-
1
-
-
34249921014
-
Scheduling tasks and vehicles in a flexible manufacturing system
-
Blazewicz, J.; Eiselt, H. A.; Finke, G.; Laporte, G.; Weglarz, J. (1991). Scheduling tasks and vehicles in a flexible manufacturing system, International Journal of Flexible Manufacturing Systems, Vol. 4, 5-16
-
(1991)
International Journal of Flexible Manufacturing Systems
, vol.4
, pp. 5-16
-
-
Blazewicz, J.1
Eiselt, H.A.2
Finke, G.3
Laporte, G.4
Weglarz, J.5
-
2
-
-
0032026875
-
Integrated scheduling of material handling and manufacturing activities for JIT production of complex assemblies
-
Anwar, M. F.; Nagi, R. (1998). Integrated scheduling of material handling and manufacturing activities for JIT production of complex assemblies, International Journal of Production Research, Vol. 36, No. 3, 653-681
-
(1998)
International Journal of Production Research
, vol.36
, Issue.3
, pp. 653-681
-
-
Anwar, M.F.1
Nagi, R.2
-
3
-
-
0026898533
-
Experimental investigation of FMS machine and AGV scheduling rules against the mean flow time criterion
-
Sabuncuoglu, I.; Hommertzheim, D. L. (1992). Experimental investigation of FMS machine and AGV scheduling rules against the mean flow time criterion, International Journal of Production Research, Vol. 30, No. 7, 1617-1635
-
(1992)
International Journal of Production Research
, vol.30
, Issue.7
, pp. 1617-1635
-
-
Sabuncuoglu, I.1
Hommertzheim, D.L.2
-
6
-
-
0004061426
-
Positive feed back as a search strategy
-
Dipartimento di Electronica, Politechnico di Milano, Italy
-
Dorigo, M.; Maniezzo, V.; Colorni, A. (1991). Positive feed back as a search strategy, Technical Report 91-016, Dipartimento di Electronica, Politechnico di Milano, Italy
-
(1991)
Technical Report
, pp. 91-016
-
-
Dorigo, M.1
Maniezzo, V.2
Colorni, A.3
-
7
-
-
0022160824
-
Flexible manufacturing systems: A structural approach
-
Kustak, A. (1985). Flexible manufacturing systems: a structural approach, International Journal of Production Research, Vol. 23, No. 6, 1057-1073
-
(1985)
International Journal of Production Research
, vol.23
, Issue.6
, pp. 1057-1073
-
-
Kustak, A.1
-
8
-
-
0022046249
-
The optimality of balancing workload in certain types of FMS
-
Stecke, K. E.; Morin, T. L. (1985). The optimality of balancing workload in certain types of FMS, European Journal of Operations Research, Vol. 20, 68-72
-
(1985)
European Journal of Operations Research
, vol.20
, pp. 68-72
-
-
Stecke, K.E.1
Morin, T.L.2
-
9
-
-
0027187518
-
Concurrent part assignment and tool allocation in FMS with material handling considerations
-
Leung, L. C.; Maheshwari, S. K.; Miller, W. A. (1993). Concurrent part assignment and tool allocation in FMS with material handling considerations, International Journal of Production Research, Vol. 31, 117-138
-
(1993)
International Journal of Production Research
, vol.31
, pp. 117-138
-
-
Leung, L.C.1
Maheshwari, S.K.2
Miller, W.A.3
-
10
-
-
0037507918
-
Minimizing the total flow time of n jobs on a network
-
Simchi-Levi, D.; Berman, O. (1991). Minimizing the total flow time of n jobs on a network, IIE Transactions, Vol. 23, 236-243
-
(1991)
IIE Transactions
, vol.23
, pp. 236-243
-
-
Simchi-Levi, D.1
Berman, O.2
-
11
-
-
0026866144
-
Dynamic dispatching algorithm for scheduling machines and automated guided vehicles in a flexible manufacturing system
-
Sabuncuoglu, I.; Hommertzheim, D. L. (1992). Dynamic dispatching algorithm for scheduling machines and automated guided vehicles in a flexible manufacturing system, International Journal of Production Research, Vol. 30, 1059-1079
