메뉴 건너뛰기




Volumn 189, Issue 3, 2008, Pages 1267-1283

Predictive-reactive scheduling on a single resource with uncertain future jobs

Author keywords

Predictive reactive scheduling; Project management and scheduling; Uncertainty modeling

Indexed keywords

COST ACCOUNTING; DYNAMIC PROGRAMMING; HEURISTIC PROGRAMMING; RESOURCE ALLOCATION; STRATEGIC PLANNING; UNCERTAIN SYSTEMS;

EID: 40849087858     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2006.06.077     Document Type: Article
Times cited : (39)

References (23)
  • 1
    • 0000315146 scopus 로고
    • A survey of algorithms for the single machine total weighted tardiness scheduling problem
    • Abdul-Razaq T.S., Potts C.N., and van Wassenhove L.N. A survey of algorithms for the single machine total weighted tardiness scheduling problem. Discrete Applied Mathematics 26 (1990) 235-253
    • (1990) Discrete Applied Mathematics , vol.26 , pp. 235-253
    • Abdul-Razaq, T.S.1    Potts, C.N.2    van Wassenhove, L.N.3
  • 3
    • 0013238227 scopus 로고    scopus 로고
    • An iterated dynasearch algorithm for the single-machine total weighted tardiness scheduling problem
    • Congram R.K., Potts C.N., and van de Velde S.L. An iterated dynasearch algorithm for the single-machine total weighted tardiness scheduling problem. INFORMS Journal on Computing 14 1 (2002) 52-67
    • (2002) INFORMS Journal on Computing , vol.14 , Issue.1 , pp. 52-67
    • Congram, R.K.1    Potts, C.N.2    van de Velde, S.L.3
  • 4
    • 0001234583 scopus 로고    scopus 로고
    • Local search heuristics for the single machine total weighted tardiness scheduling problem
    • Crauwels H.A.J., Potts C.N., and van Wassenhove L.N. Local search heuristics for the single machine total weighted tardiness scheduling problem. INFORMS Journal on Computing 10 (1998) 341-350
    • (1998) INFORMS Journal on Computing , vol.10 , pp. 341-350
    • Crauwels, H.A.J.1    Potts, C.N.2    van Wassenhove, L.N.3
  • 5
    • 0035546163 scopus 로고    scopus 로고
    • On the optimal release time of jobs with random processing times, with extensions to other criteria
    • Elmaghraby S. On the optimal release time of jobs with random processing times, with extensions to other criteria. International Journal of Production Economics 74 (2001) 102-113
    • (2001) International Journal of Production Economics , vol.74 , pp. 102-113
    • Elmaghraby, S.1
  • 6
    • 3543072290 scopus 로고    scopus 로고
    • Sensitivity analysis for scheduling problems
    • Hall N.G., and Posner M.E. Sensitivity analysis for scheduling problems. Journal of Scheduling 7 1 (2004) 49-83
    • (2004) Journal of Scheduling , vol.7 , Issue.1 , pp. 49-83
    • Hall, N.G.1    Posner, M.E.2
  • 7
    • 0028524436 scopus 로고
    • Fuzzy project scheduling system for software development
    • Hapke M., Jaszkiewicz A., and Slowinski R. Fuzzy project scheduling system for software development. Fuzzy Sets and Systems 67 (1994) 101-117
    • (1994) Fuzzy Sets and Systems , vol.67 , pp. 101-117
    • Hapke, M.1    Jaszkiewicz, A.2    Slowinski, R.3
  • 8
    • 0029250558 scopus 로고
    • Stability of queuing networks and scheduling policies
    • Kumar P.R., and Meyn S.P. Stability of queuing networks and scheduling policies. IEEE Transaction on Automatic Control 40 2 (1995) 251-260
    • (1995) IEEE Transaction on Automatic Control , vol.40 , Issue.2 , pp. 251-260
    • Kumar, P.R.1    Meyn, S.P.2
  • 9
    • 77957077792 scopus 로고
    • A "pseudopolynomial" algorithm for sequencing jobs to minimize total tardiness
    • Lawler E.L. A "pseudopolynomial" algorithm for sequencing jobs to minimize total tardiness. Annals of Discrete Mathematics 1 (1977) 331-342
    • (1977) Annals of Discrete Mathematics , vol.1 , pp. 331-342
    • Lawler, E.L.1
  • 10
    • 1442278951 scopus 로고    scopus 로고
    • Liberatore, M.J., Pollack-Johnson, B., 2003. A macro approach to modeling projects with uncertain network structures. In: Technology Management for Reshaping the World, 2003. PICMET '03: Portland International Conference on Management of Engineering and Technology, July 20-24, 2003, pp. 246-254.
    • Liberatore, M.J., Pollack-Johnson, B., 2003. A macro approach to modeling projects with uncertain network structures. In: Technology Management for Reshaping the World, 2003. PICMET '03: Portland International Conference on Management of Engineering and Technology, July 20-24, 2003, pp. 246-254.
