Process model for administrating construction claims
-
DOI 10.1061/(ASCE)0742-597X(2002)18:2(84)
-
Abdul-Malak, M. A. U., El-Saadi, M. M. H., and Abou-Zeid, M. G. (2002). " Process model for administrating construction claims.." J. Manage. Eng. 0742-597X, 18 (2), 84-94. 10.1061/(ASCE)0742-597X(2002)18:2(84) (Pubitemid 40329149)
-
(2002)
Journal of Management in Engineering
, vol.18
, Issue.2
, pp. 84-94
-
-
Abdul-Malak, M.A.U.1
El-Saadi, M.M.H.2
Abou-Zeid, M.G.3
-
2
-
-
0012541491
-
Modelling for litigation: Mixing qualitative and quantitative approaches
-
0092-2102,. 10.1287/inte.27.2.48
-
Ackermann, F., Eden, C., and Williams, T. (1997). " Modelling for litigation: Mixing qualitative and quantitative approaches.." Interfaces 0092-2102, 27, 48-65. 10.1287/inte.27.2.48
-
(1997)
Interfaces
, vol.27
, pp. 48-65
-
-
Ackermann, F.1
Eden, C.2
Williams, T.3
-
3
-
-
31844432505
-
-
AACE International Transactions (CD-ROM), Association for the Advancement of Cost Engineering International, W.Va.
-
Al-Gahtani, K. S., and Mohan, S. B. (2005). " Total float management for delay analysis.." AACE International Transactions (CD-ROM), Association for the Advancement of Cost Engineering International, W.Va.
-
(2005)
Total Float Management for Delay Analysis
-
-
Al-Gahtani, K.S.1
Mohan, S.B.2
-
4
-
-
0000893055
-
Construction delay analysis techniques
-
0144-6193,. 10.1080/014461996373250
-
Alkass, S., Mazerolle, M., and Harris, F. (1996). " Construction delay analysis techniques.." Constr. Manage. Econom. 0144-6193, 14, 375-394. 10.1080/014461996373250
-
(1996)
Constr. Manage. Econom.
, vol.14
, pp. 375-394
-
-
Alkass, S.1
Mazerolle, M.2
Harris, F.3
-
5
-
-
0346296591
-
Construction planning and information technology in the UK and US construction industries: A comparative study
-
0144-6193,. 10.1080/01446199400000016
-
Aouad, G., and Price, A. D. F. (1994). " Construction planning and information technology in the UK and US construction industries: A comparative study.." Constr. Manage. Econom. 0144-6193, 12, 97-106. 10.1080/01446199400000016
-
(1994)
Constr. Manage. Econom.
, vol.12
, pp. 97-106
-
-
Aouad, G.1
Price, A.D.F.2
-
6
-
-
0024622963
-
Impact analysis of owner-directed acceleration
-
0733-9364, (),. 10.1061/(ASCE)0733-9364(1989)115:1(144)
-
Arditi, D., and Patel, B. K. (1989). " Impact analysis of owner-directed acceleration.." J. Constr. Eng. Manage. 0733-9364, 115 (1), 144-157. 10.1061/(ASCE)0733-9364(1989)115:1(144)
-
(1989)
J. Constr. Eng. Manage.
, vol.115
, Issue.1
, pp. 144-157
-
-
Arditi, D.1
Patel, B.K.2
-
7
-
-
32644462382
-
Selecting a delay analysis method in resolving construction claims
-
DOI 10.1016/j.ijproman.2005.08.005, PII S0263786305000906
-
Arditi, D., and Pattanakitchamroon, T. (2006). " Selecting a delay analysis method in resolving construction claims.." Int. J. Proj. Manag., 24, 145-155. 10.1016/j.ijproman.2005.08.005 0263-7863 (Pubitemid 43246170)
-
(2006)
International Journal of Project Management
, vol.24
, Issue.2
, pp. 145-155
-
-
Arditi, D.1
Pattanakitchamroon, T.2
-
8
-
-
0342646276
-
Concurrent delays in construction litigation
-
0274-9696.
-
Arditi, D., and Rubinson, M. A. (1995). " Concurrent delays in construction litigation.." Cost Eng. 0274-9696, 37 (7), 20-30.
-
(1995)
Cost Eng.
