-
3
-
-
0003276672
-
Uncertainty modelling in civil engineering with structural and reliability applications
-
B. M. Ayyub, ed., CRC, Boca Raton, Fla.
-
Ayyub, B. M. and Chao, R. J. (1998). " Uncertainty modelling in civil engineering with structural and reliability applications.." Uncertainty modelling and analysis in civil engineering, B. M. Ayyub, ed., CRC, Boca Raton, Fla., 3-32.
-
(1998)
Uncertainty Modelling and Analysis in Civil Engineering
, pp. 3-32
-
-
Ayyub, B.M.1
Chao, R.J.2
-
4
-
-
0002554419
-
Financial ratios as predictors of failure
-
0021-8456. 10.2307/2490171
-
Beaver, W. H. (1966). " Financial ratios as predictors of failure.." J. Account. Res. 0021-8456, 4, 71-102. 10.2307/2490171
-
(1966)
J. Account. Res.
, vol.4
, pp. 71-102
-
-
Beaver, W.H.1
-
5
-
-
0031049598
-
Deciding advantageously before knowing the advantageous strategy
-
DOI 10.1126/science.275.5304.1293
-
Bechara, A., Damasio, H., Tranel, D., and Damasio, A. R. (1997). " Deciding advantageously before knowing the advantageous strategy.." Science 0036-8075, 275 (5304), 1293-1294. 10.1126/science.275.5304.1293 (Pubitemid 27114154)
-
(1997)
Science
, vol.275
, Issue.5304
, pp. 1293-1295
-
-
Bechara, A.1
Damasio, H.2
Tranel, D.3
Damasio, A.R.4
-
6
-
-
0030173778
-
A new framework for determining critical success/failure factors in projects
-
DOI 10.1016/0263-7863(95)00064-X
-
Belassi, W., and Tukel, O. I. (1996). " A new framework for determining critical success/failure factors in projects.." Int. J. Proj. Manage. 0263-7863, 14 (3), 141-151. 10.1016/0263-7863(95)00064-X (Pubitemid 126397312)
-
(1996)
International Journal of Project Management
, vol.14
, Issue.3
, pp. 141-151
-
-
Belassi, W.1
Tukel, O.I.2
-
8
-
-
13944265046
-
Factors affecting the success of a construction project
-
DOI 10.1061/(ASCE)0733-9364(2004)130:1(153)
-
Chan, A. P. C., Scott, D., and Chan, A. P. L. (2004). " Factors affecting the success of a construction project.." J. Constr. Eng. Manage. 0733-9364, 130 (1), 153-155. 10.1061/(ASCE)0733-9364(2004)130:1(153) (Pubitemid 40265416)
-
(2004)
Journal of Construction Engineering and Management
, vol.130
, Issue.1
, pp. 153-155
-
-
Chan, A.P.C.1
Scott, D.2
Chan, A.P.L.3
-
9
-
-
16444375325
-
Optimum bid markup calculation using neurofuzzy systems and multidimensional risk analysis algorithm
-
DOI 10.1061/(ASCE)0887-3801(2004)18:4(322)
-
Christodoulou, S. (2004). " Optimum bid markup calculation using neurofuzzy systems and multidimensional risk analysis algorithm.." J. Comput. Civ. Eng. 0887-3801, 18 (4), 322-330. 10.1061/(ASCE)0887-3801(2004)18: 4(322) (Pubitemid 40475406)
-
(2004)
Journal of Computing in Civil Engineering
, vol.18
, Issue.4
, pp. 322-330
-
-
Christodoulou, S.1
-
10
-
-
0005248282
-
A comparative analysis of inductive-learning algorithms
-
1055-615X
-
Chung, H. M., and Tam, K. Y. (1993). " A comparative analysis of inductive-learning algorithms.." Int. J. Intell. Syst. Account. Finance Manage., 2 (1), 3-18. 1055-615X
-
(1993)
Int. J. Intell. Syst. Account. Finance Manage.
