-
1
-
-
0001233812
-
Improved algorithm for economic lot size problems
-
Aggarwal, A. and Park, J.K. (1993) Improved algorithm for economic lot size problems. Operations Research, 41(3), 549-571.
-
(1993)
Operations Research
, vol.41
, Issue.3
, pp. 549-571
-
-
Aggarwal, A.1
Park, J.K.2
-
2
-
-
0037449224
-
The single-item lot sizing problem with immediate lost sales
-
Aksen,D., Altinkemer,K. and Chand, S. (2003) The single-item lot sizing problem with immediate lost sales. European Journal of Operational Research, 147(3), 558-566.
-
(2003)
European Journal of Operational Research
, vol.147
, Issue.3
, pp. 558-566
-
-
Aksen, D.1
Altinkemer, K.2
Chand, S.3
-
3
-
-
33645007358
-
Algorithms for themulti-itemmulti-vehicles dynamic lot sizing problem
-
Anily, S. and Tzur,M. (2006) Algorithms for themulti-itemmulti-vehicles dynamic lot sizing problem. Naval Research Logistics, 53(2), 157-169.
-
(2006)
Naval Research Logistics
, vol.53
, Issue.2
, pp. 157-169
-
-
Anily, S.1
Tzur, M.2
-
4
-
-
0035435909
-
Capacity acquisition, subcontracting, and lot sizing
-
Atamẗurk, A. and Hochbaum,D.S. (2001) Capacity acquisition, subcontracting, and lot sizing. Management Science, 47(8), 1081-1100
-
(2001)
Management Science
, vol.47
, Issue.8
, pp. 1081-1100
-
-
Atamẗurk, A.1
Hochbaum, D.S.2
-
5
-
-
25144467855
-
Lot sizing with inventory bounds and fixed costs: Polyhedral study and computation
-
Atamẗurk, A. and Kucukyavuz, S. (2005) Lot sizing with inventory bounds and fixed costs: polyhedral study and computation. Operations Research, 53(4), 711-730.
-
(2005)
Operations Research
, vol.53
, Issue.4
, pp. 711-730
-
-
Atamẗurk, A.1
Kucukyavuz, S.2
-
6
-
-
0022581408
-
Approximation formulations for the single-product capacitated lot size problem
-
Bitran, G.R. and Matsuo, H. (1986) Approximation formulations for the single-product capacitated lot size problem. Operations Research, 34(1), 63-74.
-
(1986)
Operations Research
, vol.34
, Issue.1
, pp. 63-74
-
-
Bitran, G.R.1
Matsuo, H.2
-
7
-
-
0020194024
-
Computational complexity of the capacitated lot size problem
-
Bitran, G.R. and Yanasse, H.H. (1982) Computational complexity of the capacitated lot size problem. Management Science, 28(10), 1174-1186.
-
(1982)
Management Science
, vol.28
, Issue.10
, pp. 1174-1186
-
-
Bitran, G.R.1
Yanasse, H.H.2
-
8
-
-
0023456409
-
Send-and-split method for minimum-concave-cost network flows
-
Erickson, R.E., Monma, C.L. and Veinott, A.F. (1987) Send-and-split method for minimum-concave-cost network flows. Mathematics of Operations Research, 12(4), 634-664.
-
(1987)
Mathematics of Operations Research
, vol.12
, Issue.4
, pp. 634-664
-
-
Erickson, R.E.1
Monma, C.L.2
Veinott, A.F.3
-
9
-
-
0026208005
-
A simple forward algorithm to solve general dynamic lot sizing models with n periods in O(n log n) or O(n) time
-
Federgruen, A. and Tzur,M. (1991) A simple forward algorithm to solve general dynamic lot sizing models with n periods in O(n log n) or O(n) time. Management Science, 37(8), 909-925.
-
(1991)
Management Science
, vol.37
, Issue.8
, pp. 909-925
-
-
Federgruen, A.1
Tzur, M.2
-
10
-
-
0002144134
-
Deterministic production planning with concave costs and capacity constraints
-
Florian, M. and Klein, M. (1971) Deterministic production planning with concave costs and capacity constraints. Management Science, 18(1), 12-20.