, vol.37
, Issue.7
, pp. 20-30
-
-
Arditi, D.1
Rubinson, M.A.2
-
9
-
-
84860157152
-
-
Association for the Advancement of Cost Engineering International (AACEI).., AACEI, Morgantown, W.Va.
-
Association for the Advancement of Cost Engineering International (AACEI). (2007). Recommended Practice No. 29R-03, Forensic Schedule Analysis, AACEI, Morgantown, W.Va.
-
(2007)
Recommended Practice No. 29R-03, Forensic Schedule Analysis
-
-
-
10
-
-
0001164228
-
A methodology for assessing construction project delays
-
0144-6193,. 10.1080/014461998372358
-
Bordoli, D. W., and Baldwin, A. A. (1998). " A methodology for assessing construction project delays.." Constr. Manage. Econom. 0144-6193, 16, 327-337. 10.1080/014461998372358
-
(1998)
Constr. Manage. Econom.
, vol.16
, pp. 327-337
-
-
Bordoli, D.W.1
Baldwin, A.A.2
-
11
-
-
0005404843
-
Comparison of delay analysis methodologies
-
0733-9364, (),. 10.1061/(ASCE)0733-9364(1998)124:4(315)
-
Bubshait, A. A., and Cunningham, M. J. (1998). " Comparison of delay analysis methodologies.." J. Constr. Eng. Manage. 0733-9364, 124 (4), 315-322. 10.1061/(ASCE)0733-9364(1998)124:4(315)
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.4
, pp. 315-322
-
-
Bubshait, A.A.1
Cunningham, M.J.2
-
12
-
-
33749380177
-
Management of concurrent delay in construction
-
0274-9696.
-
Bubshait, A. A., and Cunningham, M. J. (2004). " Management of concurrent delay in construction.." Cost Eng. 0274-9696, 46 (6), 22-28.
-
(2004)
Cost Eng.
, vol.46
, Issue.6
, pp. 22-28
-
-
Bubshait, A.A.1
Cunningham, M.J.2
-
14
-
-
0141988044
-
-
2nd Ed., Sage, Thousand Oaks, Calif.
-
Creswell, J. W. (2003). Research design: Qualitative, quantitative, and mixed methods approaches, 2nd Ed., Sage, Thousand Oaks, Calif.
-
(2003)
Research Design: Qualitative, Quantitative, and Mixed Methods Approaches
-
-
Creswell, J.W.1
-
15
-
-
0026883408
-
Super change: Expert system for analysis of changes claims
-
0733-9364, (),. 10.1061/(ASCE)0733-9364(1992)118:2(399)
-
Diekmann, J. E., and Kim, M. P. (1992). " Super change: Expert system for analysis of changes claims.." J. Constr. Eng. Manage. 0733-9364, 118 (2), 399-411. 10.1061/(ASCE)0733-9364(1992)118:2(399)
-
(1992)
J. Constr. Eng. Manage.
, vol.118
, Issue.2
, pp. 399-411
-
-
Diekmann, J.E.1
Kim, M.P.2
-
16
-
-
49749090766
-
Analyzing project cost overruns: Comparing the measured mile' analysis and system dynamics modeling
-
".
-
Eden, C., Williams, T., and Ackermann, F. (2004). " Analyzing project cost overruns: Comparing the measured mile' analysis and system dynamics modeling.." Int. J. Proj. Manage., 22 (7), 445-451.
-
(2004)
Int. J. Proj. Manage.
, vol.22
, Issue.7
, pp. 445-451
-
-
Eden, C.1
Williams, T.2
Ackermann, F.3
-
18
-
-
0033096878
-
Window analysis of compensable delays
-
0733-9364, (),. 10.1061/(ASCE)0733-9364(1999)125:2(96)
-
Finke, M. R. (1999). " Window analysis of compensable delays.." J. Constr. Eng. Manage. 0733-9364, 125 (2), 96-100. 10.1061/(ASCE)0733- 9364(1999)125:2(96)
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.2
, pp. 96-100
-
-
Finke, M.R.1
-
19
-
-
0028406199
-
The ten reasons why surveys fail
-
Furtrell, D. (1994). " The ten reasons why surveys fail.." Quality Progress, 65-69.
-
(1994)
Quality Progress
, pp. 65-69
-
-
Furtrell, D.1
-
20
-
-
2242426550
-
Concurrent schedule delay in international contracts
-
Galloway, P. D., and Nielsen, K. R. (1990). " Concurrent schedule delay in international contracts.." Int. Constr. Law Rev., 4, 386-401.
