-
2
-
-
74849114720
-
-
Chinese source
-
2006.
-
(2006)
-
-
-
3
-
-
3242767413
-
Monte-Carlo simulation to adequacy evaluation for large scale power generation and transmission system
-
Song Yunting, Guo Yongji, Cheng Lin. Monte-Carlo simulation to adequacy evaluation for large scale power generation and transmission system [J]. Power System Technology, 2003, 27 (8): 24-28.
-
(2003)
Power System Technology
, vol.27
, Issue.8
, pp. 24-28
-
-
Song, Y.1
Guo, Y.2
Cheng, L.3
-
4
-
-
2542488603
-
A sequential Monte-Carlo simulation based reliability evaluation model for distribution network
-
Ding Ming, Zhang Jing, Li Shenghu. A sequential Monte-Carlo simulation based reliability evaluation model for distribution network [J]. Power System Technology, 2004, 28 (3): 38-42.
-
(2004)
Power System Technology
, vol.28
, Issue.3
, pp. 38-42
-
-
Ding, M.1
Zhang, J.2
Li, S.3
-
5
-
-
40449135102
-
Application of Markov chain Monte Carlo in large-scale system reliability evaluation
-
Shi Wenhui, Bie Zhaohong, Wang Xifan. Application of Markov chain Monte Carlo in large-scale system reliability evaluation [J]. Proceedings of the CSEE, 2008, 28 (4): 9-15.
-
(2008)
Proceedings of the CSEE
, vol.28
, Issue.4
, pp. 9-15
-
-
Shi, W.1
Bie, Z.2
Wang, X.3
-
6
-
-
33845538008
-
The parallel Monte-Carlo simulation of bulk power system reliability evaluation based on Beowulf cluster
-
Liu Yang, Zhou Jiaqi, Xie Kaigui. The parallel Monte-Carlo simulation of bulk power system reliability evaluation based on Beowulf cluster [J]. Proceedings of the CSEE, 2006, 26 (20): 9-14.
-
(2006)
Proceedings of the CSEE
, vol.26
, Issue.20
, pp. 9-14
-
-
Liu, Y.1
Zhou, J.2
Xie, K.3
-
7
-
-
33244490490
-
Delivery point reliability indices of a bulk electric system using sequential Monte Carlo simulation
-
Billinton R, Wangdee W. Delivery point reliability indices of a bulk electric system using sequential Monte Carlo simulation [J]. IEEE Trans. on Power Systems, 2006, 21 (1): 345-351.
-
(2006)
IEEE Trans. on Power Systems
, vol.21
, Issue.1
, pp. 345-351
-
-
Billinton, R.1
Wangdee, W.2
-
8
-
-
32144438122
-
Bulk electric system well-being analysis using sequential Monte Carlo simulation
-
Wangdee W, Billinton R. Bulk electric system well-being analysis using sequential Monte Carlo simulation [J]. IEEE Transactions on Power Systems, 2006, 21 (1): 188-193.
-
(2006)
IEEE Transactions on Power Systems
, vol.21
, Issue.1
, pp. 188-193
-
-
Wangdee, W.1
Billinton, R.2
-
9
-
-
33645729973
-
Predicting bulk electricity system reliability performance indices using sequential Monte Carlo simulation
-
Billinton R, Wangdee W. Predicting bulk electricity system reliability performance indices using sequential Monte Carlo simulation [J]. IEEE Transactions on Power Delivery, 2006, 21 (2): 909-917.
-
(2006)
IEEE Transactions on Power Delivery
, vol.21
, Issue.2
, pp. 909-917
-
-
Billinton, R.1
Wangdee, W.2
-
10
-
-
26244457624
-
Impact of utilising sequential and nonsequential simulation techniques in bulk-electric-system reliability assessment
-
Billinton R, Wangdee W. Impact of utilising sequential and nonsequential simulation techniques in bulk-electric-system reliability assessment [J]. IEE Proceedings of Generation, Transmission and Distribution, 2005, 152 (5): 623-628.
-
(2005)
IEE Proceedings of Generation, Transmission and Distribution
, vol.152
, Issue.5
, pp. 623-628
-
-
Billinton, R.1
Wangdee, W.2
-
11
-
-
33751104225
-
Design and implementation of HPC platform for bulk power system reliability evaluation
-
Liu Yang, Xie Kaigui, Zhou Jiaqi. Design and implementation of HPC platform for bulk power system reliability evaluation [J]. Automation of Electric Power Systems, 2006, 30 (18): 89-93.
-
(2006)
Automation of Electric Power Systems
, vol.30
, Issue.18
, pp. 89-93
-
-
Liu, Y.1
Xie, K.2
Zhou, J.3
-
12
-
-
42449094240
-
Relia-bility assessment of bulk power systems utilizing sequential simulation and nonparametric kernel density estimation
-
Zhao Yuan, Shen Zhijian, Zhou Niancheng. Relia-bility assessment of bulk power systems utilizing sequential simulation and nonparametric kernel density estimation [J]. Automation of Electric Power Systems, 2008, 32 (6): 14-19.
-
(2008)
Automation of Electric Power Systems
, vol.32
, Issue.6
, pp. 14-19
-
-
Zhao, Y.1
Shen, Z.2
Zhou, N.3
-
13
-
-
0024719222
-
A reliability test system for educational purposes-basic data
-
Billinton R, Kumar S N, Chowdhury N, et al. A reliability test system for educational purposes-basic data [J]. IEEE Trans. on Power Systems, 1989, 4 (3): 1238-1244.
-
(1989)
IEEE Trans. on Power Systems
, vol.4
, Issue.3
, pp. 1238-1244
-
-
Billinton, R.1
Kumar, S.N.2
Chowdhury, N.3
-
14
-
-
0018544097
-
IEEE reliability test system
-
IEEE Subcommittee
-
IEEE Subcommittee. IEEE reliability test system [J]. IEEE Trans. on Power Apparatus and Systems, 1979, PAS-98 (6): 2047-2054.
-
(1979)
IEEE Trans. on Power Apparatus and Systems
, vol.PAS-98
, Issue.6
, pp. 2047-2054
-
-
-
15
-
-
0032592961
-
The IEEE reliability test system-1996
-
IEEE Subcommittee
-
IEEE Subcommittee. The IEEE reliability test system-1996 [J]. IEEE Trans. on Power Systems, 1999, 14 (3): 1010-1020.
-
(1999)
IEEE Trans. on Power Systems
, vol.14
, Issue.3
, pp. 1010-1020
-
-
-
16
-
-
3142663460
-
Research of the optimal load shedding model in the composite generation and transmission system reliability evaluation
-
Zhao Yuan, Zhou Jiaqi. Research of the optimal load shedding model in the composite generation and transmission system reliability evaluation [J]. Power System Technology, 2004, 28 (10): 34-37.
-
(2004)
Power System Technology
, vol.28
, Issue.10
, pp. 34-37
-
-
Zhao, Y.1
Zhou, J.2
|