-
1
-
-
0032295711
-
A genetic algorithm based procedure for more realistic job shop
-
Candido M A B, Khator S K, Barcia M A B. A genetic algorithm based procedure for more realistic job shop[J]. Int J of Production Research, 1998, 36(12): 3437-3457.
-
(1998)
Int J of Production Research
, vol.36
, Issue.12
, pp. 3437-3457
-
-
Candido, M.A.B.1
Khator, S.K.2
Barcia, M.A.B.3
-
2
-
-
12844255086
-
An efficient algorithm for job shop scheduling problems with fuzzy processing time, fuzzy duedate and alternative machines
-
Pan Q K, Zhu J Y. An efficient algorithm for job shop scheduling problems with fuzzy processing time, fuzzy duedate and alternative machines[J]. China Mechanical Engineering, 2004, 15(24): 2199-2202.
-
(2004)
China Mechanical Engineering
, vol.15
, Issue.24
, pp. 2199-2202
-
-
Pan, Q.K.1
Zhu, J.Y.2
-
3
-
-
27944466167
-
An opimization method for a multi-objective job-shop scheduling problem under multi-resource constraints
-
Pan Q K, Zhu J Y. An opimization method for a multi-objective job-shop scheduling problem under multi-resource constraints[J]. China Mechanical Engineering, 2005, 16(20): 1821-1825.
-
(2005)
China Mechanical Engineering
, vol.16
, Issue.20
, pp. 1821-1825
-
-
Pan, Q.K.1
Zhu, J.Y.2
-
4
-
-
0035546051
-
Job shop scheduling with alternative process plans
-
Christoph S Thomalla. Job shop scheduling with alternative process plans[J]. Int J of Production Economics, 2001, 74(1-3): 125-134.
-
(2001)
Int J of Production Economics
, vol.74
, Issue.1-3
, pp. 125-134
-
-
Thomalla, C.S.1
-
5
-
-
0033207931
-
A batch splitting method for a job shop scheduling problem in an MRP environment
-
Jeong H, Park J, Leachman R C. A batch splitting method for a job shop scheduling problem in an MRP environment[J]. Int J of Production Research, 1999, 37(15): 3583-3598.
-
(1999)
Int J of Production Research
, vol.37
, Issue.15
, pp. 3583-3598
-
-
Jeong, H.1
Park, J.2
Leachman, R.C.3
-
6
-
-
33646356482
-
Research on fuzzy job shop scheduling with alternative machines
-
Li F M, Zhu Y L, Yin C W, et al. Research on fuzzy job shop scheduling with alternative machines[J]. Computer Integrated Manufacturing Systems, 2006, 12(2): 169-173.
-
(2006)
Computer Integrated Manufacturing Systems
, vol.12
, Issue.2
, pp. 169-173
-
-
Li, F.M.1
Zhu, Y.L.2
Yin, C.W.3
-
7
-
-
0041083148
-
Scheduling of manufacturing systems under dual-resource constrains using genetic algorithms
-
Eimaraghy H, Patel V, Abdallah I B. Scheduling of manufacturing systems under dual-resource constrains using genetic algorithms[J]. J of Manufacturing Systems, 2000, 19(3): 186-203.
-
(2000)
J of Manufacturing Systems
, vol.19
, Issue.3
, pp. 186-203
-
-
Eimaraghy, H.1
Patel, V.2
Abdallah, I.B.3
-
8
-
-
37849188577
-
Batch splitting in an assembly scheduling environment
-
Dastidar S G, Nagi R. Batch splitting in an assembly scheduling environment[J]. Int J of Production Economics, 2007, 105(2): 372-384.
-
(2007)
Int J of Production Economics
, vol.105
, Issue.2
, pp. 372-384
-
-
Dastidar, S.G.1
Nagi, R.2
-
9
-
-
3042577099
-
Optimization method for a job-shop scheduling problem with alternative machines in the batch process
-
Pan Q K, Zhu J Y. Optimization method for a job-shop scheduling problem with alternative machines in the batch process[J]. Chinese J of Mechanical Engineering, 2004, 40(4): 36-39.
-
(2004)
Chinese J of Mechanical Engineering
, vol.40
, Issue.4
, pp. 36-39
-
-
Pan, Q.K.1
Zhu, J.Y.2
-
10
-
-
62949213599
-
Orthogonal multi-agent genetic algorithm and its application in the function optimization problem
-
Xue M Z, Zhong W C, Liu J, et al. Orthogonal multi-agent genetic algorithm and its application in the function optimization problem[J]. Systems Engineering and Electronics, 2004, 26(9): 1305-1311.
-
(2004)
Systems Engineering and Electronics
, vol.26
, Issue.9
, pp. 1305-1311
-
-
Xue, M.Z.1
Zhong, W.C.2
Liu, J.3
-
11
-
-
11844249439
-
Optimal approximation of linear systems by multi-agent genetic algorithm
-
Zhong W C, Liu J, Jiao L C. Optimal approximation of linear systems by multi-agent genetic algorithm[J]. Acta Automatica Sinica, 2004, 30(6): 933-938.
-
(2004)
Acta Automatica Sinica
, vol.30
, Issue.6
, pp. 933-938
-
-
Zhong, W.C.1
Liu, J.2
Jiao, L.C.3
-
12
-
-
26844463098
-
Adaptive immune algorithm for solving job-shop scheduling problem
-
Berlin: Springer Verlag
-
Xu Xinli, Wang Wanliang, Guan Qiu. Adaptive immune algorithm for solving job-shop scheduling problem[C]. 1st Int Conf on Advances in Natural Computation. Berlin: Springer Verlag, 2005: 795-799.
-
(2005)
1st Int Conf on Advances in Natural Computation
, pp. 795-799
-
-
Xu, X.1
Wang, W.2
Guan, Q.3
-
13
-
-
0032592176
-
An efficient genetic algorithm for job-shop scheduling problems with fuzzy processing time and fuzzy due date
-
Sakawa M, Mori T. An efficient genetic algorithm for job-shop scheduling problems with fuzzy processing time and fuzzy due date[J]. Computers and Industrial Engineering, 1999, 36(2): 325-341.
-
(1999)
Computers and Industrial Engineering
, vol.36
, Issue.2
, pp. 325-341
-
-
Sakawa, M.1
Mori, T.2
-
15
-
-
0033881797
-
Fuzzy programming for multi-objective job shop scheduling with fuzzy processing time and fuzzy due date through genetic algorithms
-
Sakawa M, Kubota R. Fuzzy programming for multi-objective job shop scheduling with fuzzy processing time and fuzzy due date through genetic algorithms[J]. European J of Operational Research, 2000, 120(2): 393-407.
-
(2000)
European J of Operational Research
, vol.120
, Issue.2
, pp. 393-407
-
-
Sakawa, M.1
Kubota, R.2
-
16
-
-
0036498333
-
Multi-agent oriented constraint satisfaction
-
Liu J M, Jing H, Tang Y Y. Multi-agent oriented constraint satisfaction[J]. Artificial Intelligence, 2002, 136(1): 101-144.
-
(2002)
Artificial Intelligence
, vol.136
, Issue.1
, pp. 101-144
-
-
Liu, J.M.1
Jing, H.2
Tang, Y.Y.3
|