-
1
-
-
0030289711
-
Lot scheduling in a two-machine cell with swapping devices
-
Agnetis, A., Pacciarelli, D. and Rossi, F. (1996) 'Lot scheduling in a two-machine cell with swapping devices', IIE Transactions, Vol.28, pp.911-917.
-
(1996)
IIE Transactions
, vol.28
, pp. 911-917
-
-
Agnetis, A.1
Pacciarelli, D.2
Rossi, F.3
-
2
-
-
0032273451
-
Scheduling and deadlock avoidance of a flexible manufacturing system
-
Paper presented in the
-
Damasceno, B.C. and Xie, X. (1998) 'Scheduling and deadlock avoidance of a flexible manufacturing system', Paper presented in the Proceedings of the IEEE International Conference on Systems, Man and Cybernetics, Vol.1, pp.564-569.
-
(1998)
Proceedings of the IEEE International Conference on Systems, Man and Cybernetics
, vol.1
, pp. 564-569
-
-
Damasceno, B.C.1
Xie, X.2
-
3
-
-
0142216504
-
Real-time scheduling with deadlock avoidance in flexible manufacturing systems
-
ElMekkawy, T.Y. and ElMaraghy, H.A. (2003) 'Real-time scheduling with deadlock avoidance in flexible manufacturing systems', Int. J. Advanced Manufacturing Technology, Vol.22, pp.259-270.
-
(2003)
Int. J. Advanced Manufacturing Technology
, vol.22
, pp. 259-270
-
-
ElMekkawy, T.Y.1
ElMaraghy, H.A.2
-
4
-
-
84970359014
-
A PROLOG simulator for interactive flexible manufacturing systems control
-
Fan, I.S. and Sackett, P.J. (1988) 'A PROLOG simulator for interactive flexible manufacturing systems control', Simulation, Vol.50, pp.239-247.
-
(1988)
Simulation
, vol.50
, pp. 239-247
-
-
Fan, I.S.1
Sackett, P.J.2
-
5
-
-
0344013604
-
Deadlock-free scheduling of flexible manufacturing workcells using automata theory
-
Paper presented in the
-
Golmakani, H.R., Mills, J.K. and Benhabib, B. (2003) 'Deadlock-free scheduling of flexible manufacturing workcells using automata theory', Paper presented in the Proceedings of the IEEE International Conference on Robotics and Automation, Vol.1, pp.169-174.
-
(2003)
Proceedings of the IEEE International Conference on Robotics and Automation
, vol.1
, pp. 169-174
-
-
Golmakani, H.R.1
Mills, J.K.2
Benhabib, B.3
-
6
-
-
27944444515
-
Optimal scheduling for flexible job shop operation
-
Gomes, M.C., Barbosa-Povoa, A.P. and Novais, A.Q. (2005) 'Optimal scheduling for flexible job shop operation', Int. J. Production Research, Vol.43, pp.2323-2353.
-
(2005)
Int. J. Production Research
, vol.43
, pp. 2323-2353
-
-
Gomes, M.C.1
Barbosa-Povoa, A.P.2
Novais, A.Q.3
-
7
-
-
34848926046
-
A scheduling problem with unrelated parallel machines and sequence dependant setups
-
Gomez Ravetti, M., Mateus, G.R., Rocha, P.L. and Pardalos, P.M. (2007) 'A scheduling problem with unrelated parallel machines and sequence dependant setups', Int. J. Operational Research, Vol.2, pp.380-399.
-
(2007)
Int. J. Operational Research
, vol.2
, pp. 380-399
-
-
Gomez Ravetti, M.1
Mateus, G.R.2
Rocha, P.L.3
Pardalos, P.M.4
-
8
-
-
3042570475
-
Deadlock-free scheduling method for automated manufacturing systems with limited central buffers
-
Paper presented in the
-
Huang, Z. and Wu, Z. (2004a) 'Deadlock-free scheduling method for automated manufacturing systems with limited central buffers', Paper presented in the Proceedings of the IEEE International Conference on Robotics and Automation, Vol.1, pp.560-565.
