Volumn 48, Issue 10, 2010, Pages 2765-2791

A particle swarm optimisation algorithm for multi-plant assembly sequence planning with integrated assembly sequence planning and plant assignment

Author keywords

Assembly sequence planning; Assembly sequences; Collaborative manufacturing; Multi plant; PSO

Indexed keywords

ASSEMBLY COSTS; ASSEMBLY OPERATIONS; ASSEMBLY SEQUENCE; ASSEMBLY SEQUENCE PLANNING; ASSEMBLY SEQUENCE PLANNING PROBLEM; COLLABORATIVE MANUFACTURING; COLLABORATIVE MANUFACTURING SYSTEM; ENCODING SCHEMES; IN-PLANTS; OPERATIONAL CONSTRAINTS; OPERATIONAL COSTS; PARTICLE SWARM OPTIMISATION; PLANT COST; POSITION MATRIX; PRECEDENCE CONSTRAINTS; PSO ALGORITHMS; TEST RESULTS;

EID: 77951097656     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540902791835     Document Type: Article
Times cited : (23)

References (38)
  • 1
    • 0242269889 scopus 로고    scopus 로고
    • A review of the support tools for the process of assembly method selection and assembly planning
    • Abdullah, T.A., Popplewell, K., and Page, C.J., 2003. A review of the support tools for the process of assembly method selection and assembly planning. International Journal of Production Research, 41 (11), 2391-2410.
    • (2003) International Journal of Production Research , vol.41 , Issue.11 , pp. 2391-2410
    • Abdullah, T.A.1    Popplewell, K.2    Page, C.J.3
  • 2
    • 33749548509 scopus 로고    scopus 로고
    • Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times
    • DOI 10.1080/00207540600621029, PII J0534L5672T6N812
    • Allahverdi, A. and Al-Anzi, F.S., 2006. Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times. International Journal of Production Research, 44 (22), 4713-4735. (Pubitemid 44536479)
    • (2006) International Journal of Production Research , vol.44 , Issue.22 , pp. 4713-4735
    • Allahverdi, A.1    Al-Anzi, F.S.2
  • 4
    • 39049136085 scopus 로고    scopus 로고
    • A review of particle swarm optimization. Part II: Hybridization, combinatorial, multicriteria and constrained optimization, and indicative applications
    • Banks, A., Vincent, J., and Anyakoha, C., 2008. A review of particle swarm optimization. Part II: hybridization, combinatorial, multicriteria and constrained optimization, and indicative applications. Natural Computing, 7 (1), 109-124.
    • (2008) Natural Computing , vol.7 , Issue.1 , pp. 109-124
    • Banks, A.1    Vincent, J.2    Anyakoha, C.3
  • 5
    • 0036771306 scopus 로고    scopus 로고
    • A hybrid genetic algorithm approach on multi-objective of assembly planning problem
    • Chen, R.-S., Lu, K.-Y., and Yu, S.-C., 2002. A hybrid genetic algorithm approach on multi-objective of assembly planning problem. Engineering Applications of Artificial Intelligence, 15 (5), 447-457.
    • (2002) Engineering Applications of Artificial Intelligence , vol.15 , Issue.5 , pp. 447-457
    • Chen, R.-S.1    Lu, K.-Y.2    Yu, S.-C.3
  • 6
    • 1642269241 scopus 로고    scopus 로고
    • Optimizing assembly planning through a three-stage integrated approach
    • Chen, R.-S., Lu, K.-Y., and Tai, P.H., 2004. Optimizing assembly planning through a three-stage integrated approach. International Journal of Production Economics, 88 (3), 243-256.
    • (2004) International Journal of Production Economics , vol.88 , Issue.3 , pp. 243-256
    • Chen, R.-S.1    Lu, K.-Y.2    Tai, P.H.3
  • 7
    • 36048931426 scopus 로고    scopus 로고
    • A particle swarm optimization approach to optimization component placement in printed circuit board assembly
    • Chen, Y.-M. and Lin, C.-T., 2007. A particle swarm optimization approach to optimization component placement in printed circuit board assembly. International Journal of Advanced Manufacturing Technology, 35 (5-6), 610-620.
    • (2007) International Journal of Advanced Manufacturing Technology , vol.35 , Issue.5-6 , pp. 610-620
    • Chen, Y.-M.1    Lin, C.-T.2
  • 8
    • 0035841881 scopus 로고    scopus 로고
    • Assembly planning with an ordering generic algorithm
    • De Lit, P., et al., 2001. Assembly planning with an ordering generic algorithm. International Journal of Production Research, 39 (16), 3623-3640.
    • (2001) International Journal of Production Research , vol.39 , Issue.16 , pp. 3623-3640
    • De Lit, P.1
  • 10
    • 34247363625 scopus 로고    scopus 로고
    • A knowledge-based approach to assembly sequence planning
    • Dong, T., et al., 2007. A knowledge-based approach to assembly sequence planning. International Journal of Advanced Manufacturing Technology, 32 (12), 1232-1244.
    • (2007) International Journal of Advanced Manufacturing Technology , vol.32 , Issue.12 , pp. 1232-1244
