-
2
-
-
56349132365
-
-
Washington, DC: Transportation Research Board
-
Anderson, S., K.R. Molenaar, and C. Schexnayder. 2007. Guidance for cost estimation and management for highway projects during planning, programming, and preconstruction. NCHRP Report 574. Washington, DC: Transportation Research Board.
-
(2007)
Guidance for Cost Estimation and Management for Highway Projects during Planning, Programming, and Preconstruction. NCHRP Report 574
-
-
Anderson, S.1
Molenaar, K.R.2
Schexnayder, C.3
-
3
-
-
84930741303
-
-
Auditor General of Canada
-
Auditor General of Canada. 2009. What we do. http://www.oagbvg.gc.ca/internet/English/au_fs_e_371.html.
-
(2009)
What We Do
-
-
-
5
-
-
72149122803
-
Derailing the Boondoggle
-
Blistein, R. 2008. Derailing the Boondoggle. Miller-McCune. http://www.miller-mccune.com/business_economics/derailing-the-boondoggle-588.print.
-
(2008)
Miller-McCune
-
-
Blistein, R.1
-
6
-
-
56349131897
-
-
Washington, DC: Transportation Research Board
-
Bordat, C., B.G. McCullouch, S. Labi, and K.C. Sinha. 2004. An analysis of cost overruns and time delays of INDOT projects. Publication no. FHWA/IN/JTRP-2004/7, SPR-2811. Washington, DC: Transportation Research Board.
-
(2004)
An Analysis of Cost Overruns and Time Delays of INDOT Projects. Publication No. FHWA/IN/JTRP-2004/7, SPR-2811
-
-
Bordat, C.1
McCullouch, B.G.2
Labi, S.3
Sinha, K.C.4
-
7
-
-
0040018597
-
Learning from ex ante/ex post cost-benefit comparisons: The Coquihalla Highway example
-
Boardman, A.E., W.L. Mallery, and A.R. Vining. 1994. Learning from ex ante/ex post cost-benefit comparisons: The Coquihalla Highway example. Socio-Economic Planning Science 28 (2): 69-84.
-
(1994)
Socio-Economic Planning Science
, vol.28
, Issue.2
, pp. 69-84
-
-
Boardman, A.E.1
Mallery, W.L.2
Vining, A.R.3
-
9
-
-
33947146508
-
Analysis of rail transit project selection bias with an incentive approach
-
Chen, W. 2007. Analysis of rail transit project selection bias with an incentive approach. Planning Theory 6 (1): 69-94.
-
(2007)
Planning Theory
, vol.6
, Issue.1
, pp. 69-94
-
-
Chen, W.1
-
10
-
-
33748795062
-
Benchmarking initiatives in the construction industry: Lessons learned and improvement opportunities
-
Costa, D.B., C.T. Formoso, M. Kagioglou, L.F. Alarcon, and C.H. Caldas. 2006. Benchmarking initiatives in the construction industry: Lessons learned and improvement opportunities. Journal of Management in Engineering 22 (4): 158-67.
-
(2006)
Journal of Management in Engineering
, vol.22
, Issue.4
, pp. 158-167
-
-
Costa, D.B.1
Formoso, C.T.2
Kagioglou, M.3
Alarcon, L.F.4
Caldas, C.H.5
-
11
-
-
72149090800
-
Trends in U.S. rail transit project cost overrun
-
Transportation Research Board 2006 Annual Meeting CD-ROM, Washington, DC
-
Dantata, N.A., A. Touran, and D.C. Schneck. 2006. Trends in U.S. rail transit project cost overrun. Transportation Research Board 2006 Annual Meeting CD-ROM, Washington, DC.
-
(2006)
-
-
Dantata, N.A.1
Touran, A.2
Schneck, D.C.3
-
12
-
-
0030417198
-
Developing new urban public transport systems: An irrational decision-making process
-
Edwards, M., and R.L. Mackett. 1996. Developing new urban public transport systems: An irrational decision-making process. Transport Policy 3 (4): 225-39.
