-
1
-
-
0033310058
-
Myopic heuristics for the random yield problem
-
Sept.-Oct
-
S. Bollapragada and T. Morton, "Myopic heuristics for the random yield problem," Oper. Res., vol. 47, no. 5, pp. 713-723, Sept.-Oct. 1999.
-
(1999)
Oper. Res.
, vol.47
, Issue.5
, pp. 713-723
-
-
Bollapragada, S.1
Morton, T.2
-
2
-
-
0001110481
-
A periodic review, production planning model with uncertain demand: Optimality of extended myopic policies
-
F. W. Ciarallo, R. Akella, and T. E. Morton, "A periodic review, production planning model with uncertain demand: optimality of extended myopic policies," Manag. Sci., vol. 40, pp. 320-332, 1994.
-
(1994)
Manag. Sci.
, vol.40
, pp. 320-332
-
-
Ciarallo, F.W.1
Akella, R.2
Morton, T.E.3
-
3
-
-
0034262555
-
Manufacturing to order with random yield and costly inspection
-
Sept.-Oct
-
A. Grosfeld-Nir, Y. Gerchak, and Q.-M. He, "Manufacturing to order with random yield and costly inspection," Oper. Res., vol. 48, no. 5, pp. 761-767, Sept.-Oct. 2000.
-
(2000)
Oper. Res.
, vol.48
, Issue.5
, pp. 761-767
-
-
Grosfeld-Nir, A.1
Gerchak, Y.2
He, Q.-M.3
-
4
-
-
0030218604
-
Production to order with random yields: Single-stage multiple lot-sizing
-
Aug
-
A. Grosfeld-Nir and Y. Gerchak, "Production to order with random yields: single-stage multiple lot-sizing," IIE Trans., vol. 28, no. 8, pp. 669-677, Aug. 1996.
-
(1996)
IIE Trans.
, vol.28
, Issue.8
, pp. 669-677
-
-
Grosfeld-Nir, A.1
Gerchak, Y.2
-
5
-
-
3042545957
-
Supply management in assembly systems with random yield and random demand
-
Aug
-
H. Gurnani, "Supply management in assembly systems with random yield and random demand," IIE Trans., vol. 32, no. 8, pp. 701-714, Aug. 2000.
-
(2000)
IIE Trans.
, vol.32
, Issue.8
, pp. 701-714
-
-
Gurnani, H.1
-
6
-
-
0029324375
-
A survey of the maximum principles for optimal control problems with state constraints
-
June
-
R. F. Hartl, S. P. Sethi, and R. G. Vickson, "A survey of the maximum principles for optimal control problems with state constraints," SIAM Rev., vol. 37, no. 2, pp. 181-218, June 1995.
-
(1995)
SIAM Rev.
, vol.37
, Issue.2
, pp. 181-218
-
-
Hartl, R.F.1
Sethi, S.P.2
Vickson, R.G.3
-
7
-
-
0025456687
-
The structure of periodic review policies in the presence of random yield
-
M. Henig and Y. Gerchak, "The structure of periodic review policies in the presence of random yield," Oper. Res., vol. 38, pp. 634-643, 1990.
-
(1990)
Oper. Res.
, vol.38
, pp. 634-643
-
-
Henig, M.1
Gerchak, Y.2
-
8
-
-
84977321118
-
The single period procurement problem where dedicated supplier capacity can be reserved
-
K. Jain and E. A. Silver, "The single period procurement problem where dedicated supplier capacity can be reserved," Naval Res. Log., vol. 42, pp. 915-934, 1995.
-
(1995)
Naval Res. Log.
, vol.42
, pp. 915-934
-
-
Jain, K.1
Silver, E.A.2
-
9
-
-
0009198015
-
The application of renewal theory to the study of inventory policies
-
K. Arrow, S. Karlin, and H. Scarf, Eds. Stanford, CA: Stanford Univ. Press
-
S. Karlin, "The application of renewal theory to the study of inventory policies," in Studies in the Mathematical Theory of Inventory and Production, K. Arrow, S. Karlin, and H. Scarf, Eds. Stanford, CA: Stanford Univ. Press, 1958.
-
(1958)
Studies in the Mathematical Theory of Inventory and Production
-
-
Karlin, S.1
-
10
-
-
0001552617
-
The single-period (news-vendor) problem: Literature review and suggestions for future research
-
M. Khouja, "The single-period (news-vendor) problem: literature review and suggestions for future research," Omega: Int. J. Manag. Sci., vol. 27, pp. 537-553, 1999.
-
(1999)
Omega: Int. J. Manag. Sci.
, vol.27
, pp. 537-553
-
-
Khouja, M.1
-
11
-
-
0042091890
-
Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs
-
June
-
J. J. Liu and P. Yang, "Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs," Eur. J. Oper. Res., vol. 91, no. 3, pp. 517-527, June 1996.
-
(1996)
Eur. J. Oper. Res.
, vol.91
, Issue.3
, pp. 517-527
-
-
Liu, J.J.1
Yang, P.2
-
13
-
-
0001198301
-
Lot sizing with random yields: A review
-
Mar.-Apr
-
C. A. Yano and H. L. Lee, "Lot sizing with random yields: a review," Oper. Res., vol. 43, no. 2, pp. 311-335, Mar.-Apr. 1995.
-
(1995)
Oper. Res.
, vol.43
, Issue.2
, pp. 311-335
-
-
Yano, C.A.1
Lee, H.L.2
-
14
-
-
0032676842
-
Coordinated quality control in a two-stage system
-
June
-
D. D. Yao and S. Zheng, "Coordinated quality control in a two-stage system," IEEE Trans. Automat. Contr., vol. 44, pp. 1166-1179, June 1999.
-
(1999)
IEEE Trans. Automat. Contr.
, vol.44
, pp. 1166-1179
-
-
Yao, D.D.1
Zheng, S.2
|