1
-
-
0027844904
-
Dispute avoidance and resolution for consulting engineers
-
ASCE, New York
-
Allen, R. K. (1993). " Dispute avoidance and resolution for consulting engineers." Manuals and reports on engineering practice, ASCE, New York, 1-81.
-
(1993)
Manuals and reports on engineering practice
, pp. 1-81
-
-
Allen, R.K.1
-
2
-
-
0001980630
-
Determinants to construction project success
-
IPMAEL 0263-7863
-
Ashley, D. B., Lrie, C. S., and Jaselskis, E. J. (1987). " Determinants to construction project success." Int. J. Proj. Manage. IPMAEL 0263-7863, 18 (2), 69-79.
-
(1987)
Int. J. Proj. Manage.
, vol.18
, Issue.2
, pp. 69-79
-
-
Ashley, D.B.1
Lrie, C.S.2
Jaselskis, E.J.3
-
3
-
-
0003232988
-
Factors affecting project success
-
D. I. Cleland and W. R. King, eds., Van Nostrand Reinhold, Princeton, N.J
-
Baker, B. N., Murphy, D. C., and Fisher, D. (1983). " Factors affecting project success." Project management handbook, D. I. Cleland, and, W. R. King, eds., Van Nostrand Reinhold, Princeton, N.J.
-
(1983)
Project management handbook
-
-
Baker, B.N.1
Murphy, D.C.2
Fisher, D.3
-
6
-
-
1942422934
-
Model uncertainty data mining and statistical inference
-
JSSAEF 0964-1998,. 10.2307/2983440
-
Chatfield, C. (1995). " Model uncertainty data mining and statistical inference." J. R. Stat. Soc. Ser. A (Stat. Soc.) JSSAEF 0964-1998, 158, 419-466. 10.2307/2983440
-
(1995)
J. R. Stat. Soc. Ser. A (Stat. Soc.)
, vol.158
, pp. 419-466
-
-
Chatfield, C.1
-
7
-
-
13944249202
-
Multistep dispute resolution in design and construction industry
-
DOI 10.1061/(ASCE)1052-3928(2003)129:2(84)
-
Cheeks, J. R. (2003). " Multistep dispute resolution in design and construction industry." J. Profl. Issues Eng. Educ. Pract. JPEPE3 1052-3928, 129 (2), 84-91. 10.1061/(ASCE)1052-3928(2003)129:2(84) (Pubitemid 40265266)
-
(2003)
Journal of Professional Issues in Engineering Education and Practice
, vol.129
, Issue.2
, pp. 84-91
-
-
Cheeks, J.R.1
-
9
-
-
0033150276
-
Critical factors affecting the use of alternative dispute resolution processes in construction
-
10.1016/S0263-7863(98)00027-1 0263-7863
-
Cheung, S. O. (1999). " Critical factors affecting the use of alternative dispute resolution processes in construction." Int. J. Proj. Manag., 17 (3), 189-194. 10.1016/S0263-7863(98)00027-1 0263-7863
-
(1999)
Int. J. Proj. Manag.
, vol.17
, Issue.3
, pp. 189-194
-
-
Cheung, S.O.1
-
10
-
-
33646537294
-
Mapping dispute resolution mechanisms with contract types
-
Cheung, S. O. (2002). " Mapping dispute resolution mechanisms with contract types." Cost Engineering, 44 (8), 21-29.