-
(1990)
Int. Constr. Law Rev.
, vol.4
, pp. 386-401
-
-
Galloway, P.D.1
Nielsen, K.R.2
-
21
-
-
0000757833
-
Project complexity: The focal point of construction production planning
-
0144-6193,. 10.1080/014461996373476
-
Gidado, K. I. (1996). " Project complexity: The focal point of construction production planning.." Constr. Manage. Econom. 0144-6193, 14, 213-225. 10.1080/014461996373476
-
(1996)
Constr. Manage. Econom.
, vol.14
, pp. 213-225
-
-
Gidado, K.I.1
-
22
-
-
0003933142
-
-
3rd Ed., Paul Chapman, London.
-
Gill, J., and Johnson, P. (2002). Research methods for managers, 3rd Ed., Paul Chapman, London.
-
(2002)
Research Methods for Managers
-
-
Gill, J.1
Johnson, P.2
-
23
-
-
32644467281
-
Schedule delay analysis: Modified windows approach
-
0274-9696.
-
Gothand, K. D. (2003). " Schedule delay analysis: Modified windows approach.." Cost Eng. 0274-9696, 45 (9), 18-23.
-
(2003)
Cost Eng.
, vol.45
, Issue.9
, pp. 18-23
-
-
Gothand, K.D.1
-
26
-
-
84993047609
-
UK practice in dealing with claims for delay
-
0969-9988, (),. 10.1046/j.1365-232X.2001.00214.x
-
Harris, R. A., and Scott, S. (2001). " UK practice in dealing with claims for delay.." Eng., Constr., Archit. Manage. 0969-9988, 8 (5/6), 317-324. 10.1046/j.1365-232X.2001.00214.x
-
(2001)
Eng., Constr., Archit. Manage.
, vol.8
, Issue.5-6
, pp. 317-324
-
-
Harris, R.A.1
Scott, S.2
-
27
-
-
18744411578
-
Daily window delay analysis
-
0733-9364, (),. 10.1061/(ASCE)0733-9364(2005)131:5(505)
-
Hegazy, T., and Zhang, K. (2005). " Daily window delay analysis.." J. Constr. Eng. Manage. 0733-9364, 131 (5), 505-512. 10.1061/(ASCE)0733-9364(2005)131:5(505)
-
(2005)
J. Constr. Eng. Manage.
, vol.131
, Issue.5
, pp. 505-512
-
-
Hegazy, T.1
Zhang, K.2
-
28
-
-
0039183406
-
Uncertainty and project objectives
-
1461-5517.
-
Howell, G. A., Laufer, A., and Ballard, G. (1993). " Uncertainty and project objectives.." Proj. Appraisal J. 1461-5517, 8, 37-43.
-
(1993)
Proj. Appraisal J.
, vol.8
, pp. 37-43
-
-
Howell, G.A.1
Laufer, A.2
Ballard, G.3
-
29
-
-
33846268790
-
Schedule analysis under the effect of resource allocation
-
DOI 10.1061/(ASCE)0733-9364(2007)133:2(131)
-
Ibbs, W., and Nguyen, L. D. (2007). " Schedule analysis under the effect of resource allocation.." J. Constr. Eng. Manage. 0733-9364, 133 (2), 131-138. 10.1061/(ASCE)0733-9364(2007)133:2(131) (Pubitemid 46121722)
-
(2007)
Journal of Construction Engineering and Management
, vol.133
, Issue.2
, pp. 131-138
-
-
Ibbs, W.1
Nguyen, L.D.2
-
30
-
-
0011100692
-
Construction documentation in arbitration
-
0733-9364, (),. 10.1061/(ASCE)0733-9364(1995)121:2(201)
-
Kangari, R. (1995). " Construction documentation in arbitration.." J. Constr. Eng. Manage. 0733-9364, 121 (2), 201-208. 10.1061/(ASCE)0733-9364(1995)121:2(201)
-
(1995)
J. Constr. Eng. Manage.
, vol.121
, Issue.2
, pp. 201-208
-
-
Kangari, R.1
-
31
-
-
1442336404
-
-
Bartlett Research Paper 15, a VIRCON project report, University College London, London.
