메뉴 건너뛰기




Volumn 7, Issue 4, 2010, Pages 463-486

Mathematical formulations for scheduling in manufacturing cells with limited capacity buffers

Author keywords

Central buffer; Computational study; Deadlock free scheduling; Flexible cells; Intermediate buffers; Job shop; Material handling; MIP models

Indexed keywords


EID: 77950605528     PISSN: 17457645     EISSN: 17457653     Source Type: Journal    
DOI: 10.1504/IJOR.2010.032422     Document Type: Article
Times cited : (14)

References (34)
  • 1
    • 0030289711 scopus 로고    scopus 로고
    • Lot scheduling in a two-machine cell with swapping devices
    • Agnetis, A., Pacciarelli, D. and Rossi, F. (1996) 'Lot scheduling in a two-machine cell with swapping devices', IIE Transactions, Vol.28, pp.911-917.
    • (1996) IIE Transactions , vol.28 , pp. 911-917
    • Agnetis, A.1    Pacciarelli, D.2    Rossi, F.3
  • 3
    • 0142216504 scopus 로고    scopus 로고
    • Real-time scheduling with deadlock avoidance in flexible manufacturing systems
    • ElMekkawy, T.Y. and ElMaraghy, H.A. (2003) 'Real-time scheduling with deadlock avoidance in flexible manufacturing systems', Int. J. Advanced Manufacturing Technology, Vol.22, pp.259-270.
    • (2003) Int. J. Advanced Manufacturing Technology , vol.22 , pp. 259-270
    • ElMekkawy, T.Y.1    ElMaraghy, H.A.2
  • 4
    • 84970359014 scopus 로고
    • A PROLOG simulator for interactive flexible manufacturing systems control
    • Fan, I.S. and Sackett, P.J. (1988) 'A PROLOG simulator for interactive flexible manufacturing systems control', Simulation, Vol.50, pp.239-247.
    • (1988) Simulation , vol.50 , pp. 239-247
    • Fan, I.S.1    Sackett, P.J.2
  • 7
    • 34848926046 scopus 로고    scopus 로고
    • A scheduling problem with unrelated parallel machines and sequence dependant setups
    • Gomez Ravetti, M., Mateus, G.R., Rocha, P.L. and Pardalos, P.M. (2007) 'A scheduling problem with unrelated parallel machines and sequence dependant setups', Int. J. Operational Research, Vol.2, pp.380-399.
    • (2007) Int. J. Operational Research , vol.2 , pp. 380-399
    • Gomez Ravetti, M.1    Mateus, G.R.2    Rocha, P.L.3    Pardalos, P.M.4
  • 8
    • 3042570475 scopus 로고    scopus 로고
    • Deadlock-free scheduling method for automated manufacturing systems with limited central buffers
    • Paper presented in the
    • Huang, Z. and Wu, Z. (2004a) 'Deadlock-free scheduling method for automated manufacturing systems with limited central buffers', Paper presented in the Proceedings of the IEEE International Conference on Robotics and Automation, Vol.1, pp.560-565.
    • (2004) Proceedings of the IEEE International Conference on Robotics and Automation , vol.1 , pp. 560-565
    • Huang, Z.1    Wu, Z.2
  • 9
    • 3042586002 scopus 로고    scopus 로고
    • Deadlock-free scheduling method for automated manufacturing systems using genetic algorithm and Petri nets
    • Paper Presented in the
    • Huang, Z. and Wu, Z. (2004b) 'Deadlock-free scheduling method for automated manufacturing systems using genetic algorithm and Petri nets', Paper presented in the Proceedings of the IEEE International Conference on Robotics and Automation, Vol.1, pp.566-571.
    • (2004) Proceedings of the IEEE International Conference on Robotics and Automation , vol.1 , pp. 566-571
    • Huang, Z.1    Wu, Z.2
  • 10
    • 0032044924 scopus 로고    scopus 로고
    • A mathematical model for job shop scheduling with multiple process plan consideration per job
    • Kim, K-H. and Egbelu, P.J. (1998) 'A mathematical model for job shop scheduling with multiple process plan consideration per job', Production Planning and Control, Vol.9, pp.250-259.
    • (1998) Production Planning and Control , vol.9 , pp. 250-259
    • Kim, K-H.1    Egbelu, P.J.2
  • 11
    • 0032690982 scopus 로고    scopus 로고
