메뉴 건너뛰기




Volumn 25, Issue 2, 2010, Pages

Fuzzy flexible Job-shop scheduling method based on multi-agent immune algorithm

Author keywords

Immune algorithm; Job shop scheduling; Multi agent system

Indexed keywords

DUE DATES; FLEXIBLE JOB-SHOP SCHEDULING; FLEXIBLE JOB-SHOP SCHEDULING PROBLEM; IMMUNE ALGORITHM; INFORMATION PROCESSING; JOB-SHOP SCHEDULING; MULTI-AGENT; PROCESSING TIME; RESOURCE CONSTRAINT; SOLUTION SPACE; UNCERTAINTY FACTORS;

EID: 77950585375     PISSN: 10010920     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (11)

References (16)
  • 1
    • 0032295711 scopus 로고    scopus 로고
    • A genetic algorithm based procedure for more realistic job shop
    • Candido M A B, Khator S K, Barcia M A B. A genetic algorithm based procedure for more realistic job shop[J]. Int J of Production Research, 1998, 36(12): 3437-3457.
    • (1998) Int J of Production Research , vol.36 , Issue.12 , pp. 3437-3457
    • Candido, M.A.B.1    Khator, S.K.2    Barcia, M.A.B.3
  • 2
    • 12844255086 scopus 로고    scopus 로고
    • An efficient algorithm for job shop scheduling problems with fuzzy processing time, fuzzy duedate and alternative machines
    • Pan Q K, Zhu J Y. An efficient algorithm for job shop scheduling problems with fuzzy processing time, fuzzy duedate and alternative machines[J]. China Mechanical Engineering, 2004, 15(24): 2199-2202.
    • (2004) China Mechanical Engineering , vol.15 , Issue.24 , pp. 2199-2202
    • Pan, Q.K.1    Zhu, J.Y.2
  • 3
    • 27944466167 scopus 로고    scopus 로고
    • An opimization method for a multi-objective job-shop scheduling problem under multi-resource constraints
    • Pan Q K, Zhu J Y. An opimization method for a multi-objective job-shop scheduling problem under multi-resource constraints[J]. China Mechanical Engineering, 2005, 16(20): 1821-1825.
    • (2005) China Mechanical Engineering , vol.16 , Issue.20 , pp. 1821-1825
    • Pan, Q.K.1    Zhu, J.Y.2
  • 4
    • 0035546051 scopus 로고    scopus 로고
    • Job shop scheduling with alternative process plans
    • Christoph S Thomalla. Job shop scheduling with alternative process plans[J]. Int J of Production Economics, 2001, 74(1-3): 125-134.
    • (2001) Int J of Production Economics , vol.74 , Issue.1-3 , pp. 125-134
    • Thomalla, C.S.1
  • 5
    • 0033207931 scopus 로고    scopus 로고
    • A batch splitting method for a job shop scheduling problem in an MRP environment
    • Jeong H, Park J, Leachman R C. A batch splitting method for a job shop scheduling problem in an MRP environment[J]. Int J of Production Research, 1999, 37(15): 3583-3598.
    • (1999) Int J of Production Research , vol.37 , Issue.15 , pp. 3583-3598
    • Jeong, H.1    Park, J.2    Leachman, R.C.3
  • 6
    • 33646356482 scopus 로고    scopus 로고
    • Research on fuzzy job shop scheduling with alternative machines
    • Li F M, Zhu Y L, Yin C W, et al. Research on fuzzy job shop scheduling with alternative machines[J]. Computer Integrated Manufacturing Systems, 2006, 12(2): 169-173.
    • (2006) Computer Integrated Manufacturing Systems , vol.12 , Issue.2 , pp. 169-173
    • Li, F.M.1    Zhu, Y.L.2    Yin, C.W.3
  • 7
    • 0041083148 scopus 로고    scopus 로고
    • Scheduling of manufacturing systems under dual-resource constrains using genetic algorithms
    • Eimaraghy H, Patel V, Abdallah I B. Scheduling of manufacturing systems under dual-resource constrains using genetic algorithms[J]. J of Manufacturing Systems, 2000, 19(3): 186-203.
    • (2000) J of Manufacturing Systems , vol.19 , Issue.3 , pp. 186-203
    • Eimaraghy, H.1    Patel, V.2    Abdallah, I.B.3