-
Kelsey, J., Winch, G., and Penn, A. (2001). " Understanding the project planning process: Requirements capture for the virtual construction site.." Bartlett Research Paper 15, a VIRCON project report, University College London, London.
-
(2001)
Understanding the Project Planning Process: Requirements Capture for the Virtual Construction Site
-
-
Kelsey, J.1
Winch, G.2
Penn, A.3
-
32
-
-
49749101979
-
-
Kompass.. "." Reed business systems in association with the confederation of British industry, 〈〉 (July 10, 2006).
-
Kompass. (2006). " Register of product and services.." Reed business systems in association with the confederation of British industry, 〈 www.kompass.com 〉 (July 10, 2006).
-
(2006)
Register of Product and Services
-
-
-
33
-
-
0023594272
-
Concurrent delays in construction projects
-
0733-9364, (),. 10.1061/(ASCE)0733-9364(1987)113:4(591)
-
Kraiem, Z. M., and Diekmann, J. E. (1987). " Concurrent delays in construction projects.." J. Constr. Eng. Manage. 0733-9364, 113 (4), 591-602. 10.1061/(ASCE)0733-9364(1987)113:4(591)
-
(1987)
J. Constr. Eng. Manage.
, vol.113
, Issue.4
, pp. 591-602
-
-
Kraiem, Z.M.1
Diekmann, J.E.2
-
34
-
-
0037210849
-
Substantiation and assessment of claims for extensions of time
-
DOI 10.1016/S0263-7863(01)00052-7, PII S0263786301000527
-
Kumaraswamy, M. M., and Yogeswaran, K. (2003). " Substantiation and assessment of claims for extensions of time.." Int. J. Proj. Manag., 2 (1), 27-38. 10.1016/S0263-7863(01)00052-7 0263-7863 (Pubitemid 35391746)
-
(2003)
International Journal of Project Management
, vol.21
, Issue.1
, pp. 27-38
-
-
Kumaraswamy, M.M.1
Yogeswaran, K.2
-
35
-
-
49749148395
-
Project delay: Schedule analysis models and techniques
-
San Francisco.
-
Leary, C. P., and Bramble, B. B. (1988). " Project delay: Schedule analysis models and techniques.." Proc., Project Management Institute Seminar/Symp., San Francisco, 63-69.
-
(1988)
Proc., Project Management Institute Seminar/Symp.
, pp. 63-69
-
-
Leary, C.P.1
Bramble, B.B.2
-
36
-
-
27744482331
-
Method for calculating scheduling delay considering lost productivity
-
0733-9364, (),. 10.1061/(ASCE)0733-9364(2005)131:11(1147)
-
Lee, H., Ryu, H., Yu, J., and Kim, J. (2005). " Method for calculating scheduling delay considering lost productivity.." J. Constr. Eng. Manage. 0733-9364, 131 (11), 1147-1154. 10.1061/(ASCE)0733-9364(2005)131: 11(1147)
-
(2005)
J. Constr. Eng. Manage.
, vol.131
, Issue.11
, pp. 1147-1154
-
-
Lee, H.1
Ryu, H.2
Yu, J.3
Kim, J.4
-
37
-
-
32644454802
-
Claims schedule development and analysis: Collapsed as-built scheduling for beginners
-
0274-9696.
-
Lovejoy, V. A. (2004). " Claims schedule development and analysis: Collapsed as-built scheduling for beginners.." Cost Eng. 0274-9696, 46 (1), 27-30.
-
(2004)
Cost Eng.
, vol.46
, Issue.1
, pp. 27-30
-
-
Lovejoy, V.A.1
-
38
-
-
75849148189
-
Schedule Analyser Pro-An aid in the analysis of delay time impact analysis
-
0274-9696.
-
Lucas, D. E. (2002). " Schedule Analyser Pro-An aid in the analysis of delay time impact analysis.." Cost Eng. 0274-9696, 44 (8), 30-36.
-
(2002)
Cost Eng.
, vol.44
, Issue.8
, pp. 30-36
-
-
Lucas, D.E.1
-
39
-
-
0027306338
-
An integrated system to facilitate the analysis of construction claims
-
ASCE, Calif..
-
Mazerolle, M., and Alkass, S. (1993). " An integrated system to facilitate the analysis of construction claims.." Proc., 5th Int. Conf. on Computing in Civil and Building Engineering, ASCE, Calif., 1509-1516.