-
(2002)
Cost Engineering
, vol.44
, Issue.8
, pp. 21-29
-
-
Cheung, S.O.1
-
11
-
-
0036812938
-
A multi-attribute utility model for dispute resolution strategy selection
-
DOI 10.1080/01446190210157568
-
Cheung, S. O., and Suen, C. H. (2002a). " A multi-attribute utility model for dispute resolution strategy selection." Constr. Manage. Econom. CMECF3 0144-6193, 20, 557-568. 10.1080/01446190210157568 (Pubitemid 35389899)
-
(2002)
Construction Management and Economics
, vol.20
, Issue.7
, pp. 557-568
-
-
Cheung, S.-O.1
Suen, H.C.H.2
-
12
-
-
13944275935
-
Fundamentals of alternative dispute resolution processes in construction
-
DOI 10.1061/(ASCE)0733-9364(2002)128:5(409)
-
Cheung, S. O., Suen, C. H. H., and Lam, P. (2002b). " The fundamentals of ADR processes in construction." J. Constr. Eng. Manage. JCEMD4 0733-9364, 128 (5), 409-417. 10.1061/(ASCE)0733-9364(2002)128:5(409) (Pubitemid 40265525)
-
(2002)
Journal of Construction Engineering and Management
, vol.128
, Issue.5
, pp. 409-417
-
-
Cheung, S.-O.1
Suen, H.C.H.2
Lam, T.-I.3
-
13
-
-
0033721664
-
Project dispute resolution satisfaction classification through neural networks
-
JMENEA 0742-597X. 10.1061/(ASCE)0742-597X(2000)16:1(70)
-
Cheung, S. O., Tam, C. M., and Harris, F. C. (2000a). " Project dispute resolution satisfaction classification through neural networks." J. Manage. Eng. JMENEA 0742-597X, 16 (1), 70-79. 10.1061/(ASCE)0742-597X(2000)16: 1(70)
-
(2000)
J. Manage. Eng.
, vol.16
, Issue.1
, pp. 70-79
-
-
Cheung, S.O.1
Tam, C.M.2
Harris, F.C.3
-
14
-
-
3342903047
-
Factors affecting clients' project dispute resolution satisfaction in Hong Kong
-
CMECF3 0144-6193. 10.1080/014461900370654
-
Cheung, S. O., Tam, C. M., Ndekugri, I., and Harris, F. C. (2000b). " Factors affecting clients' project dispute resolution satisfaction in Hong Kong." Constr. Manage. Econom. CMECF3 0144-6193, 18 (3), 281-294. 10.1080/014461900370654
-
(2000)
Constr. Manage. Econom.
, vol.18
, Issue.3
, pp. 281-294
-
-
Cheung, S.O.1
Tam, C.M.2
Ndekugri, I.3
Harris, F.C.4
-
15
-
-
77951283703
-
The use of decision support tools in construction dispute negotiation
-
Cheung, S. O., Yiu, T. W., and Chung, K. H. (2005a). " The use of decision support tools in construction dispute negotiation." Australasian Dispute Resolution Journal, 16 (3), 170-186.
-
(2005)
Australasian Dispute Resolution Journal
, vol.16
, Issue.3
, pp. 170-186
-
-
Cheung, S.O.1
Yiu, T.W.2
Chung, K.H.3
-
16
-
-
77951285009
-
Third party interventions in construction dispute negotiation
-
ZZZZZZ 0265-1416
-
Cheung, S. O., Yiu, T. W., and Leung, E. M. Y. (2005b). " Third party interventions in construction dispute negotiation." Int. Constr. Law Rev. ZZZZZZ 0265-1416, 22 (4), 503-518.
-
(2005)
Int. Constr. Law Rev.
, vol.22
, Issue.4
, pp. 503-518
-
-
Cheung, S.O.1
Yiu, T.W.2
Leung, E.M.Y.3
-
17
-
-
13944277715
-
Construction negotiation online
-
DOI 10.1061/(ASCE)0733-9364(2004)130:6(844)
-
Cheung, S. O., Yiu, T. W., and Suen, H. (2004). " CoNegO: Construction negotiation online." J. Constr. Eng. Manage. JCEMD4 0733-9364, 130 (6), 844-852. 10.1061/(ASCE)0733-9364(2004)130:6(844) (Pubitemid 40265317)
-
(2004)
Journal of Construction Engineering and Management
, vol.130
, Issue.6
, pp. 844-852
-
-
Cheung, S.O.1
Yiu, K.T.W.2
Suen, H.3
-
18
-
-
84992782710
-
Bankruptcy prediction: Application of logit analysis in export credit risks
-
ZZZZZZ 1327-2020. 10.1177/031289620603100102
-
Chi, L. C., and Tang, T. C. (2006). " Bankruptcy prediction: Application of logit analysis in export credit risks." Aust. J. Manage. ZZZZZZ 1327-2020, 31 (1), 17-28. 10.1177/031289620603100102
-
(2006)
Aust. J. Manage.
