
    • Critical success factors for value management studies in construction
    • Shen Q., Liu G. Critical success factors for value management studies in construction. Journal of Construction Engineering and Management 2003, 129(5):485-491.
    • (2003) Journal of Construction Engineering and Management , vol.129 , Issue.5 , pp. 485-491
    • Shen, Q.1    Liu, G.2
  • 19
    • 77950848670 scopus 로고    scopus 로고
    • VM: The collaborative team model
    • Sperling R.B. VM: The collaborative team model. Value World 2002, 24(1):14-16.
    • (2002) Value World , vol.24 , Issue.1 , pp. 14-16
    • Sperling, R.B.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.