-
(2004)
Proceedings of the IEEE International Conference on Robotics and Automation
, vol.1
, pp. 560-565
-
-
Huang, Z.1
Wu, Z.2
-
9
-
-
3042586002
-
Deadlock-free scheduling method for automated manufacturing systems using genetic algorithm and Petri nets
-
Paper Presented in the
-
Huang, Z. and Wu, Z. (2004b) 'Deadlock-free scheduling method for automated manufacturing systems using genetic algorithm and Petri nets', Paper presented in the Proceedings of the IEEE International Conference on Robotics and Automation, Vol.1, pp.566-571.
-
(2004)
Proceedings of the IEEE International Conference on Robotics and Automation
, vol.1
, pp. 566-571
-
-
Huang, Z.1
Wu, Z.2
-
10
-
-
0032044924
-
A mathematical model for job shop scheduling with multiple process plan consideration per job
-
Kim, K-H. and Egbelu, P.J. (1998) 'A mathematical model for job shop scheduling with multiple process plan consideration per job', Production Planning and Control, Vol.9, pp.250-259.
-
(1998)
Production Planning and Control
, vol.9
, pp. 250-259
-
-
Kim, K-H.1
Egbelu, P.J.2
-
11
-
-
0032690982
-
Scheduling in a production environment with multiple process plans per job
-
Kim, K-H. and Egbelu, P.J. (1999) 'Scheduling in a production environment with multiple process plans per job', Int. J. Production Research, Vol.37, pp.2725-2753.
-
(1999)
Int. J. Production Research
, vol.37
, pp. 2725-2753
-
-
Kim, K-H.1
Egbelu, P.J.2
-
12
-
-
0032647810
-
Deadlock avoidance for production systems with flexible routing
-
Lawley, M.A. (1999) 'Deadlock avoidance for production systems with flexible routing', IEEE Transactions on Robotics and Automation, Vol.15, pp.497-509.
-
(1999)
IEEE Transactions on Robotics and Automation
, vol.15
, pp. 497-509
-
-
Lawley, M.A.1
-
13
-
-
0026946377
-
An improved formulation for the job-shop scheduling problem
-
Liao, C-J. and You, C-T. (1992) 'An improved formulation for the job-shop scheduling problem', Journal of Operational Research Society, Vol.43, pp.1047-1054.
-
(1992)
Journal of Operational Research Society
, vol.43
, pp. 1047-1054
-
-
Liao, C-J.1
You, C-T.2
-
14
-
-
0033350650
-
Scheduling for production systems with limited buffers
-
Paper presented in the
-
Liljenvall, T. (1999) 'Scheduling for production systems with limited buffers', Paper presented in the Proceedings of the IEEE International Conference on Systems, Man, and Cybernetics, Vol.6, pp.469-474.
-
(1999)
Proceedings of the IEEE International Conference on Systems, Man, and Cybernetics
, vol.6
, pp. 469-474
-
-
Liljenvall, T.1
-
15
-
-
0035836306
-
Mathematical modeling and heuristic approaches to scheduling problems in an FMS environment
-
Low, C. and Wu, T-H. (2001) 'Mathematical modeling and heuristic approaches to scheduling problems in an FMS environment', Int. J. Production Research, Vol.39, pp.689-708.
-
(2001)
Int. J. Production Research
, vol.39
, pp. 689-708
-
-
Low, C.1
Wu, T-H.2
-
16
-
-
27944475064
-
Mathematical modeling of multi-objective job shop scheduling with dependant setups and re-entrant operations
-
Low, C., Wu, T-H. and Hsu, C-H. (2005) 'Mathematical modeling of multi-objective job shop scheduling with dependant setups and re-entrant operations', Int. J. Advanced Manufacturing Technology, Vol.27, pp.181-189.
-
(2005)
Int. J. Advanced Manufacturing Technology
, vol.27
, pp. 181-189
-
-
Low, C.1
Wu, T-H.2
Hsu, C-H.3
-
17
-
-
0027656617
-
Buffer levels and choice of material handling device in flexible manufacturing systems
-
Mahadevan, B. and Narendran, T.T. (1993) 'Buffer levels and choice of material handling device in flexible manufacturing systems', European Journal of Operational Research, Vol.69, pp.166-176.
