메뉴 건너뛰기




Volumn 48, Issue 8, 2010, Pages 2345-2360

Workload balancing capability of pull systems in MTO production

Author keywords

CONWIP; M CONWIP; Make to order production; POLCA; Pull systems; Workload balancing

Indexed keywords

ARRIVAL PATTERNS; CONWIP; CUSTOMISATION; MAKE TO ORDER; PROCESSING TIME; PULL SYSTEMS; SHOP FLOOR; THROUGHPUT TIME; WORKLOAD BALANCING;

EID: 77951135434     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540902814314     Document Type: Article
Times cited : (83)

References (20)
  • 1
    • 0036819876 scopus 로고    scopus 로고
    • The workload control concept: Theory and practical extensions of Load Oriented Order Release
    • Breithaupt, J.W., Land, M.J., and Nyhuis, P., 2002. The workload control concept: theory and practical extensions of Load Oriented Order Release. Production Planning and Control, 13 (7), 625-638.
    • (2002) Production Planning and Control , vol.13 , Issue.7 , pp. 625-638
    • Breithaupt, J.W.1    Land, M.J.2    Nyhuis, P.3
  • 3
    • 33747143703 scopus 로고    scopus 로고
    • Generic POLCA-A production and materials flow control mechanism for quick response manufacturing
    • Fernandes, N.O. and Carmo-Silva, S. do, 2006. Generic POLCA-A production and materials flow control mechanism for quick response manufacturing. International Journal of Production Economics, 104, 74-84.
    • (2006) International Journal of Production Economics , vol.104 , pp. 74-84
    • Fernandes, N.O.1    Do, C.S.2
  • 4
  • 5
    • 0036820339 scopus 로고    scopus 로고
    • Workload control in job shops: An introduction to the special issue
    • Gaalman, G.J.C. and Perona, M., 2002. Workload control in job shops: an introduction to the special issue. Production Planning and Control, 13 (7), 565-567.
    • (2002) Production Planning and Control , vol.13 , Issue.7 , pp. 565-567
    • Gaalman, G.J.C.1    Perona, M.2
  • 9
    • 38249027443 scopus 로고
    • Load-limited order release in job shop scheduling systems
    • Kanet, J.J., 1988. Load-limited order release in job shop scheduling systems. Journal of Operations Management, 7 (3), 44-58.
    • (1988) Journal of Operations Management , vol.7 , Issue.3 , pp. 44-58
    • Kanet, J.J.1
  • 10
    • 0032156960 scopus 로고    scopus 로고
    • The performance of workload control concepts in job shops: Improving the release method
    • Land, M.J. and Gaalman, G.J.C., 1998. The performance of workload control concepts in job shops: improving the release method. International Journal of Production Economics, 56/57, 347-364.
    • (1998) International Journal of Production Economics , vol.56-57 , pp. 347-364
    • Land, M.J.1    Gaalman, G.J.C.2
  • 12
    • 0000861722 scopus 로고
    • A proof for the queuing formula: L=-W
    • Little, J.D.C., 1961. A proof for the queuing formula: L=-W. Operations Research, 9, 383-387.
    • (1961) Operations Research , vol.9 , pp. 383-387
    • Little, J.D.C.1
  • 14
    • 74549196960 scopus 로고    scopus 로고
    • Design of POLCA material control system
    • DOI: 10.1080/00207540802570677
    • Riezebos, J., 2009. Design of POLCA material control system. International Journal of Production Research, DOI: 10.1080/00207540802570677.
    • (2009) International Journal of Production Research
    • Riezebos, J.1
  • 16
    • 27744563510 scopus 로고    scopus 로고
    • A review of production planning and control: The applicability of key concepts to the make-to-order industry
    • DOI 10.1080/0020754042000298520
    • Stevenson, M., Hendry, L.C., and Kingsman, B.G., 2005. A review of production planning and control: the applicability of key concepts to the make-to-order industry. International Journal of Production Research, 43 (1), 869-898. (Pubitemid 41633078)
    • (2005) International Journal of Production Research , vol.43 , Issue.5 , pp. 869-898
    • Stevenson, M.1    Hendry, L.C.2    Kingsman, B.G.3
  • 17
    • 0017557653 scopus 로고
    • Toyota production system and kanban system. Materialization of just-in-time and respect-for-human system
    • Sugimori, Y., et al., 1977. Toyota production system and kanban system: materialization of just-intime and respect-for-human system. International Journal of Production Research, 15 (6), 553-564. (Pubitemid 8573924)
    • (1977) International Journal of Production Research , vol.15 , Issue.6 , pp. 553-564
    • Sugimori, Y.1    Kusunoki, K.2    Cho, F.3    Uchikawa, S.4
  • 19
    • 61349198385 scopus 로고    scopus 로고
    • How to plan and implement POLCA: A material control system for high-variety or custom-engineered products
    • University of Wisconsin-Madison, WI
    • Suri, R. and Krishnamurthy, A., 2003. How to plan and implement POLCA: a material control system for high-variety or custom-engineered products. Technical Report, Center for Quick Response Manufacturing, (www.qrmcenter.org), University of Wisconsin-Madison, WI.
    • (2003) Technical Report, Center for Quick Response Manufacturing
    • Suri, R.1    Krishnamurthy, A.2
  • 20
    • 61349103079 scopus 로고    scopus 로고
    • Load-based POLCA: An integrated material control system for multiproduct, multimachine job shops
    • Vandaele, N., et al., 2008. Load-based POLCA: an integrated material control system for multiproduct, multimachine job shops. Manufacturing & Service Operations Management, 10 (2), 181-197.
    • (2008) Manufacturing & Service Operations Management , vol.10 , Issue.2 , pp. 181-197
    • Vandaele, N.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.