-
1
-
-
85009314513
-
-
Chinese source
-
-
-
-
3
-
-
0031100281
-
Application of sequential monte carlo simulation to evaluation of distributions of composite system indics
-
Billinton R, Jonnavithula A. Application of sequential monte carlo simulation to evaluation of distributions of composite system indics [J]. IEE Proceedings, Gener. Transm Distrib, 1997, 144 (2): 87-90.
-
(1997)
IEE Proceedings, Gener. Transm Distrib
, vol.144
, Issue.2
, pp. 87-90
-
-
Billinton, R.1
Jonnavithula, A.2
-
4
-
-
3242767413
-
Monte-Carlo simulation to adequacy evaluation for large-scale power generation and transmission system
-
in Chinese
-
Song Yunting, Guo Yongji, Cheng Lin. Monte-Carlo simulation to adequacy evaluation for large-scale power generation and transmission system [J]. Power System Technology, 2003, 27 (8): 24-28 (in Chinese).
-
(2003)
Power System Technology
, vol.27
, Issue.8
, pp. 24-28
-
-
Song, Y.1
Guo, Y.2
Cheng, L.3
-
5
-
-
0034335195
-
The evaluation method of fuzzy reliability in electric power network planning
-
in Chinese
-
Zhang Yan. The evaluation method of fuzzy reliability in electric power network planning [J]. Proceedings of the CSEE, 2000, 20 (11): 77-80 (in Chinese).
-
(2000)
Proceedings of the CSEE
, vol.20
, Issue.11
, pp. 77-80
-
-
Zhang, Y.1
-
6
-
-
0029354288
-
Sequential monte carlo simulation for composite power systems reliability analysis with time varying loads
-
Sankarakrishnan A, Billinton R. Sequential Monte Carlo simulation for composite power systems reliability analysis with time varying loads [J]. IEEE Transactions on Power Systems, 1995, 10 (8): 1540-1545.
-
(1995)
IEEE Transactions on Power Systems
, vol.10
, Issue.8
, pp. 1540-1545
-
-
Sankarakrishnan, A.1
Billinton, R.2
-
7
-
-
33645437051
-
Monte-Carlo simulation of reliability evaluation for composite generation and transmission system
-
in Chinese
-
Ding Ming, Zhang Ruihua. Monte-Carlo simulation of reliability evaluation for composite generation and transmission system [J]. Power System Technology, 2000, 24 (3): 9-12 (in Chinese).
-
(2000)
Power System Technology
, vol.24
, Issue.3
, pp. 9-12
-
-
Ding, M.1
Zhang, R.2
-
8
-
-
0024860930
-
Converting an existing computer code to a hypercube computer
-
USA, Seattle, WA
-
Boratynskar Stadnicka D J, Lauby M G, J Van Ness. Converting an existing computer code to a hypercube computer [C]. Proceedings of the IEEE Power Industry Computer Application Conference, USA, Seattle, WA, 1989: 394-399.
-
(1989)
Proceedings of the IEEE Power Industry Computer Application Conference
, pp. 394-399
-
-
Boratynskar, S.D.J.1
Lauby, M.G.2
Van Ness, J.3
-
9
-
-
0029305485
-
Models and considerations for parallel implementation of monte carlo simulation methods for power system reliability evaluation
-
Gubbala N, Singh C. Models and considerations for parallel implementation of Monte Carlo simulation methods for power system reliability evaluation [J]. IEEE Trans. on Power Systems, 1995, 10 (2): 779-787.
-
(1995)
IEEE Trans. on Power Systems
, vol.10
, Issue.2
, pp. 779-787
-
-
Gubbala, N.1
Singh, C.2
-
10
-
-
0035341046
-
Composite reliability evaluation by sequential monte carlo simulation on parallel and distributed processing environments
-
CarMen L T Borges, Djalma M Falcao. Composite reliability evaluation by sequential monte carlo simulation on parallel and distributed processing environments [J]. IEEE Transactions on Power System, 2001, 16 (2): 203-209.
-
(2001)
IEEE Transactions on Power System
, vol.16
, Issue.2
, pp. 203-209
-
-
Borges, C.L.T.1
Falcao, D.M.2
-
12
-
-
85009324392
-
-
Chinese source
-
-
-
-
13
-
-
85009309735
-
-
Chinese source
-
-
-
|