, vol.31
, Issue.1
, pp. 17-28
-
-
Chi, L.C.1
Tang, T.C.2
-
19
-
-
0000914419
-
High school youth dropout and re-enrollment behavior
-
10.1016/S0272-7757(96)00058-1 0272-7757
-
Chuang, H. L. (1997). " High school youth dropout and re-enrollment behavior." Econ. Educ. Rev., 16 (2), 171-186. 10.1016/S0272-7757(96)00058-1 0272-7757
-
(1997)
Econ. Educ. Rev.
, vol.16
, Issue.2
, pp. 171-186
-
-
Chuang, H.L.1
-
20
-
-
0037981803
-
-
Construction Industry Review Committee (CIRC). HKSAR Government, Hong Kong
-
Construction Industry Review Committee (CIRC). (2001) " Tang's report on the Hong Kong construction industry reform." HKSAR Government, Hong Kong.
-
(2001)
Tang's report on the Hong Kong construction industry reform
-
-
-
21
-
-
33746603121
-
Avoiding, managing and winning construction disputes
-
ZZZZZZ 0265-1416
-
Currie, O. A. (1991). " Avoiding, managing and winning construction disputes." Int. Constr. Law Rev. ZZZZZZ 0265-1416, 8 (3), 344-369.
-
(1991)
Int. Constr. Law Rev.
, vol.8
, Issue.3
, pp. 344-369
-
-
Currie, O.A.1
-
22
-
-
33749569777
-
Measurement of project success
-
IPMAEL 0263-7863. 10.1016/0263-7863(88)90043-9
-
de Wit, A. (1988) " Measurement of project success." Int. J. Proj. Manage. IPMAEL 0263-7863, 6 (3), 164-170. 10.1016/0263-7863(88)90043-9
-
(1988)
Int. J. Proj. Manage.
, vol.6
, Issue.3
, pp. 164-170
-
-
De Wit, A.1
-
23
-
-
84937294202
-
A tutorial in logistic regression
-
JMFAA6 0022-2445. 10.2307/353415
-
DeMaris, A. (1995). " A tutorial in logistic regression." J. Marriage Fam. JMFAA6 0022-2445, 57 (4), 956-968. 10.2307/353415
-
(1995)
J. Marriage Fam.
, vol.57
, Issue.4
, pp. 956-968
-
-
Demaris, A.1
-
24
-
-
0029532896
-
Are construction disputes predictable?
-
JCEMD4 0733-9364. 10.1061/(ASCE)0733-9364(1995)121:4(355)
-
Diekmann, J. E., and Girard, M. (1995). " Are construction disputes predictable? " J. Constr. Eng. Manage. JCEMD4 0733-9364, 121 (4), 355-363. 10.1061/(ASCE)0733-9364(1995)121:4(355)
-
(1995)
J. Constr. Eng. Manage.
, vol.121
, Issue.4
, pp. 355-363
-
-
Diekmann, J.E.1
Girard, M.2
-
25
-
-
84886193637
-
The efficiency of logistic regression compared to normal discriminant analysis
-
JSTNAL 0162-1459. 10.2307/2285453
-
Efron, B. (1975). " The efficiency of logistic regression compared to normal discriminant analysis." J. Am. Stat. Assoc. JSTNAL 0162-1459, 70 (352), 892-898. 10.2307/2285453
-
(1975)
J. Am. Stat. Assoc.
, vol.70
, Issue.352
, pp. 892-898
-
-
Efron, B.1
-
27
-
-
77951278419
-
Predicting company failure-A comparison between neural networks and established statistical techniques by applying the McNermar test, computational intelligence for financial engineering
-
New York
-
Eyden, R. J. V., de Wit, P. W. C., and Arron, J. C. (1995). " Predicting company failure-A comparison between neural networks and established statistical techniques by applying the McNermar test, computational intelligence for financial engineering." Proc., IEEE/IAFE, New York, 91-96.