, vol.2
, Issue.1
, pp. 3-18
-
-
Chung, H.M.1
Tam, K.Y.2
-
13
-
-
0036722595
-
A decision support system specification for cost escalation in heavy engineering industry
-
1093-9687. 10.1111/1467-8667.00281
-
Dawood, N. N., and Bates, W. (2002). " A decision support system specification for cost escalation in heavy engineering industry.." Comput. Aided Civ. Infrastruct. Eng. 1093-9687, 17 (5), 342-357. 10.1111/1467-8667.00281
-
(2002)
Comput. Aided Civ. Infrastruct. Eng.
, vol.17
, Issue.5
, pp. 342-357
-
-
Dawood, N.N.1
Bates, W.2
-
14
-
-
84933493212
-
Multiple criteria decision making, multiattribute utility theory: The next ten years
-
0025-1909. 10.1287/mnsc.38.5.645
-
Dyer, J. S., Fishburn, P. C., Steuer, R. E., Wallenius, J., and Zionts, S. (1992). " Multiple criteria decision making, multiattribute utility theory: The next ten years.." Manage. Sci. 0025-1909, 38 (5), 645-654. 10.1287/mnsc.38.5.645
-
(1992)
Manage. Sci.
, vol.38
, Issue.5
, pp. 645-654
-
-
Dyer, J.S.1
Fishburn, P.C.2
Steuer, R.E.3
Wallenius, J.4
Zionts, S.5
-
16
-
-
0344992524
-
Risk and risk management in construction projects: Concepts, terms and risk categories re-defined
-
1358-9180
-
Edwards, P. J., and Bowen, P. A. (2000). " Risk and risk management in construction projects: Concepts, terms and risk categories re-defined.." J. Constr. Procure. 1358-9180, 5 (1), 42-57.
-
(2000)
J. Constr. Procure.
, vol.5
, Issue.1
, pp. 42-57
-
-
Edwards, P.J.1
Bowen, P.A.2
-
17
-
-
73349116963
-
-
The Government of the Hong Kong Special Administrative Region (HKSAR). Environment, Transport and Works Bureau, (Dec. 12, 2006)
-
The Government of the Hong Kong Special Administrative Region (HKSAR). (2003) " List of approved contractors for public works (online).." Environment, Transport and Works Bureau, 〈 http://www.etwb.gov.hk/ consultants-and-contractors/ 〉 (Dec. 12, 2006).
-
(2003)
List of Approved Contractors for Public Works (Online)
-
-
-
18
-
-
0028330587
-
Analogy-based solution to markup estimation problem
-
0887-3801. 10.1061/(ASCE)0887-3801(1994)8:1(72)
-
Hegazy, T., and Moselhi, O. (1994). " Analogy-based solution to markup estimation problem.." J. Comput. Civ. Eng. 0887-3801, 8 (1), 72-87. 10.1061/(ASCE)0887-3801(1994)8:1(72)
-
(1994)
J. Comput. Civ. Eng.
, vol.8
, Issue.1
, pp. 72-87
-
-
Hegazy, T.1
Moselhi, O.2
-
19
-
-
1842484493
-
Genetic algorithm for optimization of infrastructure investment under time-resource constraints
-
DOI 10.1111/j.1467-8667.2004.00348.x
-
Hsieh, T. -Y., and Liu, H. -L. (2004). " Genetic algorithm for optimization of infrastructure investment under time-resource constraints.." Comput. Aided Civ. Infrastruct. Eng. 1093-9687, 19 (3), 203-212. 10.1111/j.1467-8667.2004.00348.x (Pubitemid 38439236)
-
(2004)
Computer-Aided Civil and Infrastructure Engineering
, vol.19
, Issue.3
, pp. 203-212
-
-
Hsieh, T.-Y.1
Liu, H.-L.2
-
20
-
-
0036642995
-
Model on cash flow forecasting and risk analysis for contracting firms
-
DOI 10.1016/S0263-7863(01)00037-0, PII S0263786301000370
-
Hwee, N. G., and Tiong, R. L. K. (2002). " Model on cash flow forecasting and risk analysis for contracting firms.." Int. J. Proj. Manage. 0263-7863, 20 (5), 351-363. 10.1016/S0263-7863(01)00037-0 (Pubitemid 34412500)
-
(2002)
International Journal of Project Management
, vol.20
, Issue.5
, pp. 351-363
-
-
Ng, G.H.1
Tiong, R.L.K.2
-
21
-
-
49649138413
-
Subjective probability: A judgment of representativeness
-
1895-1171. 10.1016/0010-0285(72)90016-3
-
Kahneman, D., and Tversky, A. (1972). " Subjective probability: A judgment of representativeness.." Adv. Cognit. Psychol. 1895-1171, 3 (3), 430-454. 10.1016/0010-0285(72)90016-3
-
(1972)
Adv. Cognit. Psychol.