    • Dong, T.1
  • 11
    • 0031373295 scopus 로고    scopus 로고
    • Representation and selection of assembly sequences in computer-aided assembly process planning
    • Gottipolu, R.B. and Ghosh, K., 1997. Representation and selection of assembly sequences in computer-aided assembly process planning. International Journal of Production Research, 35 (12), 3447-3465.
    • (1997) International Journal of Production Research , vol.35 , Issue.12 , pp. 3447-3465
    • Gottipolu, R.B.1    Ghosh, K.2
  • 12
    • 0037995379 scopus 로고    scopus 로고
    • A simplified and efficient representation for evaluation and selection of assembly sequences
    • Gottipolu, R.B. and Ghosh, K., 2003. A simplified and efficient representation for evaluation and selection of assembly sequences. Computers in Industry, 50 (3), 251-264.
    • (2003) Computers in Industry , vol.50 , Issue.3 , pp. 251-264
    • Gottipolu, R.B.1    Ghosh, K.2
  • 13
    • 70449632611 scopus 로고    scopus 로고
    • Optimisation of integrated process planning and scheduling using a particle swarm optimisation approach
    • DOI: 10.1080/00207540701827905. [In press]
    • Guo, Y.W., et al., 2008. Optimisation of integrated process planning and scheduling using a particle swarm optimisation approach. International Journal of Production Research, DOI: 10.1080/ 00207540701827905. [In press].
    • (2008) International Journal of Production Research
    • Guo, Y.W.1
  • 17
    • 77951144814 scopus 로고    scopus 로고
    • 27 November-1 December, Perth, Australia, Piscataway, NJ: IEEE Service Centre
    • international conference on neural networks, 27 November-1 December, Perth, Australia. Piscataway, NJ: IEEE Service Centre, 1942-1948.
    • International Conference on Neural Networks , pp. 1942-1948
  • 18
    • 0031352450 scopus 로고    scopus 로고
    • A discrete binary version of the particle swarm algorithm
    • man and cybernetics, 12-15 October, Florida, Piscataway, NJ: IEEE Service Centre
    • Kennedy, J. and Eberhart, R.C., 1997. A discrete binary version of the particle swarm algorithm, Proceedings of the international conference on systems, man and cybernetics, 12-15 October, Florida. Piscataway, NJ: IEEE Service Centre, 4104-4109.
    • (1997) Proceedings of the International Conference on Systems , pp. 4104-4109
    • Kennedy, J.1    Eberhart, R.C.2
  • 22
    • 0038341720 scopus 로고    scopus 로고
    • A Tabu-enhanced genetic algorithm approach for assembly process planning
    • Li, J.R., Khoo, L.P., and Tor, S.B., 2003. A Tabu-enhanced genetic algorithm approach for assembly process planning. Journal of Intelligent Manufacturing, 14 (2), 197-208.
    • (2003) Journal of Intelligent Manufacturing , vol.14 , Issue.2 , pp. 197-208
    • Li, J.R.1    Khoo, L.P.2    Tor, S.B.3
  • 23
    • 33847609606 scopus 로고    scopus 로고
    • A discrete version of particle swarm optimization for flowshop scheduling problems
    • Liao, C.J., Tseng, C.T., and Luarn, P., 2007. A discrete version of particle swarm optimization for flowshop scheduling problems. Computers and Operations Research, 34 (10), 3099-3111.
    • (2007) Computers and Operations Research , vol.34 , Issue.10 , pp. 3099-3111
    • Liao, C.J.1    Tseng, C.T.2    Luarn, P.3
  • 24
    • 0027589546 scopus 로고
    • An integrated approach to automated assembly planning for three-dimensional mechanical products
    • Lin, A.C. and Chang, T.C., 1993a. An integrated approach to automated assembly planning for three-dimensional mechanical products. International Journal of Production Research, 31 (5), 1201-1227.
    • (1993) International Journal of Production Research , vol.31 , Issue.5 , pp. 1201-1227
    • Lin, A.C.1    Chang, T.C.2
  • 25
    • 0027886066 scopus 로고
    • 3D MAPS: Three dimensional mechanical assembly planning systems
    • Lin, A.C. and Chang, T.C., 1993b. 3D MAPS: three dimensional mechanical assembly planning systems. Journal of Manufacturing Systems, 12 (6), 437-456.
    • (1993) Journal of Manufacturing Systems , vol.12 , Issue.6 , pp. 437-456
    • Lin, A.C.1    Chang, T.C.2
  • 26
    • 33846194668 scopus 로고    scopus 로고
    • An effective hybrid particle swarm optimization for no-wait flow shop scheduling
    • Liu, B., Wang, L., and Jun, Y.-H., 2007. An effective hybrid particle swarm optimization for no-wait flow shop scheduling. International Journal of Advanced Manufacturing Technology, 31 (9-10), 1001-1011.
    • (2007) International Journal of Advanced Manufacturing Technology , vol.31 , Issue.9-10 , pp. 1001-1011
    • Liu, B.1    Wang, L.2    Jun, Y.-H.3
  • 27
  • 28
    • 15844375543 scopus 로고    scopus 로고