-
(1995)
Proc., IEEE/IAFE
, pp. 91-96
-
-
Eyden, R.J.V.1
De Wit, P.W.C.2
Arron, J.C.3
-
28
-
-
0030953391
-
A review of methods for the assessment of prediction errors in conservation presence/absence models
-
DOI 10.1017/S0376892997000088
-
Fielding, A. H., and Bell, J. F. (1997). " A review of methods for the assessment of prediction errors in conservation presence/absence models." Environ. Conserv., 24 (1), 38-49. 10.1017/S0376892997000088 0376-8929 (Pubitemid 27376840)
-
(1997)
Environmental Conservation
, vol.24
, Issue.1
, pp. 38-49
-
-
Fielding, A.H.1
Bell, J.F.2
-
29
-
-
33746581958
-
Prevention is better than cure, or how to avoid costly mistakes in Hong Kong construction contracts
-
ZZZZZZ 0265-1416
-
Fisher, J. A. (1988). " Prevention is better than cure, or how to avoid costly mistakes in Hong Kong construction contracts." Int. Constr. Law Rev. ZZZZZZ 0265-1416, 342-348.
-
(1988)
Int. Constr. Law Rev.
, pp. 342-348
-
-
Fisher, J.A.1
-
32
-
-
0003506109
-
-
5th Ed., Prentice-Hall, Englewood Cliffs, N.J
-
Hair, A., Tatham, R. L., and Black, W. C. (1995). Multivariate data analysis, 5th Ed., Prentice-Hall, Englewood Cliffs, N.J.
-
(1995)
Multivariate data analysis
-
-
Hair, A.1
Tatham, R.L.2
Black, W.C.3
-
33
-
-
13944259393
-
Effectiveness of dispute review boards
-
DOI 10.1061/(ASCE)0733-9364(2003)129:6(674)
-
Harmon, K. M. J. (2003). " Effectiveness of dispute review boards." J. Constr. Eng. Manage. JCEMD4 0733-9364, 129 (6), 674-679. 10.1061/(ASCE)0733-9364(2003)129:6(674) (Pubitemid 40265427)
-
(2003)
Journal of Construction Engineering and Management
, vol.129
, Issue.6
, pp. 674-679
-
-
Harmon, K.M.J.1
-
34
-
-
33746617344
-
-
Longman Scientific Technical Press
-
Hellard, R. B. (1987). " Managing construction conflict." Longman Scientific Technical Press, 〈http://www.nyu.edu/its/socsci/ consultant/yaffee.html〉.
-
(1987)
Managing construction conflict
-
-
Hellard, R.B.1
-
35
-
-
0033988208
-
Contractual methods for dispute avoidance and resolution (DAR)
-
DOI 10.1016/S0263-7863(98)00070-2, PII S0263786398000702
-
Jannadia, M. O., Assaf, S., Bubshait, A. A., and Naji, A. (2000). " Contractual methods for dispute avoidance and resolution (DAR)." Int. J. Proj. Manage. IPMAEL 0263-7863, 18, 41-49. 10.1016/S0263-7863(98)00070-2 (Pubitemid 30008658)
-
(2000)
International Journal of Project Management
, vol.18
, Issue.1
, pp. 41-49
-
-
Jannadia, M.O.1
Assaf, S.2
Bubshait, A.A.3
Naji, A.4
-
36
-
-
0025901620
-
Zero-based contracts for dispute avoidance
-
ASCE, Reston, Va
-
Jones, L. S. (1991). " Zero-based contracts for dispute avoidance." Proc., Construction Congress, ASCE, Reston, Va., 710-714.
