-
1
-
-
34250208764
-
Grey prediction with rolling mechanism for electricity demand forecasting of Turkey
-
Akay D., and Atak M. Grey prediction with rolling mechanism for electricity demand forecasting of Turkey. Energy 32 (2007) 1670-1675
-
(2007)
Energy
, vol.32
, pp. 1670-1675
-
-
Akay, D.1
Atak, M.2
-
2
-
-
0034291633
-
Prediction of the bulking phenomenon in wastewater treatment plants
-
Belanchea L., Valdes J., Comas J.J., Roda I.R., and Poch M. Prediction of the bulking phenomenon in wastewater treatment plants. Artificial Intelligence in Engineering 1 (2000) 307-317
-
(2000)
Artificial Intelligence in Engineering
, vol.1
, pp. 307-317
-
-
Belanchea, L.1
Valdes, J.2
Comas, J.J.3
Roda, I.R.4
Poch, M.5
-
3
-
-
0032961142
-
Towards a model of input-output behaviour of wastewater treatment plants using soft computing techniques
-
Belanche L.A., Valdes J.J., Comas J., Roda I.R., and Poch M. Towards a model of input-output behaviour of wastewater treatment plants using soft computing techniques. Environmental Modelling & Software 14 (1999) 409-419
-
(1999)
Environmental Modelling & Software
, vol.14
, pp. 409-419
-
-
Belanche, L.A.1
Valdes, J.J.2
Comas, J.3
Roda, I.R.4
Poch, M.5
-
4
-
-
0030201437
-
Time series models for forecasting wastewater treatment plant performance
-
Berthouex P.M., and Box G.E. Time series models for forecasting wastewater treatment plant performance. Water Research 30 8 (1996) 1865-1875
-
(1996)
Water Research
, vol.30
, Issue.8
, pp. 1865-1875
-
-
Berthouex, P.M.1
Box, G.E.2
-
5
-
-
36148968095
-
Forecast approach using neural network adaptation to support vector regression grey model and generalized auto-regressive conditional heteroscedasticity
-
Chang B.R., and Tsai H.F. Forecast approach using neural network adaptation to support vector regression grey model and generalized auto-regressive conditional heteroscedasticity. Expert Systems with Applications 34 (2008) 925-934
-
(2008)
Expert Systems with Applications
, vol.34
, pp. 925-934
-
-
Chang, B.R.1
Tsai, H.F.2
-
6
-
-
0034016795
-
Prediction of solid waste generation via grey fuzzy dynamic modeling
-
Chen H.W., and Chang N.B. Prediction of solid waste generation via grey fuzzy dynamic modeling. Resources Conservation and Recycling 29 (2000) 1-18
-
(2000)
Resources Conservation and Recycling
, vol.29
, pp. 1-18
-
-
Chen, H.W.1
Chang, N.B.2
-
7
-
-
50849151631
-
Control problems of grey system
-
Deng J.L. Control problems of grey system. System Control Letters 5 (1982) 285-294
-
(1982)
System Control Letters
, vol.5
, pp. 285-294
-
-
Deng, J.L.1
-
8
-
-
2642578431
-
Activated sludge wastewater treatment plant modelling and simulation: state of the art
-
Gernaey K.V., Van Loosdrecht M.C.M., Henze M., Lind M., and Jørgensen S.B. Activated sludge wastewater treatment plant modelling and simulation: state of the art. Environmental Modelling & Software 19 (2004) 763-783
-
(2004)
Environmental Modelling & Software
, vol.19
, pp. 763-783
-
-
Gernaey, K.V.1
Van Loosdrecht, M.C.M.2
Henze, M.3
Lind, M.4
Jørgensen, S.B.5
-
9
-
-
36148989970
-
Prediction of wastewater treatment plant performance based on wavelet packet decomposition and neural networks
-
Hanbay D., Turkoglu I., and Demir Y. Prediction of wastewater treatment plant performance based on wavelet packet decomposition and neural networks. Expert Systems with Applications 34 (2008) 1038-1043