    • Assembly sequence planning and optimization using genetic algorithms
    • Marian, R.M., Luong, L.H.S., and Abhary, K., 2003. Assembly sequence planning and optimization using genetic algorithms. Applied Soft Computing, 2 (3), 223-253.
    • (2003) Applied Soft Computing , vol.2 , Issue.3 , pp. 223-253
    • Marian, R.M.1    Luong, L.H.S.2    Abhary, K.3
  • 29
    • 49349115620 scopus 로고    scopus 로고
    • A hybrid discrete particle swarm optimization for the no-wait flow shop scheduling problem with makespan criterion
    • Pan, Q.-K., et al., 2008. A hybrid discrete particle swarm optimization for the no-wait flow shop scheduling problem with makespan criterion. International Journal of Advanced Manufacturing Technology, 38 (3-4), 337-347.
    • (2008) International Journal of Advanced Manufacturing Technology , vol.38 , Issue.3-4 , pp. 337-347
    • Pan, Q.-K.1
  • 30
    • 0027067346 scopus 로고
    • Computer-aided planning of assembly operations: The selection of assembly sequences
    • Santochi, M. and Dini, G., 1992. Computer-aided planning of assembly operations: the selection of assembly sequences. Robotics and Computer-Integrated Manufacturing, 9 (6), 439-446.
    • (1992) Robotics and Computer-Integrated Manufacturing , vol.9 , Issue.6 , pp. 439-446
    • Santochi, M.1    Dini, G.2
  • 31
    • 1542609867 scopus 로고    scopus 로고
    • Using multiple genetic operators to reduce premature convergence in genetic assembly planning
    • Smith, S.S.-F., 2004. Using multiple genetic operators to reduce premature convergence in genetic assembly planning. Computers in Industry, 54 (1), 35-49.
    • (2004) Computers in Industry , vol.54 , Issue.1 , pp. 35-49
    • Smith, S.S.-F.1
  • 32
    • 34250699017 scopus 로고    scopus 로고
    • Computer aided geometric feasible assembly sequence planning and optimizing
    • Su, Q., 2007. Computer aided geometric feasible assembly sequence planning and optimizing. International Journal of Advanced Manufacturing Technology, 33 (2), 48-57.
    • (2007) International Journal of Advanced Manufacturing Technology , vol.33 , Issue.2 , pp. 48-57
    • Su, Q.1
  • 33
    • 33749545539 scopus 로고    scopus 로고
    • Particle swarm optimization and differential evolution for the single machine total weighted tardiness problem
    • Tasgetiren, M.F., et al., 2006. Particle swarm optimization and differential evolution for the single machine total weighted tardiness problem. International Journal of Production Research, 44 (22), 4737-4754.
    • (2006) International Journal of Production Research , vol.44 , Issue.22 , pp. 4737-4754
    • Tasgetiren, M.F.1
  • 34
    • 48249084195 scopus 로고    scopus 로고
    • A particle swarm optimization algorithm for hybrid flow-shop scheduling with multiprocessor tasks
    • Tseng, C.-T. and Liao, C.-J., 2008. A particle swarm optimization algorithm for hybrid flow-shop scheduling with multiprocessor tasks. International Journal of Production Research, 46 (17), 4655-4670.
    • (2008) International Journal of Production Research , vol.46 , Issue.17 , pp. 4655-4670
    • Tseng, C.-T.1    Liao, C.-J.2
  • 35
    • 34250191469 scopus 로고    scopus 로고
    • Multi-plant assembly panning models for a collaborative manufacturing environment
    • Tseng, Y.-J, Jhang, J.-F., and Huang, F.-Y., 2007. Multi-plant assembly panning models for a collaborative manufacturing environment. International Journal of Production Research, 45 (15), 3333-3349.
    • (2007) International Journal of Production Research , vol.45 , Issue.15 , pp. 3333-3349
    • Jhang, J.-F.1    Huang, F.-Y.2
  • 36
    • 38949181990 scopus 로고    scopus 로고
    • Integrated assembly and machining planning for electronic products using a genetic algorithm approach
    • Tseng, Y.-J., Lin, C.-H., and Lin, Y.-H., 2008. Integrated assembly and machining planning for electronic products using a genetic algorithm approach. International Journal of Advanced Manufacturing Technology, 36 (1-2), 140-155.
    • (2008) International Journal of Advanced Manufacturing Technology , vol.36 , Issue.1-2 , pp. 140-155
    • Tseng, Y.-J.1    Lin, C.-H.2    Lin, Y.-H.3
  • 37
    • 33744526968 scopus 로고    scopus 로고
    • A hybrid particle swarm optimization approach for the job-shop scheduling problem
    • Xia, W.-J. and Wu, Z.-M., 2006. A hybrid particle swarm optimization approach for the job-shop scheduling problem. International Journal of Advanced Manufacturing Technology, 29, 360-366.
    • (2006) International Journal of Advanced Manufacturing Technology , vol.29 , pp. 360-366
    • Xia, W.-J.1    Wu, Z.-M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.