-
(1996)
Transport Policy
, vol.3
, Issue.4
, pp. 225-239
-
-
Edwards, M.1
Mackett, R.L.2
-
13
-
-
72149088362
-
-
Tallahassee: Florida Department of Transportation
-
Ellis, R., J.H. Pyeon, Z. Herbsman, E. Minchin, and K. Molenaer. 2007. Evaluation of alternative contracting techniques on FDOT construction projects. Tallahassee: Florida Department of Transportation.
-
(2007)
Evaluation of Alternative Contracting Techniques on FDOT Construction Projects
-
-
Ellis, R.1
Pyeon, J.H.2
Herbsman, Z.3
Minchin, E.4
Molenaer, K.5
-
14
-
-
54249139896
-
-
Federal Highway Administration (FHWA)
-
Federal Highway Administration (FHWA). 2005. Construction management practices in Canada and Europe. http://international.fhwa.dot.gov/construction_mgmt/index.htm.
-
(2005)
Construction Management Practices in Canada and Europe
-
-
-
16
-
-
33750723850
-
The lying game
-
June
-
Flyvbjerg, B. 2003. The lying game. Eurobusiness, June, pp. 60-62.
-
(2003)
Eurobusiness
, pp. 60-62
-
-
Flyvbjerg, B.1
-
17
-
-
27544431755
-
Machiavellian megaprojects
-
Flyvbjerg, B. 2005. Machiavellian megaprojects. Antipode 37 (1): 18-22.
-
(2005)
Antipode
, vol.37
, Issue.1
, pp. 18-22
-
-
Flyvbjerg, B.1
-
18
-
-
33847708603
-
Cost overruns and demand shortfalls in urban rail and other infrastructure
-
Flyvbjerg, B. 2007a. Cost overruns and demand shortfalls in urban rail and other infrastructure. Transportation Planning and Technology 30 (1): 9-30.
-
(2007)
Transportation Planning and Technology
, vol.30
, Issue.1
, pp. 9-30
-
-
Flyvbjerg, B.1
-
19
-
-
34547216864
-
Policy and planning for large-infrastructure projects: Problems, causes, cures
-
Flyvbjerg, B. 2007b. Policy and planning for large-infrastructure projects: Problems, causes, cures. Environment and Planning B: Planning and Design. 34 (4): 578-597.
-
(2007)
Environment and Planning B: Planning and Design
, vol.34
, Issue.4
, pp. 578-597
-
-
Flyvbjerg, B.1
-
20
-
-
37549021864
-
Curbing optimism bias and strategic misrepresentation in planning: Reference class forecasting in practice
-
Flyvbjerg, B. 2008. Curbing optimism bias and strategic misrepresentation in planning: Reference class forecasting in practice. European Planning Studies 16 (1): 3-21.
-
(2008)
European Planning Studies
, vol.16
, Issue.1
, pp. 3-21
-
-
Flyvbjerg, B.1
-
23
-
-
0442328937
-
What causes cost overrun in transport infrastructure projects?
-
Flyvbjerg, B., M. Holm, and S.L. Buhl. 2004. What causes cost overrun in transport infrastructure projects? Transport Reviews 24 (1): 3-18.
-
(2004)
Transport Reviews
, vol.24
, Issue.1
, pp. 3-18
-
-
Flyvbjerg, B.1
Holm, M.2
Buhl, S.L.3
-
24
-
-
18144415600
-
How (in)accurate are demand forecasts in public works projects? The case of transportation
-
Flyvbjerg, B., M. Holm, and S.L. Buhl. 2005. How (in)accurate are demand forecasts in public works projects? The case of transportation. Journal of the American Planning Association 71 (2): 131-46.
-
(2005)
Journal of the American Planning Association
, vol.71
, Issue.2
, pp. 131-146
-
-
Flyvbjerg, B.1
Holm, M.2
Buhl, S.L.3
-
25
-
-
72149097776
-
Assessing the effectiveness of infrastructure public-private partnership programs and projects
-
Garvin, M., and D. Bosso. 2008. Assessing the effectiveness of infrastructure public-private partnership programs and projects. Public Works Management and Policy 13 (2): 162-78.
