-
1
-
-
0022769027
-
Static Blocking at Railyards: Sorting Implications and Track Requirements
-
Daganzo, C. F. 1986. Static Blocking at Railyards: Sorting Implications and Track Requirements, Transportation Science, Vol. 20, No. 3.
-
(1986)
Transportation Science
, vol.20
, Issue.3
-
-
Daganzo, C.F.1
-
2
-
-
0020642176
-
Railroad Classification Yard Throughput: The Case of Multistage Triangular Sorting
-
Daganzo, C. F., R. G. Dowling, and R. H. Hall. 1983. Railroad Classification Yard Throughput: The Case of Multistage Triangular Sorting, Transportation Research, Vol. 17A, No.2, 95-106.
-
(1983)
Transportation Research
, vol.17 A
, Issue.2
, pp. 95-106
-
-
Daganzo, C.F.1
Dowling, R.G.2
Hall, R.H.3
-
3
-
-
77951566049
-
Implementing Bottleneck Management Techniques and Establishing Quality of Sort Relationships to Improve Terminal Processing Capacity
-
Dirngerger, J.R. and C. P. L. Barkan. 2006. Implementing Bottleneck Management Techniques and Establishing Quality of Sort Relationships to Improve Terminal Processing Capacity. In Proceedings of the 7th World Congress on Railway Research, Montreal.
-
(2006)
Proceedings of the 7th World Congress on Railway Research, Montreal
-
-
Dirngerger, J.R.1
Barkan, C.P.L.2
-
4
-
-
77951545246
-
-
accessed March 30, 2009
-
Flexsim. 2009. Flexsim CT (Container Terminal Library), 〈http://www.flexsim.co/products/ct〉 [accessed March 30, 2009]
-
(2009)
Flexsim CT (Container Terminal Library)
-
-
-
5
-
-
0036885341
-
Priority-based classification for improving connection reliability in railroad yards - Part 1: Integration with car scheduling
-
Kraft, E.R. 2002. Priority-based classification for improving connection reliability in railroad yards - Part 1: Integration with car scheduling, Journal of the Transportation Research Forum 56:93-105.
-
(2002)
Journal of the Transportation Research Forum
, vol.56
, pp. 93-105
-
-
Kraft, E.R.1
-
6
-
-
0036885339
-
Priority-based classification for improving connection reliability in railroad yards - Part 2: Dynamic block to track assignment
-
Kraft, E.R. 2002. Priority-based classification for improving connection reliability in railroad yards - Part 2: Dynamic block to track assignment, Journal of the Transportation Research Forum 56:107-119
-
(2002)
Journal of the Transportation Research Forum
, vol.56
, pp. 107-119
-
-
Kraft, E.R.1
-
9
-
-
77951549923
-
Asset Velocity, Terminal Performance and Netowrk Fluidity
-
Mercer Management Consulting
-
Mercer Management Consulting. 2006. Asset Velocity, Terminal Performance and Netowrk Fluidity, In MultiRail User Conference, May 24.
-
(2006)
MultiRail User Conference, May 24
-
-
-
10
-
-
0017458041
-
Railyard Modeling: Part I. Prediction of Put-Through Time
-
February
-
Petersen, E. R. 1977. Railyard Modeling: Part I. Prediction of Put-Through Time, Transportation Science, Vol. 11, No. 1, February.
-
(1977)
Transportation Science
, vol.11
, Issue.1
-
-
Petersen, E.R.1
-
11
-
-
5444263336
-
-
Reebie Associates. prepared for U.S. Department of Transportation, Federal Railroad Administration
-
Reebie Associates. 1972. Toward an Effective Demurrage System, prepared for U.S. Department of Transportation, Federal Railroad Administration.
-
(1972)
Toward An Effective Demurrage System
-
-
-
12
-
-
77951603396
-
-
accessed March 30, 2009
-
Simcon. 2009. Villon, 〈http://www.simcon.sk/frames.html〉 [accessed March 30, 2009]
-
(2009)
Villon
-
-
-
13
-
-
77951538802
-
Fine-tuning the Class Yard
-
March
-
Vantuono, William C. 2009. Fine-tuning the Class Yard, RailwayAge, March.
-
(2009)
RailwayAge
-
-
Vantuono William, C.1
-
15
-
-
0020778754
-
An Efficient Sequencing Model for Humping in a Rail Yard
-
Yagar, S., F. F. Saccomanno, and Q. Shi. 1983. An Efficient Sequencing Model for Humping In a Rail Yard, Transpn Research, Vol. 17A, No. 4, 251-262.
-
(1983)
Transpn Research
, vol.17 A
, Issue.4
, pp. 251-262
-
-
Yagar, S.1
Saccomanno, F.F.2
Shi, Q.3
|