-
(1993)
European Journal of Operational Research
, vol.69
, pp. 166-176
-
-
Mahadevan, B.1
Narendran, T.T.2
-
18
-
-
0035482220
-
A taboo search approach for deadlock-free scheduling of automated manufacturing systems
-
DOI 10.1023/A:1012260622596
-
Mati, Y., Rezg, N. and Xie, X. (2001a) 'A taboo search approach for deadlock-free scheduling of automated manufacturing systems', Journal of Intelligent Manufacturing, Vol.12, pp.535-552. (Pubitemid 33074845)
-
(2001)
Journal of Intelligent Manufacturing
, vol.12
, Issue.5-6
, pp. 535-552
-
-
Mati, Y.1
Rezg, N.2
Xie, X.3
-
19
-
-
0035705696
-
Geometric approach and taboo search for scheduling flexible manufacturing systems
-
DOI 10.1109/70.975998, PII S1042296X0111164X
-
Mati, Y., Rezg, N. and Xie, X. (2001b) 'Geometric approach and taboo search for scheduling flexible manufacturing systems', IEEE Transactions on Robotics and Automation, Vol.17, pp.805-818. (Pubitemid 34125079)
-
(2001)
IEEE Transactions on Robotics and Automation
, vol.17
, Issue.6
, pp. 805-818
-
-
Mati, Y.1
Rezg, N.2
Xie, X.3
-
20
-
-
34047222441
-
The three-machine flowshop scheduling problem minimize maximum lateness with separate setup times
-
Ng, C.T., Allahverdi, A., Al-Anzi, F.S. and Cheng, T.C.E. (2007) 'The three-machine flowshop scheduling problem minimize maximum lateness with separate setup times', Int. J. Operational Research, Vol.2, pp. 135-155.
-
(2007)
Int. J. Operational Research
, vol.2
, pp. 135-155
-
-
Ng, C.T.1
Allahverdi, A.2
Al-Anzi, F.S.3
Cheng, T.C.E.4
-
21
-
-
7544244249
-
Mixed binary integer programming formulations for the reentrant job shop scheduling problem
-
Pan, J.C-H. and Chen, J-S. (2005) 'Mixed binary integer programming formulations for the reentrant job shop scheduling problem', Computers and Operations Research, Vol.32, pp.1197-1212.
-
(2005)
Computers and Operations Research
, vol.32
, pp. 1197-1212
-
-
Pan, J.C-H.1
Chen, J-S.2
-
22
-
-
40249118429
-
A genetic algorithm for the flexible job-shop scheduling problem
-
Pezzella, F., Morganti, G. and Ciaschetti, G. (2008) 'A genetic algorithm for the flexible job-shop scheduling problem', Computers and Operations Research, Vol.35, pp.3202-3212.
-
(2008)
Computers and Operations Research
, vol.35
, pp. 3202-3212
-
-
Pezzella, F.1
Morganti, G.2
Ciaschetti, G.3
-
23
-
-
34848904519
-
Surgical case scheduling as a generalized job shop scheduling problem
-
Pham, D-N. and Klinkert, A. (2008) 'Surgical case scheduling as a generalized job shop scheduling problem', European Journal of Operational Research, Vol.185, pp.1011-1025.
-
(2008)
European Journal of Operational Research
, vol.185
, pp. 1011-1025
-
-
Pham, D-N.1
Klinkert, A.2
-
25
-
-
33748920331
-
Integrated production and material handling scheduling using mathematical programming and constraint programming
-
Riopel, D., Khayat, G.E. and Langevin, A. (2006) 'Integrated production and material handling scheduling using mathematical programming and constraint programming', European Journal of Operational Research, Vol.175, pp.1818-1832.