-
(1991)
Proc., Construction Congress
, pp. 710-714
-
-
Jones, L.S.1
-
39
-
-
1142290855
-
Linear discriminant analysis versus logistic regression: A comparison of classification errors in the two-group case
-
10.1080/00220970309600878
-
Lei, P. W., and Koehly, L. M. (2003) " Linear discriminant analysis versus logistic regression: A comparison of classification errors in the two-group case." J. Experimental Educational, 72 (1), 25-49. 10.1080/00220970309600878
-
(2003)
J. Experimental Educational
, vol.72
, Issue.1
, pp. 25-49
-
-
Lei, P.W.1
Koehly, L.M.2
-
40
-
-
4043151588
-
A logistic regression approach to modelling the contractor's decision to bid
-
DOI 10.1080/01446190310001649056
-
Lowe, D. J., and Parvar, J. (2004). " A logistic regression approach to modeling the contractor's decision to bid." Constr. Manage. Econom. CMECF3 0144-6193, 22 (6), 643-653. 10.1080/01446190310001649056 (Pubitemid 39058805)
-
(2004)
Construction Management and Economics
, vol.22
, Issue.6
, pp. 643-653
-
-
Lowe, D.J.1
Parvar, J.2
-
41
-
-
0033578449
-
Comparing discriminant analysis, neural networks and logistic regression for predicting species distributions: A case study with a Himalayan river bird
-
DOI 10.1016/S0304-3800(99)00113-1, PII S0304380099001131
-
Manel, S., Dias, J. M., and Ormerod, S. J. (1999). " Comparing discriminant analysis, neural networks and logistic regression for predicting species distributions: A case study with a Himalayan river bird." Ecol. Modell. ECMODT 0304-3800, 120, 337-347. 10.1016/S0304-3800(99)00113-1 (Pubitemid 29405150)
-
(1999)
Ecological Modelling
, vol.120
, Issue.2-3
, pp. 337-347
-
-
Manel, S.1
Dias, J.-M.2
Ormerod, S.J.3
-
42
-
-
26944499207
-
A retail failure prediction model: The international review of retail
-
JCSRBL 0093-5301. 10.1080/095939698342779
-
Mcgurr, P. T., and DeVaney, S. A. (1998). " A retail failure prediction model: The international review of retail." J. Consum. Res. JCSRBL 0093-5301, 8 (3), 259-276. 10.1080/095939698342779
-
(1998)
J. Consum. Res.
, vol.8
, Issue.3
, pp. 259-276
-
-
Mcgurr, P.T.1
Devaney, S.A.2
-
43
-
-
0000596361
-
Note on the sampling error of the difference between correlated proportions or percentages
-
10.1007/BF02295996
-
McNemar, Q. (1947). " Note on the sampling error of the difference between correlated proportions or percentages." Psychometrica, 12, 153-157. 10.1007/BF02295996
-
(1947)
Psychometrica
, vol.12
, pp. 153-157
-
-
Mcnemar, Q.1
-
46
-
-
0035348571
-
Modeling categorical variables by logistic regression
-
1087-3244
-
Peng, C. Y., Manz, B. D., and Keck, J. (2001). " Modeling categorical variables by logistic regression." Am. J. Health Behav., 25 (3), 278-284. 1087-3244
-
(2001)
Am. J. Health Behav.
, vol.25
, Issue.3
, pp. 278-284
-
-
Peng, C.Y.1
Manz, B.D.2
Keck, J.3
-
47
-
-
85037264679
-
Analysis issues and computing consideration in logistic regression
-
Montreal, (Jan. 2008)
-
Peng, C. Y., and So, T. S. H. (1999). " Analysis issues and computing consideration in logistic regression." Proc., 1999 Annual Meeting of American Educational Research Association, Montreal, 〈 http://php.indiana.edu/~tso/articles/aera99.pdf 〉 (Jan. 2008).
