메뉴 건너뛰기




Volumn 21, Issue 5, 2003, Pages 447-459

Parametric analysis of the financing cost in a building project

Author keywords

Construction; Construction loan; Construction project; Credit line; Financing; Loan

Indexed keywords

COSTS; DECISION MAKING; SALES;

EID: 0043125736     PISSN: 01446193     EISSN: None     Source Type: Journal    
DOI: 10.1080/0144619032000049638     Document Type: Article
Times cited : (9)

References (9)
  • 5
    • 0029532895 scopus 로고
    • Debt capacity and optimal capital structure for privately financed infrastructure projects
    • ASCE
    • Dias, A. and Ioannou, P.G. (1995) Debt capacity and optimal capital structure for privately financed infrastructure projects. Journal of Construction Engineering and Management, ASCE, 121(4), 404-414.
    • (1995) Journal of Construction Engineering and Management , vol.121 , Issue.4 , pp. 404-414
    • Dias, A.1    Ioannou, P.G.2
  • 6
    • 0041545757 scopus 로고
    • Preliminary cumulative cash flow analysis
    • Gates, M. and Scarpa, A. (1979) Preliminary cumulative cash flow analysis. Cost Engineering, 21(6), 243-249.
    • (1979) Cost Engineering , vol.21 , Issue.6 , pp. 243-249
    • Gates, M.1    Scarpa, A.2
  • 8
    • 0041545758 scopus 로고    scopus 로고
    • Cash flow forecasting and updating for building projects
    • Navon, R. (1996) Cash flow forecasting and updating for building projects. Project Management Journal, 27(2), 14-23.
    • (1996) Project Management Journal , vol.27 , Issue.2 , pp. 14-23
    • Navon, R.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.