-
1
-
-
2542640865
-
A solution to the unit-commitment problem using integer-coded genetic algorithm
-
May
-
Ioannis G. Damousis, Anastasios G. Bakirtzis, and Perros S. Dokopoulos"A Solution to the Unit-Commitment Problem Using Integer-Coded Genetic Algorithm" IEEE transaction on power systems, vol.19, no.2, May 2004
-
(2004)
IEEE Transaction on Power Systems
, vol.19
, Issue.2
-
-
Damousis, I.G.1
Bakirtzis, A.G.2
Dokopoulos, P.S.3
-
2
-
-
0036474326
-
Unit commitment solution methodology using genetic algorithm
-
February
-
K. S. Swarup and S. Yamashiro "Unit Commitment Solution Methodology Using Genetic Algorithm" IEEE transaction on power systems ,vol 17, no.1, February 2002
-
(2002)
IEEE Transaction on Power Systems
, vol.17
, Issue.1
-
-
Swarup, K.S.1
Yamashiro, S.2
-
3
-
-
76249119705
-
Heuristics-based evolutionary algorithm for solving unit commitment and dispatch, Evolutionary Computation
-
Sept.
-
Srinivasan, D.; Chazelas, J."Heuristics-based evolutionary algorithm for solving unit commitment and dispatch, Evolutionary Computation" 2005. The 2005 IEEE Congress on Volume2, 2-5 Sept.
-
(2005)
The 2005 IEEE Congress on
, vol.2
, pp. 2-5
-
-
Srinivasan, D.1
Chazelas, J.2
-
4
-
-
33847666075
-
Reliability constrained unit commitment using simulated annealing
-
Nov
-
Simopoulos, D.N.; Kavatza, S.D. "Vournas, C.D., Reliability Constrained Unit Commitment Using Simulated Annealing" Power Systems, IEEE Transactions on Vol21, Issue 4, Nov. 2006
-
(2006)
Power Systems, IEEE Transactions on
, vol.21
, Issue.4
-
-
Simopoulos, D.N.1
Kavatza, S.D.2
Vournas, C.D.3
-
5
-
-
24944563890
-
Security-constrained unit commitment with ac constraints
-
august
-
Yong Fu, Mohammad Shahidehpour and Zuyi Li, ",Security-Constrained Unit Commitment With AC Constraints" IEEE transaction on power systems, vol.20, no.3, august 2005
-
(2005)
IEEE Transaction on Power Systems
, vol.20
, Issue.3
-
-
Fu, Y.1
Shahidehpour, M.2
Li, Z.3
-
6
-
-
42549147868
-
Improved merit order and augmented lagrange hopfield network for ramp rate and transmission constrained unit commitment
-
2007 .IEEE 24-28 June
-
Dieu, Vo Ngoc; Ongsakul, Weerakorn " Improved Merit Order and Augmented Lagrange Hopfield Network for Ramp Rate and Transmission Constrained Unit Commitment" Power Engineering Society General Meeting.2007 .IEEE 24-28 June 2007
-
(2007)
Power Engineering Society General Meeting.
-
-
Dieu, V.N.1
Ongsakul, W.2
-
8
-
-
23244459531
-
Unit commitment by a tabu-search-based hybrid-optimisation technique Generation
-
8 July
-
Victoire, T.A.A.; Jeyakumar, A.E."Unit commitment by a tabu-search-based hybrid-optimisation technique Generation" Transmission and Distribution, IEE Proceedings-Vol. 152, Issue 4, 8 July 2005.
-
(2005)
Transmission and Distribution, IEE Proceedings
, vol.152
, Issue.4
-
-
Victoire, T.A.A.1
Jeyakumar, A.E.2
-
9
-
-
33747623533
-
A computationally efficient mixed-integer linear formulation for the thermal unit commitment problem
-
Aug.
-
Carrion, M.; Arroyo, J.M."A computationally efficient mixed-integer linear formulation for the thermal unit commitment problem" Power Vol21, Issue 3, Aug. 2006.
-
(2006)
Power
, vol.21
, Issue.3
-
-
Carrion, M.1
Arroyo, J.M.2
-
10
-
-
76249094094
-
Dynamic ramping in unit commitment power systems
-
Aug.
-
Tao Li; Shahidehpour, M."Dynamic Ramping in Unit Commitment Power Systems" IEEE Transactions on Volume22, Issue 3, Aug. 2007
-
(2007)
IEEE Transactions on
, vol.22
, Issue.3
-
-
Li, T.1
Shahidehpour, M.2
-
11
-
-
63049106609
-
An improved integer coded genetic algorithm for security constrained unit commitment problem
-
2nd IEEE International Conference on Power and Energy Conf., 10.1109/PECon 08.4762668
-
S. Golestani, M. Raoofat and E. farjah "An Improved Integer Coded Genetic Algorithm for Security Constrained Unit Commitment Problem" in Malaysia. 2008 2nd IEEE International Conference on Power and Energy Conf., 10.1109/PECon 08.4762668
-
(2008)
Malaysia.
-
-
Golestani, S.1
Raoofat, M.2
Farjah, E.3
|