-
(1993)
Proc., 5th Int. Conf. on Computing in Civil and Building Engineering
, pp. 1509-1516
-
-
Mazerolle, M.1
Alkass, S.2
-
40
-
-
26644452540
-
Modified but-for method for delay analysis
-
DOI 10.1061/(ASCE)0733-9364(2005)131:10(1142)
-
Mbabazi, A., Hegazy, T., and Saccomanno, F. (2005). " Modified but-for method for delay analysis.." J. Constr. Eng. Manage. 0733-9364, 131 (10), 1142-1144. 10.1061/(ASCE)0733-9364(2005)131:10(1142) (Pubitemid 41441438)
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.10
, pp. 1142-1144
-
-
Mbabazi, A.1
Hegazy, T.2
Saccomanno, F.3
-
41
-
-
0003784156
-
-
2nd Ed., Thousand Oaks, London.
-
Miles, M. B., and Huberman, M. (1994) Qualitative data analysis: An expanded sourcebook, 2nd Ed., Thousand Oaks, London.
-
(1994)
Qualitative Data Analysis: An Expanded Sourcebook
-
-
Miles, M.B.1
Huberman, M.2
-
42
-
-
0003709185
-
-
The Chartered Institute of Building, Ascot, U.K.
-
Nahapiet, J., and Nahapiet, H. (1985). The management of construction projects: Case studies from the USA and UK, The Chartered Institute of Building, Ascot, U.K.
-
(1985)
The Management of Construction Projects: Case Studies from the USA and UK
-
-
Nahapiet, J.1
Nahapiet, H.2
-
43
-
-
49749086559
-
Delay analysis within construction contracting organizations
-
", (),. 10.1061/(ASCE)0733-9364(2008)134:9(692)
-
Ndekugri, I., Braimah, N., and Gameson, R. (2008). " Delay analysis within construction contracting organizations.." J. Constr. Eng. Manage., 134 (9), 692-700. 10.1061/(ASCE)0733-9364(2008)134:9(692)
-
(2008)
J. Constr. Eng. Manage.
, vol.134
, Issue.9
, pp. 692-700
-
-
Ndekugri, I.1
Braimah, N.2
Gameson, R.3
-
44
-
-
70450126930
-
New civil engineer's supplement
-
New Civil Engineer.. ".", Institute of Civil Engineers, Emap, London.
-
New Civil Engineer. (2006). " New civil engineer's supplement.." NCE's consultant file, Institute of Civil Engineers, Emap, London.
-
(2006)
NCE's Consultant File
-
-
-
45
-
-
12344320435
-
Fuzzy logic approach for activity delay analysis and schedule updating
-
DOI 10.1061/(ASCE)0733-9364(2005)131:1(42)
-
Oliveros, A. V. O., and Fayek, A. R. (2005). " Fuzzy logic approach for activity delay analysis and schedule updating.." J. Constr. Eng. Manage. 0733-9364, 131 (1), 42-51. 10.1061/(ASCE)0733-9364(2005)131:1(42) (Pubitemid 40135231)
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.1
, pp. 42-51
-
-
Oliveros, A.V.O.1
Fayek, A.R.2
-
47
-
-
0003669582
-
-
2nd Ed., Jossey-Bass Publishers, San Francisco.
-
Rea, L. M., and Parker, P. A. (1997). Designing and conducting survey research, 2nd Ed., Jossey-Bass Publishers, San Francisco.
-
(1997)
Designing and Conducting Survey Research
-
-
Rea, L.M.1
Parker, P.A.2
-
49
-
-
0342646258
-
Quantifying and apportioning delay on construction projects
-
0274-9696.
-
Schumacher, L. (1995). " Quantifying and apportioning delay on construction projects.." Cost Eng. 0274-9696, 37 (2), 11-13.
-
(1995)
Cost Eng.