-
(2006)
European Journal of Operational Research
, vol.175
, pp. 1818-1832
-
-
Riopel, D.1
Khayat, G.E.2
Langevin, A.3
-
26
-
-
0034209871
-
Mixed integer programming for scheduling flexible flow lines with limited intermediate buffers
-
Sawik, T. (2000) 'Mixed integer programming for scheduling flexible flow lines with limited intermediate buffers', Mathematical and Computer Modeling, Vol.31, pp.39-52.
-
(2000)
Mathematical and Computer Modeling
, vol.31
, pp. 39-52
-
-
Sawik, T.1
-
27
-
-
27944486101
-
Deadlock-free scheduling methods for FMSs using beam search
-
Paper presented in the
-
Shi, X. and Wu, Z. (2005) 'Deadlock-free scheduling methods for FMSs using beam search', Paper presented in the Proceedings of the IEEE International Conference on Systems, Man, and Cybernetics, Vol.2, pp.1188-1193.
-
(2005)
Proceedings of the IEEE International Conference on Systems, Man, and Cybernetics
, vol.2
, pp. 1188-1193
-
-
Shi, X.1
Wu, Z.2
-
28
-
-
84952242943
-
Loading and control policies for a flexible manufacturing system
-
Stecke, K.E. and Solberg, J.J. (1981) 'Loading and control policies for a flexible manufacturing system', Int. J. Production Research, Vol.19, pp.481-1190
-
(1981)
Int. J. Production Research
, vol.19
, pp. 481-1190
-
-
Stecke, K.E.1
Solberg, J.J.2
-
29
-
-
0035556903
-
Modeling and genetic solution of a class of flexible job shop scheduling problems
-
Tamaki, H., Ono, T., Murao, H. and Kitamura, S. (2001) 'Modeling and genetic solution of a class of flexible job shop scheduling problems', IEEE Symposium on Emerging Technologies and Factory Automation, Vol.2, pp.343-350.
-
(2001)
IEEE Symposium on Emerging Technologies and Factory Automation
, vol.2
, pp. 343-350
-
-
Tamaki, H.1
Ono, T.2
Murao, H.3
Kitamura, S.4
-
30
-
-
33644617884
-
Lagrangian relaxation algorithms for real-time hybrid flowshop scheduling with finite intermediate buffers
-
Tang, L. and Xuan, H. (2006) 'Lagrangian relaxation algorithms for real-time hybrid flowshop scheduling with finite intermediate buffers', Journal of the Operational Research Society', Vol.57, pp.316-324.
-
(2006)
Journal of the Operational Research Society
, vol.57
, pp. 316-324
-
-
Tang, L.1
Xuan, H.2
-
31
-
-
0033346278
-
Modeling for flexible manufacturing systems with an FMS blocking mechanism and a BDSM job routing
-
Xiaobo, Z. and Ohno, K. (1999) 'Modeling for flexible manufacturing systems with an FMS blocking mechanism and a BDSM job routing', IIE Transactions, Vol.31, pp.957-963.
-
(1999)
IIE Transactions
, vol.31
, pp. 957-963
-
-
Xiaobo, Z.1
Ohno, K.2
-
33
-
-
0029709086
-
A hybrid heuristic search algorithm for scheduling flexible manufacturing systems
-
Paper presented in the
-
Xiong, H.H., Zhou, M.C. and Caudil, R.J. (1996) 'A hybrid heuristic search algorithm for scheduling flexible manufacturing systems', Paper presented in the Proceedings of the IEEE International Conference on Robotics and Automation, Vol.3, pp.2793-2797.
-
(1996)
Proceedings of the IEEE International Conference on Robotics and Automation
, vol.3
, pp. 2793-2797
-
-
Xiong, H.H.1
Zhou, M.C.2
Caudil, R.J.3
-
34
-
-
0030086204
-
Petri net modeling of buffers in automated manufacturing systems
-
Zhou, M.C. and DiCesare, F. (1996) 'Petri net modeling of buffers in automated manufacturing systems', IEEE Transactions on Systems, Man, and Cybernetics, Vol.26, pp.157-164.
-
(1996)
IEEE Transactions on Systems, Man, and Cybernetics
, vol.26
, pp. 157-164
-
-
Zhou, M.C.1
DiCesare, F.2
|