-
(1999)
Proc., 1999 Annual Meeting of American Educational Research Association
-
-
Peng, C.Y.1
So, T.S.H.2
-
48
-
-
0032689156
-
Resolution solutions
-
AATFAA 0001-4419
-
Pinnel, S. (1999). " Resolution solutions." Atti Accad. Sci. Torino, Cl. Sci. Fis., Mat. Nat. AATFAA 0001-4419, 69 (6), 62-64.
-
(1999)
Atti Accad. Sci. Torino, Cl. Sci. Fis., Mat. Nat.
, vol.69
, Issue.6
, pp. 62-64
-
-
Pinnel, S.1
-
49
-
-
0041535881
-
Critical success factors in effective project implementation
-
D. I. Cleland and W. R. King, eds., Van Nostrand Reinhold, New York
-
Pinto, J. K., and Slevin, D. P. (1988). " Critical success factors in effective project implementation." Project management handbook, D. I. Cleland, and, W. R. King, eds., Van Nostrand Reinhold, New York.
-
(1988)
Project management handbook
-
-
Pinto, J.K.1
Slevin, D.P.2
-
50
-
-
17644397985
-
Comparison of logistic regression and linear discriminant analysis: A simulation study
-
0002-7820
-
Pohar, M., Blas, M., and Turk, S. (2004). " Comparison of logistic regression and linear discriminant analysis: A simulation study." Metodoloski zvezki, 1 (1), 143-161. 0002-7820
-
(2004)
Metodoloski zvezki
, vol.1
, Issue.1
, pp. 143-161
-
-
Pohar, M.1
Blas, M.2
Turk, S.3
-
51
-
-
84934379606
-
Choosing between logistic and discriminant analysis
-
JSTNAL 0162-1459. 10.2307/2286261
-
Press, J., and Wilson, S. (1978). " Choosing between logistic and discriminant analysis." J. Am. Stat. Assoc. JSTNAL 0162-1459, 73 (364), 699-705. 10.2307/2286261
-
(1978)
J. Am. Stat. Assoc.
, vol.73
, Issue.364
, pp. 699-705
-
-
Press, J.1
Wilson, S.2
-
52
-
-
0026918024
-
Quantitative study of contractor evaluation programs and their impact
-
JCEMD4 0733-9364. 10.1061/(ASCE)0733-9364(1992)118:3(612)
-
Russell, J. S., and Jaselskis, E. J. (1992). " Quantitative study of contractor evaluation programs and their impact." J. Constr. Eng. Manage. JCEMD4 0733-9364, 118 (3), 612-624. 10.1061/(ASCE)0733-9364(1992)118:3(612)
-
(1992)
J. Constr. Eng. Manage.
, vol.118
, Issue.3
, pp. 612-624
-
-
Russell, J.S.1
Jaselskis, E.J.2
-
53
-
-
3042814122
-
Prediction of software failures through logistic regression
-
10.1016/j.infsof.2003.10.008
-
Salem, A. M., Rekab, K., and Whittaker, J. A. (2004). " Prediction of software failures through logistic regression." J. Inf. Software Tech., 46, 781-789. 10.1016/j.infsof.2003.10.008
-
(2004)
J. Inf. Software Tech.
, vol.46
, pp. 781-789
-
-
Salem, A.M.1
Rekab, K.2
Whittaker, J.A.3
-
54
-
-
0026835330
-
Critical success factors for construction projects
-
JCEMD4 0733-9364. 10.1061/(ASCE)0733-9364(1992)118:1(94)
-
Sanvido, V., Parfitt, K., Guvenis, M., and Coyle, M. (1992). " Critical success factors for construction projects." J. Constr. Eng. Manage. JCEMD4 0733-9364, 118 (1), 94-111. 10.1061/(ASCE)0733-9364(1992)118: 1(94)
-
(1992)