-
(2008)
Expert Systems with Applications
, vol.34
, pp. 1038-1043
-
-
Hanbay, D.1
Turkoglu, I.2
Demir, Y.3
-
10
-
-
34548671821
-
Damage detection by a hybrid real-parameter genetic algorithm under the assistance of grey relation analysis
-
He R.S., and Hwang S.F. Damage detection by a hybrid real-parameter genetic algorithm under the assistance of grey relation analysis. Engineering Applications of Artificial Intelligence 20 7 (2007) 980-992
-
(2007)
Engineering Applications of Artificial Intelligence
, vol.20
, Issue.7
, pp. 980-992
-
-
He, R.S.1
Hwang, S.F.2
-
11
-
-
0037411856
-
Applications of improved grey prediction model for power demand forecasting
-
Hsu C.C., and Chen C.Y. Applications of improved grey prediction model for power demand forecasting. Energy Conversion and Management 44 (2003) 2241-2249
-
(2003)
Energy Conversion and Management
, vol.44
, pp. 2241-2249
-
-
Hsu, C.C.1
Chen, C.Y.2
-
12
-
-
18944372441
-
Parallel hybrid modeling methods for a full-scale coke wastewater treatment plant
-
Lee D.S., Vanrolleghem P.A., and Park J.M. Parallel hybrid modeling methods for a full-scale coke wastewater treatment plant. Journal of Biotechnology 115 (2005) 317-328
-
(2005)
Journal of Biotechnology
, vol.115
, pp. 317-328
-
-
Lee, D.S.1
Vanrolleghem, P.A.2
Park, J.M.3
-
13
-
-
14844297098
-
Adaptive occupancy-based lighting control via grey prediction
-
Leephakpreeda T. Adaptive occupancy-based lighting control via grey prediction. Building and Environment 40 (2005) 881-886
-
(2005)
Building and Environment
, vol.40
, pp. 881-886
-
-
Leephakpreeda, T.1
-
14
-
-
0035399773
-
Measurement point prediction of flatness geometric tolerance by using grey theory
-
Lin Z.C., and Lin W.S. Measurement point prediction of flatness geometric tolerance by using grey theory. Precision Engineering 25 (2001) 171-184
-
(2001)
Precision Engineering
, vol.25
, pp. 171-184
-
-
Lin, Z.C.1
Lin, W.S.2
-
15
-
-
2642570244
-
Fuzzy prediction of the algal blooms in the Orbetello lagoon
-
Marsili-Libelli S. Fuzzy prediction of the algal blooms in the Orbetello lagoon. Environmental Modelling and Software 19 9 (2004) 799-808
-
(2004)
Environmental Modelling and Software
, vol.19
, Issue.9
, pp. 799-808
-
-
Marsili-Libelli, S.1
-
16
-
-
33646033775
-
Application of grey model GM(1, 1) to vehicle fatality risk estimation
-
Mao M., and Chirwa E.C. Application of grey model GM(1, 1) to vehicle fatality risk estimation. Technological Forecasting & Social Change 73 (2006) 588-605
-
(2006)
Technological Forecasting & Social Change
, vol.73
, pp. 588-605
-
-
Mao, M.1
Chirwa, E.C.2
-
17
-
-
33846897687
-
Use of artificial neural network black-box modeling for the prediction of wastewater treatment plant performance
-
Mjalli F.S., Al-Asheh S., and Alfadala H.E. Use of artificial neural network black-box modeling for the prediction of wastewater treatment plant performance. Journal of Environmental Management 83 (2007) 329-338
-
(2007)
Journal of Environmental Management
, vol.83
, pp. 329-338
-
-
Mjalli, F.S.1
Al-Asheh, S.2
Alfadala, H.E.3
-
18
-
-
33749176597
-
Simulation of fuzzy multiattribute models for grey relationships
-
Olson D.L., and Wu D. Simulation of fuzzy multiattribute models for grey relationships. European Journal of Operational Research 175 1 (2006) 111-120
