메뉴 건너뛰기




Volumn 25, Issue 4, 2010, Pages 357-365

Applying radial basis function neural networks to estimate next-cycle production rates in tunnelling construction

Author keywords

Artificial Intelligence; Construction; Forecast; Productivity; Radial basis function neural networks; Tunnelling

Indexed keywords

ARTIFICIAL INTELLIGENCE; CONSTRUCTION; CRITICAL CURRENT DENSITY (SUPERCONDUCTIVITY); FORECASTING; FUNCTIONS; HARMONIC ANALYSIS; PRODUCTIVITY; TIME SERIES ANALYSIS; TUNNELING (EXCAVATION); TUNNELS;

EID: 77952543983     PISSN: 08867798     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.tust.2010.01.010     Document Type: Article
Times cited : (29)

References (30)
  • 2
    • 0034081507 scopus 로고    scopus 로고
    • Advance rates of hard rock TBMs and their effects on project economics
    • Alber M. Advance rates of hard rock TBMs and their effects on project economics. Tunnelling and Underground Space Technology 2000, 15(1):55-64.
    • (2000) Tunnelling and Underground Space Technology , vol.15 , Issue.1 , pp. 55-64
    • Alber, M.1
  • 3
    • 0036464277 scopus 로고    scopus 로고
    • Some new Q-value correlations to assist in site characterisation and tunnel design
    • Barton N. Some new Q-value correlations to assist in site characterisation and tunnel design. International Journal of Rock Mechanics and Mining Sciences 2002, 39:185-216.
    • (2002) International Journal of Rock Mechanics and Mining Sciences , vol.39 , pp. 185-216
    • Barton, N.1
  • 4
    • 0016313398 scopus 로고
    • Engineering classification of rock mass for the design of tunnel support
    • (NGI Publication 106, Oslo)
    • Barton N., Lien R., Lunde J. Engineering classification of rock mass for the design of tunnel support. Rock Mechanic 1974, 6(4):189-236. (NGI Publication 106, Oslo).
    • (1974) Rock Mechanic , vol.6 , Issue.4 , pp. 189-236
    • Barton, N.1    Lien, R.2    Lunde, J.3
  • 6
    • 0038675123 scopus 로고    scopus 로고
    • Applying the right statistics: analyses of measurement studies
    • Bland J.M., Altman D.G. Applying the right statistics: analyses of measurement studies. Ultrasound in Obstetrics & Gynecology 2003, 22(1):85-93.
    • (2003) Ultrasound in Obstetrics & Gynecology , vol.22 , Issue.1 , pp. 85-93
    • Bland, J.M.1    Altman, D.G.2
  • 9
    • 33746215184 scopus 로고    scopus 로고
    • Bayesian updating application into simulation in the North Edmonton Sanitary Trunk Tunnel project
    • Chung T.H., Mohamed Y., AbouRizk S. Bayesian updating application into simulation in the North Edmonton Sanitary Trunk Tunnel project. Journal of Construction Engineering and Management, ASCE 2006, 132(3):268-277.
    • (2006) Journal of Construction Engineering and Management, ASCE , vol.132 , Issue.3 , pp. 268-277
    • Chung, T.H.1    Mohamed, Y.2    AbouRizk, S.3
  • 12
    • 57649201186 scopus 로고    scopus 로고
    • Development of a rock mass characteristics model for TBM penetration rate prediction
    • Gong Q.M., Zhao J. Development of a rock mass characteristics model for TBM penetration rate prediction. International Journal of Rock Mechanics & Mining Sciences 2008, 10.1016/j.ijrmms.2008.03.003.
    • (2008) International Journal of Rock Mechanics & Mining Sciences
    • Gong, Q.M.1    Zhao, J.2
  • 17
    • 0034324870 scopus 로고    scopus 로고
    • Construction simulation using parallel computing environments
    • Kartam N., Flood I. Construction simulation using parallel computing environments. Automation in Construction 2000, 10:69-78.
    • (2000) Automation in Construction , vol.10 , pp. 69-78
    • Kartam, N.1    Flood, I.2
  • 18
    • 0035482783 scopus 로고    scopus 로고
    • Sensitivity analysis of neural networks in spool fabrication productivity studies
    • Lu M., AbouRizk S., Hermann U. Sensitivity analysis of neural networks in spool fabrication productivity studies. Journal of Computing in Civil Engineering, ASCE 2001, 15(4):299-308.
    • (2001) Journal of Computing in Civil Engineering, ASCE , vol.15 , Issue.4 , pp. 299-308
    • Lu, M.1    AbouRizk, S.2    Hermann, U.3
  • 20
    • 77952544992 scopus 로고    scopus 로고
    • (25.09.2009)
    • NeuroSolutions. 2008. (25.09.2009). http://www.neurosolutions.com/.
    • (2008) NeuroSolutions
  • 21
    • 3242740050 scopus 로고    scopus 로고
    • An integrated regression analysis and time series model for construction tender price index forecasting
    • Ng S.T., Cheung S.O., Skitmore R.M., Wong C.Y. An integrated regression analysis and time series model for construction tender price index forecasting. Construction Management and Economics 2004, 22:483-493.
    • (2004) Construction Management and Economics , vol.22 , pp. 483-493
    • Ng, S.T.1    Cheung, S.O.2    Skitmore, R.M.3    Wong, C.Y.4
  • 24
    • 0036893704 scopus 로고    scopus 로고
    • Prediction of design parameters in civil engineering problems using SLNN with a single hidden RBF neuron
    • Rajasekaran S., Amalraj R. Prediction of design parameters in civil engineering problems using SLNN with a single hidden RBF neuron. Computers and Structures 2002, 80:2495-2505.
    • (2002) Computers and Structures , vol.80 , pp. 2495-2505
    • Rajasekaran, S.1    Amalraj, R.2
  • 28
    • 4944239007 scopus 로고    scopus 로고
    • RBF neural networks for the prediction of building interference effects
    • Zhang A., Zhang L. RBF neural networks for the prediction of building interference effects. Computers and Structures 2004, 82:2333-2339.
    • (2004) Computers and Structures , vol.82 , pp. 2333-2339
    • Zhang, A.1    Zhang, L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.