-
(2008)
Public Works Management and Policy
, vol.13
, Issue.2
, pp. 162-178
-
-
Garvin, M.1
Bosso, D.2
-
27
-
-
0036466940
-
Evaluating the risks of public private partnerships for infrastructure projects
-
Grimsey, D., and M. Lewis. 2002. Evaluating the risks of public private partnerships for infrastructure projects. International Journal of Project Management 20 (2): 107-18.
-
(2002)
International Journal of Project Management
, vol.20
, Issue.2
, pp. 107-118
-
-
Grimsey, D.1
Lewis, M.2
-
28
-
-
0041488568
-
-
Berkeley: University of California Press
-
Hall, P. 1982. Great planning disasters. Berkeley: University of California Press.
-
(1982)
Great Planning Disasters
-
-
Hall, P.1
-
29
-
-
72149100345
-
Metronet cuts 500 jobs as Tube cost over-run passes £750m
-
Jones, A. 2007. Metronet cuts 500 jobs as Tube cost over-run passes £750m. The Independent. http://www.independent.co.uk/news/business/news/metronet-cuts-500-jobs-as-tube-cost-overrun-passes-163750m-450107.html.
-
(2007)
The Independent
-
-
Jones, A.1
-
30
-
-
0025153085
-
Deception in Dallas: Strategic misrepresentation in rail transit promotion and evaluation
-
Kain, J.F. 1990. Deception in Dallas: Strategic misrepresentation in rail transit promotion and evaluation. Journal of the American Planning Association 56 (2): 184-96.
-
(1990)
Journal of the American Planning Association
, vol.56
, Issue.2
, pp. 184-196
-
-
Kain, J.F.1
-
31
-
-
67349174243
-
Cost escalation and schedule delays in road construction projects in Zambia
-
Kaliba, C., Muyaa, M., and Mumbaa, K. 2008. Cost escalation and schedule delays in road construction projects in Zambia. International Journal of Project Management 27 (5): 522-31.
-
(2008)
International Journal of Project Management
, vol.27
, Issue.5
, pp. 522-531
-
-
Kaliba, C.1
Muyaa, M.2
Mumbaa, K.3
-
32
-
-
0003747840
-
-
no. 567, Institute of Urban and Regional Development, University of California, Berkeley
-
Leavitt, D., S. Ennis, and P. McGovern. 1993. The cost escalation of rail projects: Using previous to re-evaluate the cal-speed estimates. Working Paper no. 567, Institute of Urban and Regional Development, University of California, Berkeley.
-
(1993)
The Cost Escalation of Rail Projects: Using Previous to Re-Evaluate the Cal-Speed Estimates. Working Paper
-
-
Leavitt, D.1
Ennis, S.2
McGovern, P.3
-
33
-
-
43949143480
-
Cost overrun and cause in Korean social overhead capital projects: Roads, rails, airports, and ports
-
Lee, J.K. 2008. Cost overrun and cause in Korean social overhead capital projects: Roads, rails, airports, and ports. Journal of Urban Planning and Development 134 (2): 59-62.
-
(2008)
Journal of Urban Planning and Development
, vol.134
, Issue.2
, pp. 59-62
-
-
Lee, J.K.1
-
34
-
-
1642277111
-
Delusions of success: How optimism undermines executives' decisions
-
Lovallo, D., and D. Kahneman. 2003. Delusions of success: How optimism undermines executives' decisions. Harvard Business Review 81 (7): 56-63.
-
(2003)
Harvard Business Review
, vol.81
, Issue.7
, pp. 56-63
-
-
Lovallo, D.1
Kahneman, D.2
-
35
-
-
0031752447
-
Twenty-one sources of error and bias in transport project appraisal
-
Mackie, P., and J. Preston. 1998. Twenty-one sources of error and bias in transport project appraisal. Transport Policy 5 (1): 1-7.
-
(1998)
Transport Policy
, vol.5
, Issue.1
, pp. 1-7
-
-
Mackie, P.1
Preston, J.2
-
36
-
-
33845765754
-
The accountability and independence of the auditor-general of Australia: A comparison of their enabling legislation
-
Martinis, M.D., and C. Clark. 2003. The accountability and independence of the auditor-general of Australia: A comparison of their enabling legislation. Australian Accounting Review 13 (3): 26-37.