J. Constr. Eng. Manage.
, vol.118
, Issue.1
, pp. 94-111
-
-
Sanvido, V.1
Parfitt, K.2
Guvenis, M.3
Coyle, M.4
-
56
-
-
10244222191
-
Job retention in child welfare: Effects of perceived organizational support, supervisor support, and intrinsic job value
-
DOI 10.1016/j.childyouth.2004.08.013, PII S0190740904001653
-
Smith, B. D. (2005). " Job Retention in child welfare: Effects of perceived organizational support, supervisor support, and intrinsic job value." Child. Youth Serv. Rev., 27, 153-169. 10.1016/j.childyouth.2004.08. 013 0190-7409 (Pubitemid 39620339)
-
(2005)
Children and Youth Services Review
, vol.27
, Issue.2
, pp. 153-169
-
-
Smith, B.D.1
-
57
-
-
0027069097
-
Dispute resolution: Managing construction conflict with step negotiations
-
Spittler, J. R., and Jentzen, G. H. (1992). " Dispute resolution: Managing construction conflict with step negotiations." AACE Int. Trans., D9, 1-10.
-
(1992)
AACE Int. Trans.
, vol.9
, pp. 1-10
-
-
Spittler, J.R.1
Jentzen, G.H.2
-
58
-
-
77951291709
-
Change orders: An unhappy necessity
-
0007-3407
-
Stockenberg, R. A. (2001). " Change orders: An unhappy necessity." Build. Des. Construct., 42 (5), 41. 0007-3407
-
(2001)
Build. Des. Construct.
, vol.42
, Issue.5
, pp. 41
-
-
Stockenberg, R.A.1
-
60
-
-
0029196052
-
Use of alternative dispute resolution in the construction industry
-
JMENEA 0742-597X. 10.1061/(ASCE)0742-597X(1995)11:1(58)
-
Treacy, T. B. (1995). " Use of alternative dispute resolution in the construction industry." J. Manage. Eng. JMENEA 0742-597X, 11 (1), 58-63. 10.1061/(ASCE)0742-597X(1995)11:1(58)
-
(1995)
J. Manage. Eng.
, vol.11
, Issue.1
, pp. 58-63
-
-
Treacy, T.B.1
-
61
-
-
2342421034
-
Success modeling: A technique for building a winning project team
-
Drexel Hill, Pa
-
Tuman, J. (1986). " Success modeling: A technique for building a winning project team." Proc., Project Management Institute, Drexel Hill, Pa., 29-34.
-
(1986)
Proc., Project Management Institute
, pp. 29-34
-
-
Tuman, J.1
-
62
-
-
0021783926
-
Channel scouring potential using logistic analysis
-
JHEND8 0733-9429. 10.1061/(ASCE)0733-9429(1985)111:2(194)
-
Tung, Y. K. (1985). " Channel scouring potential using logistic analysis." J. Hydraul. Eng. JHEND8 0733-9429, 111 (2), 194-205. 10.1061/(ASCE)0733-9429(1985)111:2(194)
-
(1985)
J. Hydraul. Eng.
, vol.111
, Issue.2
, pp. 194-205
-
-
Tung, Y.K.1
-
63
-
-
33746630228
-
Avoidance and resolution of construction disputes-prior to and during the construction process
-
ZZZZZZ 0265-1416
-
Turner, R. H. (1994). " Avoidance and resolution of construction disputes-prior to and during the construction process." Int. Constr. Law Rev. ZZZZZZ 0265-1416, 11, 384-394.
-
(1994)
Int. Constr. Law Rev.
, vol.11
, pp. 384-394
-
-
Turner, R.H.1
-
64
-
-
0000865580
-
Cost-sensitive classification: Empirical evaluation of a hybrid genetic decision tree induction algorithm
-
ZZZZZZ 1076-9757
-
Turney, P. (1995). " Cost-sensitive classification: Empirical evaluation of a hybrid genetic decision tree induction algorithm." J. Artif. Intell. Res. ZZZZZZ 1076-9757, 2, 369-409.