-
(2006)
European Journal of Operational Research
, vol.175
, Issue.1
, pp. 111-120
-
-
Olson, D.L.1
Wu, D.2
-
19
-
-
34047196801
-
Estimation of parameters in incomplete data models defined by dynamical systems
-
Sophie D., and Adeline S. Estimation of parameters in incomplete data models defined by dynamical systems. Journal of Statistical Planning and Inference 137 9 (2007) 2815-2831
-
(2007)
Journal of Statistical Planning and Inference
, vol.137
, Issue.9
, pp. 2815-2831
-
-
Sophie, D.1
Adeline, S.2
-
20
-
-
0037032155
-
The use of grey-based Taguchi methods to determine submerged arc welding process parameters in hardfacing
-
Tarng Y.S., Juang S.C., and Chang C.H. The use of grey-based Taguchi methods to determine submerged arc welding process parameters in hardfacing. Journal of Materials Processing Technology 128 (2002) 1-6
-
(2002)
Journal of Materials Processing Technology
, vol.128
, pp. 1-6
-
-
Tarng, Y.S.1
Juang, S.C.2
Chang, C.H.3
-
21
-
-
0029325631
-
State and parameter estimation for wastewater treatment processes using a stochastic model
-
Tenno R., and Uronen P. State and parameter estimation for wastewater treatment processes using a stochastic model. Control Engineering Practice 3 6 (1995) 793-804
-
(1995)
Control Engineering Practice
, vol.3
, Issue.6
, pp. 793-804
-
-
Tenno, R.1
Uronen, P.2
-
22
-
-
0032030573
-
Multivariate time series analysis for design and operation of a biological wastewater treatment plant
-
Van Dongen G., and Geuens L. Multivariate time series analysis for design and operation of a biological wastewater treatment plant. Water Research 32 3 (1998) 691-700
-
(1998)
Water Research
, vol.32
, Issue.3
, pp. 691-700
-
-
Van Dongen, G.1
Geuens, L.2
-
23
-
-
2342587536
-
Predicting tourism demand using fuzzy time series and hybrid grey theory
-
Wang C.H. Predicting tourism demand using fuzzy time series and hybrid grey theory. Tourism Management 25 3 (2004) 367-374
-
(2004)
Tourism Management
, vol.25
, Issue.3
, pp. 367-374
-
-
Wang, C.H.1
-
24
-
-
36749064932
-
Using genetic algorithms grey theory to forecast high technology industrial output
-
Wang C., and Hsu L.C. Using genetic algorithms grey theory to forecast high technology industrial output. Applied Mathematics and Computation 195 1 (2008) 256-263
-
(2008)
Applied Mathematics and Computation
, vol.195
, Issue.1
, pp. 256-263
-
-
Wang, C.1
Hsu, L.C.2
-
26
-
-
33749518238
-
Identification of pre-sliding and sliding friction dynamics: grey box and black-box models
-
Wordena K., Wong C.X., Parlitz U., Hornstein A., Engster D., Tjahjowidodo T., Al-Bender F., Rizos D.D., and Fassois S.D. Identification of pre-sliding and sliding friction dynamics: grey box and black-box models. Mechanical Systems and Signal Processing 21 (2007) 514-534
-
(2007)
Mechanical Systems and Signal Processing
, vol.21
, pp. 514-534
-
-
Wordena, K.1
Wong, C.X.2
Parlitz, U.3
Hornstein, A.4
Engster, D.5
Tjahjowidodo, T.6
Al-Bender, F.7
Rizos, D.D.8
Fassois, S.D.9
-
27
-
-
33746839289
-
A trigonometric grey prediction approach to forecasting electricity demand
-
Zhou P., Ang B.W., and Poh K.L. A trigonometric grey prediction approach to forecasting electricity demand. Energy 31 (2006) 2503-2511
-
(2006)
Energy
, vol.31
, pp. 2503-2511
-
-
Zhou, P.1
Ang, B.W.2
Poh, K.L.3
|