  • 11
    • 0004779059 scopus 로고
    • A controlled search simulated annealing method for the single machine weighted tardiness problem
    • Matsuo H., Suh C.J., and Sullivan R.S. A controlled search simulated annealing method for the single machine weighted tardiness problem. Annals of Operations Research 21 1 (1988) 85-108
    • (1988) Annals of Operations Research , vol.21 , Issue.1 , pp. 85-108
    • Matsuo, H.1    Suh, C.J.2    Sullivan, R.S.3
  • 12
    • 40849121534 scopus 로고    scopus 로고
    • Morton, T.E., Rachamadugu, R.V., 1982. Myopic heuristics for the single machine weighted tardiness problem. Working paper #28-81-82, Graduate School of Industrial Administration, Carnegie Mellon University.
    • Morton, T.E., Rachamadugu, R.V., 1982. Myopic heuristics for the single machine weighted tardiness problem. Working paper #28-81-82, Graduate School of Industrial Administration, Carnegie Mellon University.
  • 14
    • 0033343706 scopus 로고    scopus 로고
    • Predictable scheduling of a single machine with breakdowns and sensitive jobs
    • O'Donovan R., Uzsoy R.M., and McKay K.N. Predictable scheduling of a single machine with breakdowns and sensitive jobs. International Journal of Production Research 37 18 (1999) 4217-4233
    • (1999) International Journal of Production Research , vol.37 , Issue.18 , pp. 4217-4233
    • O'Donovan, R.1    Uzsoy, R.M.2    McKay, K.N.3
  • 15
    • 0036346433 scopus 로고    scopus 로고
    • Pan, H., Yeh, C., Willis, R.J., 2001. Computer-aided system to solve uncertainty in project management. In: The 10th IEEE International Conference on Fuzzy Systems.
    • Pan, H., Yeh, C., Willis, R.J., 2001. Computer-aided system to solve uncertainty in project management. In: The 10th IEEE International Conference on Fuzzy Systems.
  • 17
    • 0020748381 scopus 로고
    • Stochastic scheduling with release and due dates
    • Pinedo M.L. Stochastic scheduling with release and due dates. Operations Research 31 (1983) 559-572
    • (1983) Operations Research , vol.31 , pp. 559-572
    • Pinedo, M.L.1
  • 18
    • 0026123423 scopus 로고
    • Sequencing jobs on a single machine with a common due date and stochastic processing times
    • Sarin S.C., Erel E., and Steiner G. Sequencing jobs on a single machine with a common due date and stochastic processing times. European Journal of Operational Research 51 2 (1991) 188-198
    • (1991) European Journal of Operational Research , vol.51 , Issue.2 , pp. 188-198
    • Sarin, S.C.1    Erel, E.2    Steiner, G.3
  • 20
    • 0023399009 scopus 로고
    • Priority rules for job shops with weighted tardiness costs
    • Vepsalainen A.P.J., and Morton T.E. Priority rules for job shops with weighted tardiness costs. Management Science 33 8 (1987) 1035-1047
    • (1987) Management Science , vol.33 , Issue.8 , pp. 1035-1047
    • Vepsalainen, A.P.J.1    Morton, T.E.2
  • 21
    • 0027224847 scopus 로고
    • One-machine rescheduling heuristics with efficiency and stability as criteria
    • Wu S.D., Storer R.H., and Chang P.C. One-machine rescheduling heuristics with efficiency and stability as criteria. Computers and Operations Research 20 1 (1993) 1-14
    • (1993) Computers and Operations Research , vol.20 , Issue.1 , pp. 1-14
    • Wu, S.D.1    Storer, R.H.2    Chang, P.C.3
  • 22
    • 0036498099 scopus 로고    scopus 로고
    • On the robust single machine scheduling problem
    • Yang J., and Yu G. On the robust single machine scheduling problem. Journal of Combinatorial Optimization 6 (2002) 17-33
    • (2002) Journal of Combinatorial Optimization , vol.6 , pp. 17-33
    • Yang, J.1    Yu, G.2
  • 23
    • 1642398260 scopus 로고    scopus 로고
    • A Heuristic approach for minimizing weighted tardiness and overtime costs in single resource scheduling
    • Yang B., Geunes J., and O'Brien W. A Heuristic approach for minimizing weighted tardiness and overtime costs in single resource scheduling. Computers & Operations Research 31 (2004) 1273-1301
    • (2004) Computers & Operations Research , vol.31 , pp. 1273-1301
    • Yang, B.1    Geunes, J.2    O'Brien, W.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.