-
(1971)
Management Science
, vol.18
, Issue.1
, pp. 12-20
-
-
Florian, M.1
Klein, M.2
-
11
-
-
0019032810
-
Deterministic production planning: Algorithm and complexity
-
Florian, M., Lenstra, J.K. and Rinnooy Kan, A.H.G. (1980) Deterministic production planning: algorithm and complexity. Management Science, 26(7), 669-679.
-
(1980)
Management Science
, vol.26
, Issue.7
, pp. 669-679
-
-
Florian, M.1
Lenstra, J.K.2
Rinnooy Kan, A.H.G.3
-
12
-
-
14644403646
-
The single-product lot sizing problem with constant parameters and backlogging: Exact results, a new solution, and all parameter stability regions
-
Ganas, I. and Papachristos, S. (2005) The single-product lot sizing problem with constant parameters and backlogging: exact results, a new solution, and all parameter stability regions. Operations Research, 53(1), 170-176.
-
(2005)
Operations Research
, vol.53
, Issue.1
, pp. 170-176
-
-
Ganas, I.1
Papachristos, S.2
-
13
-
-
0025213699
-
A fully polynomial approximation scheme for single product scheduling in a finite capacity facility
-
Gavish, B. and Johnson, R.E. (1990) A fully polynomial approximation scheme for single product scheduling in a finite capacity facility. Operations Research, 38(1), 70-83.
-
(1990)
Operations Research
, vol.38
, Issue.1
, pp. 70-83
-
-
Gavish, B.1
Johnson, R.E.2
-
14
-
-
0035382004
-
A tabu-search heuristic for the capacitated lot-sizing problem with set-up carryover
-
Gopalakrishnan, M., Ding, K., Bourjolly, J.-M. and Mohan, S. (2001) A tabu-search heuristic for the capacitated lot-sizing problem with set-up carryover. Management Science, 47(6), 851-863.
-
(2001)
Management Science
, vol.47
, Issue.6
, pp. 851-863
-
-
Gopalakrishnan, M.1
Ding, K.2
Bourjolly, J.-M.3
Mohan, S.4
-
15
-
-
14044277510
-
Dynamic lot size problem with one-way product substitution
-
Hsu, V.N., Li, C.-L. and Xiao, W. (2005) Dynamic lot size problem with one-way product substitution. IIE Transactions, 37(3), 201-215.
-
(2005)
IIE Transactions
, vol.37
, Issue.3
, pp. 201-215
-
-
Hsu, V.N.1
Li, C.-L.2
Xiao, W.3
-
16
-
-
14644443520
-
A two-echelon inventory optimization model with demand time window considerations
-
Jaruphongsa, W., Cetinkaya, S. and Lee, C.-Y. (2004) A two-echelon inventory optimization model with demand time window considerations. Journal of Global Optimization, 30(4), 347-366.
-
(2004)
Journal of Global Optimization
, vol.30
, Issue.4
, pp. 347-366
-
-
Jaruphongsa, W.1
Cetinkaya, S.2
Lee, C.-Y.3
-
17
-
-
18144373806
-
A dynamic lot-sizing model with multi-mode replenishments: Polynomial algorithms for special cases with dual and multiple modes
-
Jaruphongsa, W., Cetinkaya, S. and Lee, C.-Y. (2005) A dynamic lot-sizing model with multi-mode replenishments: polynomial algorithms for special cases with dual and multiple modes. IIE Transactions, 37(5), 453-467.
-
(2005)
IIE Transactions
, vol.37
, Issue.5
, pp. 453-467
-
-
Jaruphongsa, W.1
Cetinkaya, S.2
Lee, C.-Y.3
-
18
-
-
4644236596
-
Production and distribution lot sizing in a two stage supply chain
-
Kaminsky, P. and Simchi-Levi, D. (2003) Production and distribution lot sizing in a two stage supply chain. IIE Transactions, 35(11), 1065-1075.
-
(2003)
IIE Transactions
, vol.35
, Issue.11
, pp. 1065-1075
-
-
Kaminsky, P.1
Simchi-Levi, D.2
-
19
-
-
3042807721
-
A dynamic model for inventory lot sizing and outbound shipment scheduling at a third-party warehouse
-
Lee, C.-Y., Cetinkaya, S. and Jaruphongsa, W. (2003) A dynamic model for inventory lot sizing and outbound shipment scheduling at a third-party warehouse. Operations Research, 51(5), 735-747.