, vol.3
, Issue.3
, pp. 430-454
-
-
Kahneman, D.1
Tversky, A.2
-
23
-
-
0004001439
-
-
Wiley, New York
-
Kenney, R., and Raifa, H. (1976). Decision with multiple objectives, preferences and value trade offs, Wiley, New York.
-
(1976)
Decision with Multiple Objectives, Preferences and Value Trade Offs
-
-
Kenney, R.1
Raifa, H.2
-
24
-
-
33646409548
-
Capital budgeting evaluation practices of building contractors in Hong Kong
-
1445-2634
-
Lam, K. C., Cheung, S. O., Tang, C. M., and Ng, T. S. (2002). " Capital budgeting evaluation practices of building contractors in Hong Kong.." Aust. J. Constr. Econ. Build. 1445-2634, 2 (1), 81-93.
-
(2002)
Aust. J. Constr. Econ. Build.
, vol.2
, Issue.1
, pp. 81-93
-
-
Lam, K.C.1
Cheung, S.O.2
Tang, C.M.3
Ng, T.S.4
-
25
-
-
0001276267
-
Modelling financial decisions in construction firms
-
10.1080/014461999371204 0144-6193
-
Lam, K. C., and Runeson, G. (1999). " Modelling financial decisions in construction firms.." Construct. Manag. Econ., 17 (5), 589-602. 10.1080/014461999371204 0144-6193
-
(1999)
Construct. Manag. Econ.
, vol.17
, Issue.5
, pp. 589-602
-
-
Lam, K.C.1
Runeson, G.2
-
26
-
-
25844517320
-
Using the principal component analysis method as a tool in contractor pre-qualification
-
DOI 10.1080/01446190500041263
-
Lam, K. C., Tang, C. M., and Lee, W. C. (2005). " Application of the entropy technique and genetic algorithms to construction site layout planning of medium-size projects.." Construct. Manag. Econ., 23 (2), 127-175. 10.1080/01446190500041263 0144-6193 (Pubitemid 41388507)
-
(2005)
Construction Management and Economics
, vol.23
, Issue.7
, pp. 673-684
-
-
Lam, K.C.1
Hu, T.S.2
Ng, S.T.3
-
27
-
-
23244439235
-
Formulating procurement selection criteria through case-based reasoning approach
-
DOI 10.1061/(ASCE)0887-3801(2005)19:3(269)
-
Luu, D. T., Ng, S. T., and Chen, S. E. (2005). " Formulating procurement selection criteria through case-based reasoning approach.." J. Comput. Civ. Eng. 0887-3801, 19 (3), 269-276. 10.1061/(ASCE)0887-3801(2005)19: 3(269) (Pubitemid 41092939)
-
(2005)
Journal of Computing in Civil Engineering
, vol.19
, Issue.3
, pp. 269-276
-
-
Luu, D.T.1
Ng, S.T.2
Chen, S.E.3
-
28
-
-
0006581390
-
-
Euromoney Publications, London
-
Nevitt, P. (1983). Project financing, Euromoney Publications, London.
-
(1983)
Project Financing
-
-
Nevitt, P.1
-
29
-
-
20544431718
-
Judgmental risk analysis process development in construction projects
-
DOI 10.1016/j.buildenv.2004.10.013, PII S0360132304003191
-
Öztas, A., and Ökmen, O. (2005). " Judgmental risk analysis process development in construction projects.." Build. Environ. 0360-1323, 40 (9), 1244-1254. 10.1016/j.buildenv.2004.10.013 (Pubitemid 40841163)
-
(2005)
Building and Environment
, vol.40
, Issue.9
, pp. 1244-1254
-
-
Oztas, A.1
Okmen, O.2
-
30
-
-
0022080070
-
Risks and its management in construction projects
-
0887-3801
-
Perry, J. G., and Hayes, R. W. (1985). " Risks and its management in construction projects.." Proc. Inst. Civ. Eng., 78 (1), 499-521. 0887-3801
-
(1985)
Proc. Inst. Civ. Eng.
