|
Volumn 10, Issue 1-3, 2010, Pages 201-216
|
The effect of inspection errors on the optimal batch size in reworkable production systems with scraps
|
Author keywords
Economic production quantity; EPQ; Inspection errors; Production lot size; Rework; Scrap
|
Indexed keywords
|
EID: 77950666041
PISSN: 14779056
EISSN: 17418178
Source Type: Journal
DOI: 10.1504/IJPD.2010.029993 Document Type: Article |
Times cited : (5)
|
References (12)
|