-
(2003)
Operations Research
, vol.51
, Issue.5
, pp. 735-747
-
-
Lee, C.-Y.1
Cetinkaya, S.2
Jaruphongsa, W.3
-
20
-
-
0035494017
-
A dynamic lot sizing model with demand time windows
-
Lee, C.-Y., Cetinkaya, S. and Wagelmans, A.P.M. (2001) A dynamic lot sizing model with demand time windows. Management Science, 47(10), 1384-1395.
-
(2001)
Management Science
, vol.47
, Issue.10
, pp. 1384-1395
-
-
Lee, C.-Y.1
Cetinkaya, S.2
Wagelmans, A.P.M.3
-
21
-
-
19444365210
-
Dynamic lot sizing with batch ordering and truckload discounts
-
Li, C.-L., Hsu, V.N. and Xiao, W. (2004) Dynamic lot sizing with batch ordering and truckload discounts. Operations Research, 52(4), 639-654.
-
(2004)
Operations Research
, vol.52
, Issue.4
, pp. 639-654
-
-
Li, C.-L.1
Hsu, V.N.2
Xiao, W.3
-
22
-
-
34247524736
-
Integrated capacity, demand, and production planning with subcontracting and overtime options
-
Merzifonluóglu, Y., Geunes, J. and Romeijn, H.E. (2007) Integrated capacity, demand, and production planning with subcontracting and overtime options. Naval Research Logistics, 54(4), 433-447.
-
(2007)
Naval Research Logistics
, vol.54
, Issue.4
, pp. 433-447
-
-
Merzifonluóglu, Y.1
Geunes, J.2
Romeijn, H.E.3
-
23
-
-
0025432875
-
A forward algorithm for the capacitated lot size model with stockouts
-
Sandbothe, R.A. and Thompson, G.L. (1990) A forward algorithm for the capacitated lot size model with stockouts. Operations Research, 38(3), 474-486.
-
(1990)
Operations Research
, vol.38
, Issue.3
, pp. 474-486
-
-
Sandbothe, R.A.1
Thompson, G.L.2
-
24
-
-
34248591006
-
Lot-sizing with non-stationary cumulative capacities
-
Sargut, F.Z. and Romeijn, H.E. (2007a) Lot-sizing with non-stationary cumulative capacities. Operations Research Letters, 35(4), 549-557.
-
(2007)
Operations Research Letters
, vol.35
, Issue.4
, pp. 549-557
-
-
Sargut, F.Z.1
Romeijn, H.E.2
-
25
-
-
34548699145
-
Capacitated production and subcontracting in a serial supply chain
-
Sargut, F.Z. and Romeijn, H.E. (2007b) Capacitated production and subcontracting in a serial supply chain. IIE Transactions, 39(11), 1031-1043.
-
(2007)
IIE Transactions
, vol.39
, Issue.11
, pp. 1031-1043
-
-
Sargut, F.Z.1
Romeijn, H.E.2
-
26
-
-
0141733592
-
Multilevel lot sizing with setup times and multiple constrained resources: Internally rolling schedules with lot sizing windows
-
Stadtler, H. (2003) Multilevel lot sizing with setup times and multiple constrained resources: Internally rolling schedules with lot sizing windows. Operations Research, 51(3), 487-502.
-
(2003)
Operations Research
, vol.51
, Issue.3
, pp. 487-502
-
-
Stadtler, H.1
-
27
-
-
0034751529
-
Multistage lot sizing problems via randomized rounding
-
Teo, C.-P. and Bertsimas, D. (2001) Multistage lot sizing problems via randomized rounding. Operations Research, 49(4), 599-608.
-
(2001)
Operations Research
, vol.49
, Issue.4
, pp. 599-608
-
-
Teo, C.-P.1
Bertsimas, D.2
-
28
-
-
33748479670
-
Dynamic lot sizing with production returns and remanufacturing
-
Teunter, R.H., Bayindir, Z.P. and Van den Heuvel, W. (2006) Dynamic lot sizing with production returns and remanufacturing. International Journal of Production Research, 44(20), 4377-4400.
-
(2006)
International Journal of Production Research
, vol.44
, Issue.20
, pp. 4377-4400
-
-
Teunter, R.H.1
Bayindir, Z.P.2
Van Den Heuvel, W.3
-
29
-
-
77649304854
-
-
Ph.D. Thesis. Erasmus Research Institute of Management, Erasmus University, Rotterdam, The Netherlands
-
Van den Heuvel. (2006) The economic lot-sizing problem: New results and extensions. Ph.D. Thesis. Erasmus Research Institute of Management, Erasmus University, Rotterdam, The Netherlands.