-
(2003)
Australian Accounting Review
, vol.13
, Issue.3
, pp. 26-37
-
-
Martinis, M.D.1
Clark, C.2
-
38
-
-
0003197981
-
Cost overruns in public works
-
In, ed. W. Niskanen, A. C. Hansen, R. H. Havermann, R. Turvey, and R. Zeckhauser, Chicago: Aldine
-
Merewitz, L. 1973a. Cost overruns in public works. In Benefit cost and policy analysis, ed. W. Niskanen, A. C. Hansen, R. H. Havermann, R. Turvey, and R. Zeckhauser, 277-95. Chicago: Aldine.
-
(1973)
Benefit Cost and Policy Analysis
, pp. 277-295
-
-
Merewitz, L.1
-
39
-
-
0042489210
-
Public transportation: Wish fulfillment and reality in the San Francisco Bay Area
-
Merewitz, L. 1973b. Public transportation: Wish fulfillment and reality in the San Francisco Bay Area. American Economic Association 62 (1/2): 78-86.
-
(1973)
American Economic Association
, vol.62
, Issue.1-2
, pp. 78-86
-
-
Merewitz, L.1
-
40
-
-
72149090550
-
-
Missouri State Auditor, St. Louis: Missouri State Auditor
-
Missouri State Auditor. 2008. Metro (St. Louis). St. Louis: Missouri State Auditor.
-
(2008)
Metro (St. Louis)
-
-
-
44
-
-
0033041518
-
How reliable are estimates of infrastructure costs? A comparative analysis
-
Nijkamp, P., and B. Ubbels. 1999. How reliable are estimates of infrastructure costs? A comparative analysis. International Journal of Transport Economics 26 (1): 23-53.
-
(1999)
International Journal of Transport Economics
, vol.26
, Issue.1
, pp. 23-53
-
-
Nijkamp, P.1
Ubbels, B.2
-
45
-
-
1642538212
-
Cost overruns in road construction-What are their sizes and determinants?
-
Odeck, J. 2004. Cost overruns in road construction-What are their sizes and determinants? Transport Policy 11 (1): 43-53.
-
(2004)
Transport Policy
, vol.11
, Issue.1
, pp. 43-53
-
-
Odeck, J.1
-
46
-
-
0026475011
-
A desire named streetcar: Fantasy and fact in rail transit planning
-
Pickrell, D.H. 1992. A desire named streetcar: Fantasy and fact in rail transit planning. Journal of the American Planning Association 58 (2): 158-76.
-
(1992)
Journal of the American Planning Association
, vol.58
, Issue.2
, pp. 158-176
-
-
Pickrell, D.H.1
-
47
-
-
34547145747
-
Development and design of large infrastructure projects: Disregarded alternatives and issues of spatial planning
-
Priemus, H. 2007. Development and design of large infrastructure projects: Disregarded alternatives and issues of spatial planning. Environment and Planning B 34:626-44.
-
(2007)
Environment and Planning B
, vol.34
, pp. 626-644
-
-
Priemus, H.1
-
48
-
-
0035013645
-
A whole system approach to evaluating urban transit investment
-
Richmond, J. 2001. A whole system approach to evaluating urban transit investment. Transport Reviews 21 (2): 141-79.
-
(2001)
Transport Reviews
, vol.21
, Issue.2
, pp. 141-179
-
-
Richmond, J.1
-
51
-
-
72149096416
-
Cost overruns send Wisconsin road project budgets soaring
-
November 26, P
-
Sandler, L. 2003. Cost overruns send Wisconsin road project budgets soaring. The Milwaukee Journal Sentinel, November 26, P.1.
-
(2003)
The Milwaukee Journal Sentinel
, pp. 1
-
-
Sandler, L.1
-
53
-
-
72149096423
-
Laval metro's fate questioned as costs rise
-
May 24
-
Shepherd, H. 2003. Laval metro's fate questioned as costs rise. The Gazette, May 24, A.7.