-
(1995)
J. Artif. Intell. Res.
, vol.2
, pp. 369-409
-
-
Turney, P.1
-
65
-
-
33745319286
-
Preventing disputes with empathy
-
DOI 10.1061/(ASCE)1052-3928(2006)132:3(272), 006603QPI
-
Vallero, D. A., and Vesilind, P. A. (2006). " Preventing disputes with empathy." J. Profl. Issues Eng. Educ. Pract. JPEPE3 1052-3928, 132 (3), 272-278. 10.1061/(ASCE)1052-3928(2006)132:3(272) (Pubitemid 43932207)
-
(2006)
Journal of Professional Issues in Engineering Education and Practice
, vol.132
, Issue.3
, pp. 272-278
-
-
Vallero, D.A.1
Vesilind, P.A.2
-
66
-
-
0025807479
-
Dispute review boards not just another alternative dispute resolution method
-
ASCE, New York
-
Vorster, M. C. (1991). " Dispute review boards not just another alternative dispute resolution method." Preparing for construction in the 21st century, ASCE, New York, 772-776.
-
(1991)
Preparing for construction in the 21st century
, pp. 772-776
-
-
Vorster, M.C.1
-
67
-
-
77951278420
-
Claims avoidance-A project management primer
-
0002-7820
-
Werderitsch, A. J., and Krebs, J. E. (2000). " Claims avoidance-A project management primer." AACE Int. Trans., CDR-01. 0002-7820
-
(2000)
AACE Int. Trans.
, vol.1
-
-
Werderitsch, A.J.1
Krebs, J.E.2
-
68
-
-
77951291183
-
The ultimate ADR: American Association of Cost Engineers
-
0002-7820
-
Wilsom, R. L. (1992). " The ultimate ADR: American Association of Cost Engineers." AACE Int. Trans., 2. 0002-7820
-
(1992)
AACE Int. Trans.
, vol.2
-
-
Wilsom, R.L.1
-
69
-
-
21844523527
-
Continuities in marital violence
-
10.1007/BF01531948 0885-7482
-
Woffordt, S., Elliott, D., and Menard, S. (1994). " Continuities in marital violence." J. Fam. Violence, 9 (3), 195-225. 10.1007/BF01531948 0885-7482
-
(1994)
J. Fam. Violence
, vol.9
, Issue.3
, pp. 195-225
-
-
Woffordt, S.1
Elliott, D.2
Menard, S.3
-
70
-
-
13944275602
-
Contractor performance prediction model for the United Kingdom construction contractor: Study of logistic regression approach
-
DOI 10.1061/(ASCE)0733-9364(2004)130:5(691)
-
Wong, C. H. (2004). " Contractor performance prediction model for the United Kingdom construction contractor: A study of the logistic regression approach." J. Constr. Eng. Manage. JCEMD4 0733-9364, 130 (5), 691-698. 10.1061/(ASCE)0733-9364(2004)130:5(691) (Pubitemid 40265335)
-
(2004)
Journal of Construction Engineering and Management
, vol.130
, Issue.5
, pp. 691-698
-
-
Wong, C.H.1
-
71
-
-
0025462150
-
Project performance evaluation checklist for consulting engineers
-
JMENEA 0742-597X. 10.1061/(ASCE)9742-597X(1990)6:3(270)
-
Wuellner, W. W. (1990). " Project performance evaluation checklist for consulting engineers." J. Manage. Eng. JMENEA 0742-597X, 6 (3), 270-281. 10.1061/(ASCE)9742-597X(1990)6:3(270)
-
(1990)
J. Manage. Eng.
, vol.6
, Issue.3
, pp. 270-281
-
-
Wuellner, W.W.1
-
72
-
-
29744452409
-
A catastrophe model of construction conflict behavior
-
DOI 10.1016/j.buildenv.2005.01.007, PII S0360132305000375
-
Yiu, T. W., and Cheung, S. O. (2006). " A catastrophe model of construction conflict behavior." Build. Environ. BUSCBC 0360-1323, 41, 438-447. 10.1016/j.buildenv.2005.01.007 (Pubitemid 43024857)
-
(2006)
Building and Environment
, vol.41
, Issue.4
, pp. 438-447
-
-
Yiu, K.T.W.1
Cheung, S.O.2
|