  • 8
    • 37849188577 scopus 로고    scopus 로고
    • Batch splitting in an assembly scheduling environment
    • Dastidar S G, Nagi R. Batch splitting in an assembly scheduling environment[J]. Int J of Production Economics, 2007, 105(2): 372-384.
    • (2007) Int J of Production Economics , vol.105 , Issue.2 , pp. 372-384
    • Dastidar, S.G.1    Nagi, R.2
  • 9
    • 3042577099 scopus 로고    scopus 로고
    • Optimization method for a job-shop scheduling problem with alternative machines in the batch process
    • Pan Q K, Zhu J Y. Optimization method for a job-shop scheduling problem with alternative machines in the batch process[J]. Chinese J of Mechanical Engineering, 2004, 40(4): 36-39.
    • (2004) Chinese J of Mechanical Engineering , vol.40 , Issue.4 , pp. 36-39
    • Pan, Q.K.1    Zhu, J.Y.2
  • 10
    • 62949213599 scopus 로고    scopus 로고
    • Orthogonal multi-agent genetic algorithm and its application in the function optimization problem
    • Xue M Z, Zhong W C, Liu J, et al. Orthogonal multi-agent genetic algorithm and its application in the function optimization problem[J]. Systems Engineering and Electronics, 2004, 26(9): 1305-1311.
    • (2004) Systems Engineering and Electronics , vol.26 , Issue.9 , pp. 1305-1311
    • Xue, M.Z.1    Zhong, W.C.2    Liu, J.3
  • 11
    • 11844249439 scopus 로고    scopus 로고
    • Optimal approximation of linear systems by multi-agent genetic algorithm
    • Zhong W C, Liu J, Jiao L C. Optimal approximation of linear systems by multi-agent genetic algorithm[J]. Acta Automatica Sinica, 2004, 30(6): 933-938.
    • (2004) Acta Automatica Sinica , vol.30 , Issue.6 , pp. 933-938
    • Zhong, W.C.1    Liu, J.2    Jiao, L.C.3
  • 12
    • 26844463098 scopus 로고    scopus 로고
    • Adaptive immune algorithm for solving job-shop scheduling problem
    • Berlin: Springer Verlag
    • Xu Xinli, Wang Wanliang, Guan Qiu. Adaptive immune algorithm for solving job-shop scheduling problem[C]. 1st Int Conf on Advances in Natural Computation. Berlin: Springer Verlag, 2005: 795-799.
    • (2005) 1st Int Conf on Advances in Natural Computation , pp. 795-799
    • Xu, X.1    Wang, W.2    Guan, Q.3
  • 13
    • 0032592176 scopus 로고    scopus 로고
    • An efficient genetic algorithm for job-shop scheduling problems with fuzzy processing time and fuzzy due date
    • Sakawa M, Mori T. An efficient genetic algorithm for job-shop scheduling problems with fuzzy processing time and fuzzy due date[J]. Computers and Industrial Engineering, 1999, 36(2): 325-341.
    • (1999) Computers and Industrial Engineering , vol.36 , Issue.2 , pp. 325-341
    • Sakawa, M.1    Mori, T.2
  • 15
    • 0033881797 scopus 로고    scopus 로고
    • Fuzzy programming for multi-objective job shop scheduling with fuzzy processing time and fuzzy due date through genetic algorithms
    • Sakawa M, Kubota R. Fuzzy programming for multi-objective job shop scheduling with fuzzy processing time and fuzzy due date through genetic algorithms[J]. European J of Operational Research, 2000, 120(2): 393-407.
    • (2000) European J of Operational Research , vol.120 , Issue.2 , pp. 393-407
    • Sakawa, M.1    Kubota, R.2
  • 16
    • 0036498333 scopus 로고    scopus 로고
    • Multi-agent oriented constraint satisfaction
    • Liu J M, Jing H, Tang Y Y. Multi-agent oriented constraint satisfaction[J]. Artificial Intelligence, 2002, 136(1): 101-144.
    • (2002) Artificial Intelligence , vol.136 , Issue.1 , pp. 101-144
    • Liu, J.M.1    Jing, H.2    Tang, Y.Y.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.