, vol.78
, Issue.1
, pp. 499-521
-
-
Perry, J.G.1
Hayes, R.W.2
-
35
-
-
0033692230
-
Comparison of neural and conventional approaches to mode choice analysis
-
DOI 10.1061/(ASCE)0887-3801(2000)14:1(23)
-
Sayed, T., and Razavi, A. (2000). " Comparison of neural and conventional approaches to mode choice analysis.." J. Comput. Civ. Eng. 0887-3801, 14 (1), 23-30. 10.1061/(ASCE)0887-3801(2000)14:1(23) (Pubitemid 30894056)
-
(2000)
Journal of Computing in Civil Engineering
, vol.14
, Issue.1
, pp. 23-30
-
-
Sayed, T.1
Razavi, A.2
-
36
-
-
84856043672
-
A mathematical theory of communication
-
0005-8580
-
Shannon, C. E. (1948). " A mathematical theory of communication.." Bell Syst. Tech. J. 0005-8580, 27, 379-423.
-
(1948)
Bell Syst. Tech. J.
, vol.27
, pp. 379-423
-
-
Shannon, C.E.1
-
37
-
-
73349107866
-
Using genetic algorithms to support case-based reasoning: Application to corporate bond rating
-
Decision Sciences Institute, Taipei
-
Shin, K. S., and Han, I. (1998). " Using genetic algorithms to support case-based reasoning: Application to corporate bond rating.." Proc., 2nd Asia-Pacific Decision Sciences Institute Conf., Decision Sciences Institute, Taipei, 341-44.
-
(1998)
Proc., 2nd Asia-Pacific Decision Sciences Institute Conf.
, pp. 341-44
-
-
Shin, K.S.1
Han, I.2
-
38
-
-
0038604047
-
Forecast models for actual construction time and cost
-
DOI 10.1016/S0360-1323(03)00067-2
-
Skitmore, R. M., and Ng, S. T. (2003). " Forecast models for actual construction time and cost.." Build. Environ. 0360-1323, 38 (8), 1075-1083. 10.1016/S0360-1323(03)00067-2 (Pubitemid 36832716)
-
(2003)
Building and Environment
, vol.38
, Issue.8
, pp. 1075-1083
-
-
Skitmore, R.M.1
Ng, S.T.2
-
39
-
-
0003669326
-
-
Prentice-Hall, Englewood Cliffs, N.J.
-
Sprague, R. H., and Carlson, E. D. (1982). Building effective decision support systems, Prentice-Hall, Englewood Cliffs, N.J.
-
(1982)
Building Effective Decision Support Systems
-
-
Sprague, R.H.1
Carlson, E.D.2
-
40
-
-
38249003915
-
Contractor project risks contingency allocation using linguistic approximation
-
0956-0521. 10.1016/0956-0521(93)90052-X
-
Tah, J. H. M., Thrope, A., and McCaffer, R. (1993). " Contractor project risks contingency allocation using linguistic approximation.." Comput. Syst. Eng. 0956-0521, 4 (2-3), 281-293. 10.1016/0956-0521(93)90052-X
-
(1993)
Comput. Syst. Eng.
, vol.4
, Issue.23
, pp. 281-293
-
-
Tah, J.H.M.1
Thrope, A.2
McCaffer, R.3
-
41
-
-
68049120612
-
An entropy-based financial decision support system (e-FDSS) for project analysis in construction SMEs
-
0144-6193. 10.1080/01446190902883049
-
Tang, L. C. M., and Leung, A. Y. T. (2009). " An entropy-based financial decision support system (e-FDSS) for project analysis in construction SMEs.." Construct. Manag. Econ. 0144-6193, 27 (5), 499-513. 10.1080/01446190902883049
-
(2009)
Construct. Manag. Econ.