    • Scheduling in a production environment with multiple process plans per job
    • Kim, K-H. and Egbelu, P.J. (1999) 'Scheduling in a production environment with multiple process plans per job', Int. J. Production Research, Vol.37, pp.2725-2753.
    • (1999) Int. J. Production Research , vol.37 , pp. 2725-2753
    • Kim, K-H.1    Egbelu, P.J.2
  • 12
    • 0032647810 scopus 로고    scopus 로고
    • Deadlock avoidance for production systems with flexible routing
    • Lawley, M.A. (1999) 'Deadlock avoidance for production systems with flexible routing', IEEE Transactions on Robotics and Automation, Vol.15, pp.497-509.
    • (1999) IEEE Transactions on Robotics and Automation , vol.15 , pp. 497-509
    • Lawley, M.A.1
  • 13
    • 0026946377 scopus 로고
    • An improved formulation for the job-shop scheduling problem
    • Liao, C-J. and You, C-T. (1992) 'An improved formulation for the job-shop scheduling problem', Journal of Operational Research Society, Vol.43, pp.1047-1054.
    • (1992) Journal of Operational Research Society , vol.43 , pp. 1047-1054
    • Liao, C-J.1    You, C-T.2
  • 15
    • 0035836306 scopus 로고    scopus 로고
    • Mathematical modeling and heuristic approaches to scheduling problems in an FMS environment
    • Low, C. and Wu, T-H. (2001) 'Mathematical modeling and heuristic approaches to scheduling problems in an FMS environment', Int. J. Production Research, Vol.39, pp.689-708.
    • (2001) Int. J. Production Research , vol.39 , pp. 689-708
    • Low, C.1    Wu, T-H.2
  • 16
    • 27944475064 scopus 로고    scopus 로고
    • Mathematical modeling of multi-objective job shop scheduling with dependant setups and re-entrant operations
    • Low, C., Wu, T-H. and Hsu, C-H. (2005) 'Mathematical modeling of multi-objective job shop scheduling with dependant setups and re-entrant operations', Int. J. Advanced Manufacturing Technology, Vol.27, pp.181-189.
    • (2005) Int. J. Advanced Manufacturing Technology , vol.27 , pp. 181-189
    • Low, C.1    Wu, T-H.2    Hsu, C-H.3
  • 17
    • 0027656617 scopus 로고
    • Buffer levels and choice of material handling device in flexible manufacturing systems
    • Mahadevan, B. and Narendran, T.T. (1993) 'Buffer levels and choice of material handling device in flexible manufacturing systems', European Journal of Operational Research, Vol.69, pp.166-176.
    • (1993) European Journal of Operational Research , vol.69 , pp. 166-176
    • Mahadevan, B.1    Narendran, T.T.2
  • 18
    • 0035482220 scopus 로고    scopus 로고
    • A taboo search approach for deadlock-free scheduling of automated manufacturing systems
    • DOI 10.1023/A:1012260622596
    • Mati, Y., Rezg, N. and Xie, X. (2001a) 'A taboo search approach for deadlock-free scheduling of automated manufacturing systems', Journal of Intelligent Manufacturing, Vol.12, pp.535-552. (Pubitemid 33074845)
    • (2001) Journal of Intelligent Manufacturing , vol.12 , Issue.5-6 , pp. 535-552
    • Mati, Y.1    Rezg, N.2    Xie, X.3
  • 19
    • 0035705696 scopus 로고    scopus 로고
    • Geometric approach and taboo search for scheduling flexible manufacturing systems
    • DOI 10.1109/70.975998, PII S1042296X0111164X
    • Mati, Y., Rezg, N. and Xie, X. (2001b) 'Geometric approach and taboo search for scheduling flexible manufacturing systems', IEEE Transactions on Robotics and Automation, Vol.17, pp.805-818. (Pubitemid 34125079)
    • (2001) IEEE Transactions on Robotics and Automation , vol.17 , Issue.6 , pp. 805-818
    • Mati, Y.1    Rezg, N.2    Xie, X.3
  • 20
    • 34047222441 scopus 로고    scopus 로고
    • The three-machine flowshop scheduling problem minimize maximum lateness with separate setup times
    • Ng, C.T., Allahverdi, A., Al-Anzi, F.S. and Cheng, T.C.E. (2007) 'The three-machine flowshop scheduling problem minimize maximum lateness with separate setup times', Int. J. Operational Research, Vol.2, pp. 135-155.