-
(1992)
International Journal of Production Research
, vol.30
, pp. 1059-1079
-
-
Sabuncuoglu, I.1
Hommertzheim, D.L.2
-
13
-
-
0027699626
-
Developing conflict-free routes for automated guided vehicles
-
Krishnamurthy. N. N.; Batta, R.; Karwan, M. H. (1993), Developing conflict-free routes for automated guided vehicles, Operations Research, Vol. 41, 1077-1090
-
(1993)
Operations Research
, vol.41
, pp. 1077-1090
-
-
Krishnamurthy, N.N.1
Batta, R.2
Karwan, M.H.3
-
14
-
-
0028428473
-
Expected waiting times in single-device tripbased material handling systems
-
Bozer, Y. A.; Cho, M. S.; Srinivasan, M. M. (1994). Expected waiting times in single-device tripbased material handling systems, European Journal of Operational Research, Vol. 75, 200-216
-
(1994)
European Journal of Operational Research
, vol.75
, pp. 200-216
-
-
Bozer, Y.A.1
Cho, M.S.2
Srinivasan, M.M.3
-
16
-
-
0031124354
-
A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles
-
Ulusoy, G.; Sivrikaya-Serifoglu, F.; Bilge, U. (1997). A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles, Computers & Operations Research, Vol. 24, No. 4, 335-351
-
(1997)
Computers & Operations Research
, vol.24
, Issue.4
, pp. 335-351
-
-
Ulusoy, G.1
Sivrikaya-Serifoglu, F.2
Bilge, U.3
-
19
-
-
0035895120
-
Analysis of automated guided vehicle configurations in flexible manufacturing systems
-
Farling, B. E.; Mosier, C. T; Mahmoodi, F. (2001). Analysis of automated guided vehicle configurations in flexible manufacturing systems, International Journal of Production Research, Vol. 39, No. 18, 4239-4260
-
(2001)
International Journal of Production Research
, vol.39
, Issue.18
, pp. 4239-4260
-
-
Farling, B.E.1
Mosier, C.T.2
Mahmoodi, F.3
-
20
-
-
0042872766
-
Design of a variable path tandem layout for automated guided vehicle systems
-
Yu, W.; Egbelu, P. J. (2001). Design of a variable path tandem layout for automated guided vehicle systems, Journal of Manufacturing Systems, Vol. 20, 305-319
-
(2001)
Journal of Manufacturing Systems
, vol.20
, pp. 305-319
-
-
Yu, W.1
Egbelu, P.J.2
-
21
-
-
0035838746
-
A bi-directional path layout for conflict-free routing of AGVs
-
Qiu, L.; Hsu, W. J. (2001). A bi-directional path layout for conflict-free routing of AGVs, International Journal of Production Research, Vol. 39, 2177-2195
-
(2001)
International Journal of Production Research
, vol.39
, pp. 2177-2195
-
-
Qiu, L.1
Hsu, W.J.2
-
22
-
-
0037085134
-
Scheduling and routing algorithms for AGVs: A survey
-
Qiu, L.; Hsu, W. J.; Huang, S. Y.; Wang, H. (2002). Scheduling and routing algorithms for AGVs: A survey, International Journal of Production Research, Vol. 40, No. 3, 745-760
-
(2002)
International Journal of Production Research
, vol.40
, Issue.3
, pp. 745-760
-
-
Qiu, L.1
Hsu, W.J.2
Huang, S.Y.3
Wang, H.4
-
24
-
-
0038661967
-
Optimal routing of multiple-load AGV subject to LIFO loading constraints
-
Levitin, G.; Abezgaouz, R. (2003). Optimal routing of multiple-load AGV subject to LIFO loading constraints, Computers & Operations Research, Vol. 30, 397-411
-
(2003)
Computers & Operations Research
, vol.30
, pp. 397-411
-
-
Levitin, G.1
Abezgaouz, R.2
-
25
-
-
0037103554
-
Design and analysis of optimal material distribution policies in flexible manufacturing system using a single AGV
-