, vol.27
, Issue.5
, pp. 499-513
-
-
Tang, L.C.M.1
Leung, A.Y.T.2
-
42
-
-
33748761652
-
Entropy application to improve construction finance decisions
-
DOI 10.1061/(ASCE)0733-9364(2006)132:10(1099)
-
Tang, C. M., Leung, A. Y. T., and Lam, K. C. (2006a). " An entropy application to improve construction finance decisions.." J. Constr. Eng. Manage. 0733-9364, 132 (10), 1099-1013. 10.1061/(ASCE)0733-9364(2006)132: 10(1099) (Pubitemid 44410236)
-
(2006)
Journal of Construction Engineering and Management
, vol.132
, Issue.10
, pp. 1099-1113
-
-
Tang, C.M.1
Leung, A.Y.T.2
Lam, K.C.3
-
43
-
-
33646394612
-
Selection of funding schemes by a borrowing decision model: A Hong Kong case study
-
DOI 10.1080/01446190500434906, PII L22074216266
-
Tang, C. M., Wong, C. W. Y., and Leung, A. Y. T. (2006b). " Selection of funding schemes by a borrowing decision model: A Hong Kong case study.." Construct. Manag. Econ., 24 (4), 349-365. 10.1080/ 01446190500434906 0144-6193 (Pubitemid 43675236)
-
(2006)
Construction Management and Economics
, vol.24
, Issue.4
, pp. 349-365
-
-
Tang, C.M.1
Wong, C.W.Y.2
Leung, A.Y.T.3
Lam, K.C.4
-
44
-
-
34247529903
-
Availability: A heuristic for judging frequency and probability
-
1895-1171. 10.1016/0010-0285(73)90033-9
-
Tversky, A., and Kahneman, D. (1973). " Availability: A heuristic for judging frequency and probability.." Adv. Cognit. Psychol. 1895-1171, 5 (2), 677-695. 10.1016/0010-0285(73)90033-9
-
(1973)
Adv. Cognit. Psychol.
, vol.5
, Issue.2
, pp. 677-695
-
-
Tversky, A.1
Kahneman, D.2
-
45
-
-
33846818747
-
Integration of simulation-based cost model and multi-criteria evaluation model for bid price decisions
-
DOI 10.1111/j.1467-8667.2007.00480.x, Product Models
-
Wang, W. -C., Deng, R. -J., and Lu, Y. -H. (2007). " Integration of simulation-based cost model and multi-criteria evaluation model for bid price decisions.." Comput. Aided Civ. Infrastruct. Eng. 1093-9687, 22 (3), 223-235. 10.1111/j.1467-8667.2007.00480.x (Pubitemid 46206577)
-
(2007)
Computer-Aided Civil and Infrastructure Engineering
, vol.22
, Issue.3
, pp. 223-235
-
-
Wang, W.-C.1
Dzeng, R.-J.2
Lu, Y.-H.3
-
46
-
-
0043125736
-
Parametric analysis of the financing cost in a building project
-
DOI 10.1080/0144619032000049638
-
Warszawski, A. (2003). " Parametric analysis of the financing cost in a building project.." Construct. Manag. Econ., 21 (5), 447-459. 10.1080/0144619032000049638 0144-6193 (Pubitemid 36967868)
-
(2003)
Construction Management and Economics
, vol.21
, Issue.5
, pp. 447-459
-
-
Warszawski, A.1
-
47
-
-
0025503588
-
Risks, classification of estimates, and contingency management
-
0742-597X. 10.1061/(ASCE)9742-597X(1990)6:4(458)
-
Yeo, K. T. (1990). " Risks, classification of estimates, and contingency management.." J. Manage. Eng. 0742-597X, 6 (4), 458-470. 10.1061/(ASCE)9742-597X(1990)6:4(458)
-
(1990)
J. Manage. Eng.
, vol.6
, Issue.4
, pp. 458-470
-
-
Yeo, K.T.1
-
50
-
-
0033343564
-
Multicriteria decision aid in financial management
-
DOI 10.1016/S0377-2217(99)00142-3
-
Zopounidis, C. (1999). " Multicriteria decision aid in financial management.." Eur. J. Oper. Res. 0377-2217, 119 (2), 404-415. 10.1016/S0377-2217(99)00142-3 (Pubitemid 30518396)
-
(1999)
European Journal of Operational Research
, vol.119
, Issue.2
, pp. 404-415
-
-
Zopounidis, C.1
|