    • (2007) Int. J. Operational Research , vol.2 , pp. 135-155
    • Ng, C.T.1    Allahverdi, A.2    Al-Anzi, F.S.3    Cheng, T.C.E.4
  • 21
    • 7544244249 scopus 로고    scopus 로고
    • Mixed binary integer programming formulations for the reentrant job shop scheduling problem
    • Pan, J.C-H. and Chen, J-S. (2005) 'Mixed binary integer programming formulations for the reentrant job shop scheduling problem', Computers and Operations Research, Vol.32, pp.1197-1212.
    • (2005) Computers and Operations Research , vol.32 , pp. 1197-1212
    • Pan, J.C-H.1    Chen, J-S.2
  • 22
    • 40249118429 scopus 로고    scopus 로고
    • A genetic algorithm for the flexible job-shop scheduling problem
    • Pezzella, F., Morganti, G. and Ciaschetti, G. (2008) 'A genetic algorithm for the flexible job-shop scheduling problem', Computers and Operations Research, Vol.35, pp.3202-3212.
    • (2008) Computers and Operations Research , vol.35 , pp. 3202-3212
    • Pezzella, F.1    Morganti, G.2    Ciaschetti, G.3
  • 23
    • 34848904519 scopus 로고    scopus 로고
    • Surgical case scheduling as a generalized job shop scheduling problem
    • Pham, D-N. and Klinkert, A. (2008) 'Surgical case scheduling as a generalized job shop scheduling problem', European Journal of Operational Research, Vol.185, pp.1011-1025.
    • (2008) European Journal of Operational Research , vol.185 , pp. 1011-1025
    • Pham, D-N.1    Klinkert, A.2
  • 25
    • 33748920331 scopus 로고    scopus 로고
    • Integrated production and material handling scheduling using mathematical programming and constraint programming
    • Riopel, D., Khayat, G.E. and Langevin, A. (2006) 'Integrated production and material handling scheduling using mathematical programming and constraint programming', European Journal of Operational Research, Vol.175, pp.1818-1832.
    • (2006) European Journal of Operational Research , vol.175 , pp. 1818-1832
    • Riopel, D.1    Khayat, G.E.2    Langevin, A.3
  • 26
    • 0034209871 scopus 로고    scopus 로고
    • Mixed integer programming for scheduling flexible flow lines with limited intermediate buffers
    • Sawik, T. (2000) 'Mixed integer programming for scheduling flexible flow lines with limited intermediate buffers', Mathematical and Computer Modeling, Vol.31, pp.39-52.
    • (2000) Mathematical and Computer Modeling , vol.31 , pp. 39-52
    • Sawik, T.1
  • 28
    • 84952242943 scopus 로고
    • Loading and control policies for a flexible manufacturing system
    • Stecke, K.E. and Solberg, J.J. (1981) 'Loading and control policies for a flexible manufacturing system', Int. J. Production Research, Vol.19, pp.481-1190
    • (1981) Int. J. Production Research , vol.19 , pp. 481-1190
    • Stecke, K.E.1    Solberg, J.J.2
  • 30
    • 33644617884 scopus 로고    scopus 로고
    • Lagrangian relaxation algorithms for real-time hybrid flowshop scheduling with finite intermediate buffers
    • Tang, L. and Xuan, H. (2006) 'Lagrangian relaxation algorithms for real-time hybrid flowshop scheduling with finite intermediate buffers', Journal of the Operational Research Society', Vol.57, pp.316-324.
    • (2006) Journal of the Operational Research Society , vol.57 , pp. 316-324
    • Tang, L.1    Xuan, H.2
  • 31
    • 0033346278 scopus 로고    scopus 로고
    • Modeling for flexible manufacturing systems with an FMS blocking mechanism and a BDSM job routing
    • Xiaobo, Z. and Ohno, K. (1999) 'Modeling for flexible manufacturing systems with an FMS blocking mechanism and a BDSM job routing', IIE Transactions, Vol.31, pp.957-963.
    • (1999) IIE Transactions , vol.31 , pp. 957-963
    • Xiaobo, Z.1    Ohno, K.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.