메뉴 건너뛰기




Volumn 1, Issue , 2009, Pages 390-394

The evaluation for the mission-time of quick response manufacturing system

Author keywords

[No Author keywords available]

Indexed keywords

DESIGN ITERATION; FINITE-STATE; FIRST ARRIVAL; MARKOV MODEL; MARKOV RENEWAL PROCESS; PRODUCT DEVELOPMENT PROCESS; QUICK RESPONSE MANUFACTURING; RESOURCE CONFLICT; TIME DISTRIBUTION;

EID: 70649090240     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/CSO.2009.109     Document Type: Conference Paper
Times cited : (2)

References (7)
  • 1
    • 23344432043 scopus 로고    scopus 로고
    • A simulation-based process model for managing complex design projects
    • S.H. Cho, S. D. Eppinger. A simulation-based process model for managing complex design projects. IEEE Transactions on Engineering Management. 2005(52).3, pp. 316-328.
    • (2005) IEEE Transactions on Engineering Management , vol.52 , Issue.3 , pp. 316-328
    • Cho, S.H.1    Eppinger, S.D.2
  • 2
    • 0019597497 scopus 로고
    • The design structure system: A method for managing the design of complex systems
    • D.V. Steward. The design structure system: A method for managing the design of complex systems. IEEE Transactions on Engineering Management. 1981(28).3, pp.71-74.
    • (1981) IEEE Transactions on Engineering Management , vol.28 , Issue.3 , pp. 71-74
    • Steward, D.V.1
  • 3
    • 0031199079 scopus 로고    scopus 로고
    • R.P. Smith, S.D. Eppinger. A predictive model of sequential iteration in engineering design. Management Science. 1997(43).8, pp.1104-20.
    • R.P. Smith, S.D. Eppinger. A predictive model of sequential iteration in engineering design. Management Science. 1997(43).8, pp.1104-20.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.