-
(2006)
The Economic Lot-sizing Problem: New Results and Extensions
-
-
Van Den, H.1
-
31
-
-
0001491020
-
An O(T3) algorithm for the economic lot sizing problem with constant capacities
-
Van Hoesel, C.P.M. andWagelmans, A.P.M. (1996) An O(T3) algorithm for the economic lot sizing problem with constant capacities. Management Science, 42(1), 142-150.
-
(1996)
Management Science
, vol.42
, Issue.1
, pp. 142-150
-
-
Van Hoesel, C.P.M.1
Wagelmans, A.P.M.2
-
32
-
-
0035351621
-
Fully polynomial approximation schemes for single-item capacitated economic lotsizing problems
-
Van Hoesel, C.P.M. and Wagelmans, A.P.M. (2001) Fully polynomial approximation schemes for single-item capacitated economic lotsizing problems. Mathematics of Operations Research, 26(2), 339-357.
-
(2001)
Mathematics of Operations Research
, vol.26
, Issue.2
, pp. 339-357
-
-
Van Hoesel, C.P.M.1
Wagelmans, A.P.M.2
-
33
-
-
27744547914
-
Integrated lot sizing in serial supply chains with production capacities
-
Van Hoesel, S., Romeijn, H.E., Morales, D.R. and Wagelmans, A.P.M. (2005) Integrated lot sizing in serial supply chains with production capacities. Management Science, 51(11), 1706-1719.
-
(2005)
Management Science
, vol.51
, Issue.11
, pp. 1706-1719
-
-
Van Hoesel, S.1
Romeijn, H.E.2
Morales, D.R.3
Wagelmans, A.P.M.4
-
34
-
-
0000495984
-
An O(n log n) algorithm that runs in linear time in theWagner-Whitin case
-
Wagelmans, A.P.M., Van Hoesel, S. and Kolen, A. (1992) An O(n log n) algorithm that runs in linear time in theWagner-Whitin case. Operations Research, 40(1), S145-S156.
-
(1992)
Operations Research
, vol.40
, Issue.1
-
-
Wagelmans, A.P.M.1
Van Hoesel, S.2
Kolen, A.3
-
35
-
-
0040913946
-
A postscript to "dynamic problems in the theory of the firm."
-
Wagner, H.M. (1960) A postscript to "dynamic problems in the theory of the firm." Naval Research Logistics Quarterly, 7(1), 7-12.
-
(1960)
Naval Research Logistics Quarterly
, vol.7
, Issue.1
, pp. 7-12
-
-
Wagner, H.M.1
-
36
-
-
0001962762
-
Dynamic version of the economic lot size model
-
Wagner,H.M. andWhitin, T.M. (1958) Dynamic version of the economic lot size model. Management Science, 5(1), 89-96.
-
(1958)
Management Science
, vol.5
, Issue.1
, pp. 89-96
-
-
Wagner, H.M.1
Whitin, T.M.2
-
37
-
-
0036968625
-
Solving multi-item lot-sizing problems with an MIP solver using classification and reformulation
-
Wolsey, L.A. (2002) Solving multi-item lot-sizing problems with an MIP solver using classification and reformulation. Management Science, 48(12), 1587-1602.
-
(2002)
Management Science
, vol.48
, Issue.12
, pp. 1587-1602
-
-
Wolsey, L.A.1
-
38
-
-
24144492367
-
A concave-cost production planning problem with remanufacturing options
-
Yang, J., Golany, B. and Yu, G. (2005) A concave-cost production planning problem with remanufacturing options. Naval Research Logistics, 52(5), 443-458.
-
(2005)
Naval Research Logistics
, vol.52
, Issue.5
, pp. 443-458
-
-
Yang, J.1
Golany, B.2
Yu, G.3
-
39
-
-
0000631024
-
Abacklogging model and amultiechelon model of a dynamic economic lot size production system-a network approach
-
Zangwill,W.I. (1969)Abacklogging model and amultiechelon model of a dynamic economic lot size production system-a network approach. Management Science, 15(9), 506-527.
-
(1969)
Management Science
, vol.15
, Issue.9
, pp. 506-527
-
-
Zangwill, W.I.1
|