-
(2003)
The Gazette
-
-
Shepherd, H.1
-
54
-
-
69849111469
-
Implications of private-public partnerships on the development of urban public transit infrastructure: The case of Vancouver
-
Siemiatycki, M. 2006. Implications of private-public partnerships on the development of urban public transit infrastructure: The case of Vancouver. Journal of Planning Education and Research 24 (4): 379-93.
-
(2006)
Journal of Planning Education and Research
, vol.24
, Issue.4
, pp. 379-393
-
-
Siemiatycki, M.1
-
55
-
-
36549069161
-
What's the secret? The application of confidentiality in the planning of infrastructure using private-public partnerships
-
Siemiatycki, M. 2007. What's the secret? The application of confidentiality in the planning of infrastructure using private-public partnerships. Journal of the American Planning Association 73 (4): 388-403.
-
(2007)
Journal of the American Planning Association
, vol.73
, Issue.4
, pp. 388-403
-
-
Siemiatycki, M.1
-
56
-
-
60549083137
-
Benchmarking and the bottom line
-
Siemiatycki, M. 2009. Benchmarking and the bottom line. Public Policy Research Journal 15 (4): 224-28.
-
(2009)
Public Policy Research Journal
, vol.15
, Issue.4
, pp. 224-228
-
-
Siemiatycki, M.1
-
59
-
-
16444372351
-
-
State of Washington Joint Legislative Audit and Review Committee., Olympia, WA: Joint Legislative Audit and Review Committee
-
State of Washington Joint Legislative Audit and Review Committee. 1998. Department of transportation highways and rail programs performance audit. Olympia, WA: Joint Legislative Audit and Review Committee.
-
(1998)
Department of Transportation Highways and Rail Programs Performance Audit
-
-
-
60
-
-
72149104482
-
-
Toronto City Auditor, Toronto, Canada: City Auditor
-
Toronto City Auditor. 1998. Sheppard Subway project cost overruns. Toronto, Canada: City Auditor.
-
(1998)
Sheppard Subway Project Cost Overruns
-
-
-
63
-
-
84896073510
-
-
U.S. General Accounting Office (GAO)
-
U.S. General Accounting Office (GAO). 2009. Government Accountability Office - About Us. http://www.gao.gov/about/index.html.
-
(2009)
Government Accountability Office - About Us
-
-
-
64
-
-
34547196859
-
Large infrastructure projects: A review of the quality of demand forecasts and cost estimation
-
van Wee, B. 2007. Large infrastructure projects: A review of the quality of demand forecasts and cost estimation. Environment and Planning B 34 (4): 611-25.
-
(2007)
Environment and Planning B
, vol.34
, Issue.4
, pp. 611-625
-
-
van Wee, B.1
-
65
-
-
34547218458
-
Cost-benefit analysis and large-scale infrastructure projects: State of the art and challenges
-
Vickerman, R. 2007. Cost-benefit analysis and large-scale infrastructure projects: State of the art and challenges. Environment and Planning B 34 (4): 598-610.
-
(2007)
Environment and Planning B
, vol.34
, Issue.4
, pp. 598-610
-
-
Vickerman, R.1
-
66
-
-
84928442543
-
Technique vs. advocacy in forecasting: A study of rail rapid transit
-
Wachs, M. 1986. Technique vs. advocacy in forecasting: A study of rail rapid transit. Urban Resources 4 (1): 23-30.
-
(1986)
Urban Resources
, vol.4
, Issue.1
, pp. 23-30
-
-
Wachs, M.1
-
68
-
-
72149106349
-
-
Wisconsin Legislative Audit Bureau, Madison, WI: Legislative Audit Bureau
-
Wisconsin Legislative Audit Bureau. 2003. An evaluation: Major transportation projects. Madison, WI: Legislative Audit Bureau.
-
(2003)
An Evaluation: Major Transportation Projects
-
-
-
69
-
-
27744473626
-
Statistical analysis of causes for design change in highway construction on Taiwan
-
Wu, C., T. Hsieh, and W. Cheng. 2005. Statistical analysis of causes for design change in highway construction on Taiwan. International Journal of Project Management 23:554-63.
-
(2005)
International Journal of Project Management
, vol.23
, pp. 554-563
-
-
Wu, C.1
Hsieh, T.2
Cheng, W.3
|