Volumn 60, Issue , 1999, Pages 537-547

Single machine scheduling to meet due times under shutdown constraints

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; CONSTRAINT THEORY; COSTS; HEURISTIC METHODS; JOB ANALYSIS; TIME AND MOTION STUDY; WORK-REST SCHEDULES;

EID: 0032628442     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0925-5273(98)00130-3     Document Type: Article
Times cited : (6)

References (6)
  • 1
    • 0023977809 scopus 로고
    • Single machine scheduling to minimize weighted earliness subject to no tardy jobs
    • S. Chand, H. Schneerberger, Single machine scheduling to minimize weighted earliness subject to no tardy jobs, European Journal of Operational Research 34 (2) (1988) 221-230.
    • (1988) European Journal of Operational Research , vol.34 , Issue.2 , pp. 221-230
    • Chand, S.1    Schneerberger, H.2
  • 2
    • 0009314358 scopus 로고
    • Backward scheduling to minimize the actual mean flow time with dependent and independent setup times
    • Cincinnati
    • S. Miyazaki, H. Ohta, Backward scheduling to minimize the actual mean flow time with dependent and independent setup times, Proceedings of the 6th International Conference on Production Research, Cincinnati, 1987, pp. 2680-2686.
    • (1987) Proceedings of the 6th International Conference on Production Research , pp. 2680-2686
    • Miyazaki, S.1    Ohta, H.2
  • 3
    • 0030170675 scopus 로고    scopus 로고
    • Single machine scheduling using dominance relation to minimize earliness subject to ready and due times
    • M. Asano, H. Ohta, Single machine scheduling using dominance relation to minimize earliness subject to ready and due times, International Journal of Production Economics 44 (1-2) (1996) 35-43.
    • (1996) International Journal of Production Economics , vol.44 , Issue.1-2 , pp. 35-43
    • Asano, M.1    Ohta, H.2
  • 4
    • 0026818026 scopus 로고
    • On scheduling with ready-times, due-dates and vacations
    • V.J. Leon, S.D. Wu, On scheduling with ready-times, due-dates and vacations, Naval Research Logistics 39 (1) (1992) 53-65.
    • (1992) Naval Research Logistics , vol.39 , Issue.1 , pp. 53-65
    • Leon, V.J.1    Wu, S.D.2
  • 6
    • 0001526391 scopus 로고
    • An improved implicit enumeration approach for integer programming
    • A.M. Geoffrion, An improved implicit enumeration approach for integer programming, Operations Research 17 (3) (1969) 437-454.
    • (1969) Operations Research , vol.17 , Issue.3 , pp. 437-454
    • Geoffrion, A.M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.