Veeravalli, B.; Rajesh, G.; Viswanadham, N. (2002). Design and analysis of optimal material distribution policies in flexible manufacturing system using a single AGV, International Journal of Production Research, Vol. 40, 2937-2955
-
(2002)
International Journal of Production Research
, vol.40
, pp. 2937-2955
-
-
Veeravalli, B.1
Rajesh, G.2
Viswanadham, N.3
-
26
-
-
1342287294
-
A hybrid GA/heuristic approach to the simultaneous scheduling of machines and automated guided vehicles
-
Abdelmaguid, T. F.; Nassef, A. O.; Kamal, B.; Hassan, M. F. (2004). A hybrid GA/heuristic approach to the simultaneous scheduling of machines and automated guided vehicles, International Journal of Production Research, Vol. 42, 267-282
-
(2004)
International Journal of Production Research
, vol.42
, pp. 267-282
-
-
Abdelmaguid, T.F.1
Nassef, A.O.2
Kamal, B.3
Hassan, M.F.4
-
27
-
-
3042773041
-
Testing and classifying vehicle dispatching rules in three real world settings
-
De Koster, R.; Le-Anh, T.; Van der Meer, J. R. (2004). Testing and classifying vehicle dispatching rules in three real world settings, Journal of Operations Management, Vol. 22, 369-386
-
(2004)
Journal of Operations Management
, vol.22
, pp. 369-386
-
-
De Koster, R.1
Le-Anh, T.2
Van Der Meer, J.R.3
-
28
-
-
2442641937
-
A Lagrangian relaxation approach to solving the integrated pick-up/drop-off point and AGV flowpath design problem
-
Rajagopalan, S.; Heragu, S. S.; Don Taylor, G. (2004). A Lagrangian relaxation approach to solving the integrated pick-up/drop-off point and AGV flowpath design problem, Applied Mathematical Modelling, Vol. 28, No. 8, 735-750
-
(2004)
Applied Mathematical Modelling
, vol.28
, Issue.8
, pp. 735-750
-
-
Rajagopalan, S.1
Heragu, S.S.2
Taylor, D.G.3
-
29
-
-
0030759617
-
Ant colonies for the travelling salesman problem
-
Dorigo, M.; Gambardella, L. M. (1997). Ant colonies for the travelling salesman problem, Bio Systems, Vol. 43, 73-81
-
(1997)
Bio. Systems
, vol.43
, pp. 73-81
-
-
Dorigo, M.1
Gambardella, L.M.2
-
30
-
-
0033312934
-
The ant systems applied to the quadratic assignment problem
-
Maniezzo, V.; Colorni, A. (1999). The ant systems applied to the quadratic assignment problem, IEEE Transactions Knowledge and Data Engineering, Vol. 11, No. 50, 769-778
-
(1999)
IEEE Transactions Knowledge and Data Engineering
, vol.11
, Issue.50
, pp. 769-778
-
-
Maniezzo, V.1
Colorni, A.2
-
31
-
-
0002298494
-
Ant system for job-shop scheduling
-
Colorni, A.; Dorigo, M.; Maniezzo, V.; Trubian, M. (1994). Ant system for job-shop scheduling, Belgian Journal of Operation Research, Statistics and Computer Science, Vol. 34, 39-53
-
(1994)
Belgian Journal of Operation Research, Statistics and Computer Science
, vol.34
, pp. 39-53
-
-
Colorni, A.1
Dorigo, M.2
Maniezzo, V.3
Trubian, M.4
-
33
-
-
1642559633
-
Ant colony algorithms for permutation flowshop scheduling to minimize makespan/total flowtime of jobs
-
Rajendran, C.; Zeigler, H. (2004). Ant colony algorithms for permutation flowshop scheduling to minimize makespan/total flowtime of jobs, European Journal of Operational Research, Vol. 155, 426-438
-
(2004)
European Journal of Operational Research
, vol.155
, pp. 426-438
-
-
Rajendran, C.1
Zeigler, H.2
-
34
-
-
18744404504
-
An ant colony optimization algorithm for shop scheduling problems
-
Blum, C.; Samples, M. (2004). An ant colony optimization algorithm for shop scheduling problems, Journal of Mathematical Model Algorithms, Vol. 3, 285-308
-
(2004)
Journal of Mathematical Model Algorithms
, vol.3
, pp. 285-308
-
-
Blum, C.1
Samples, M.2
|