, vol.37
, Issue.2
, pp. 11-13
-
-
Schumacher, L.1
-
50
-
-
0011771690
-
Delay claims in UK Contracts
-
0733-9364, (),. 10.1061/(ASCE)0733-9364(1997)123:3(238)
-
Scott, S. (1997). " Delay claims in UK Contracts.." J. Constr. Eng. Manage. 0733-9364, 123 (3), 238-244. 10.1061/(ASCE)0733-9364(1997)123: 3(238)
-
(1997)
J. Constr. Eng. Manage.
, vol.123
, Issue.3
, pp. 238-244
-
-
Scott, S.1
-
51
-
-
33744494885
-
A survey of the site records kept by construction supervisors
-
10.1080/014461999371574
-
Scott, S., and Assadi, S. (1999). " A survey of the site records kept by construction supervisors.." Journal of Construction Management and Economics, 17, 375-382. 10.1080/014461999371574
-
(1999)
Journal of Construction Management and Economics
, vol.17
, pp. 375-382
-
-
Scott, S.1
Assadi, S.2
-
52
-
-
13944258534
-
United Kingdom construction claims: Views of professionals
-
DOI 10.1061/(ASCE)0733-9364(2004)130:5(734)
-
Scott, S., and Harris, R. A. (2004). " United Kingdom construction claims: Views of professionals.." J. Constr. Eng. Manage. 0733-9364, 230 (5), 734-741. 10.1061/(ASCE)0733-9364(2004)130:5(734) (Pubitemid 40265339)
-
(2004)
Journal of Construction Engineering and Management
, vol.130
, Issue.5
, pp. 734-741
-
-
Scott, S.1
Harris, R.A.2
-
53
-
-
0003761866
-
-
2nd Ed., McGraw-Hill, New York.
-
Siegel, S., and Castellan, J. N., Jr. (1988). Nonparameteric statistics for the behavioral sciences, 2nd Ed., McGraw-Hill, New York.
-
(1988)
Nonparameteric Statistics for the Behavioral Sciences
-
-
Siegel, S.1
Castellan Jr., J.N.2
-
54
-
-
29244433489
-
-
Society of Construction Law.. "." Printmost (Southern) Ltd, England, 〈〉 (Aug. 22, 2005).
-
Society of Construction Law. (2002). " Delay and disruption protocol.." Printmost (Southern) Ltd, England, 〈 http://www. eotprotocol.com 〉 (Aug. 22, 2005).
-
(2002)
Delay and Disruption Protocol
-
-
-
56
-
-
0034225662
-
Schedule delay analysis
-
0274-9696.
-
Stumpf, G. R. (2000). " Schedule delay analysis.." Cost Eng. 0274-9696, 42 (7), 32-43.
-
(2000)
Cost Eng.
, vol.42
, Issue.7
, pp. 32-43
-
-
Stumpf, G.R.1
-
57
-
-
0004220565
-
-
Sage, Thousand Oaks, Calif.
-
Tashakorri, A., and Teddlie, C. (1998). Mixed methodology: Combing qualitative and quantitative approaches, Sage, Thousand Oaks, Calif.
-
(1998)
Mixed Methodology: Combing Qualitative and Quantitative Approaches
-
-
Tashakorri, A.1
Teddlie, C.2
-
58
-
-
33749571277
-
Improving the management of claims on construction contracts: Consultant's perspective
-
Vidogah, W., and Ndekugri, I. (1998). " Improving the management of claims on construction contracts: Consultant's perspective.." Constr. Manage. Econom., 12, 485-499.
-
(1998)
Constr. Manage. Econom.
, vol.12
, pp. 485-499
-
-
Vidogah, W.1
Ndekugri, I.2
-
60
-
-
0037411034
-
Structuring a delay and disruption claim: An application of cause-mapping and system dynamics
-
0377-2217,. 10.1016/S0377-2217(02)00372-7
-
Williams, T., Ackermann, F., and Eden, C. (2003). " Structuring a delay and disruption claim: An application of cause-mapping and system dynamics.." Eur. J. Oper. Res. 0377-2217, 148, 192-204. 10.1016/S0377-2217(02)00372-7
-
(2003)
Eur. J. Oper. Res.
, vol.148
, pp. 192-204
-
-
Williams, T.1
Ackermann, F.2
Eden, C.3
-
61
-
-
70450158184
-
Resolving complex delay claims
-
Whitehall Place, London.
-
Winter, J., and Johnson, P. (2000). " Resolving complex delay claims.." A report on a meeting of the UK Society of Construction Law, at the National Liberal Club, Whitehall Place, London.
-
(2000)
A Report on A Meeting of the UK Society of Construction Law, at the National Liberal Club
-
-
Winter, J.1
Johnson, P.2
-
62
-
-
0027610716
-
Construction decision support system for delay analysis
-
0733-9364, (),. 10.1061/(ASCE)0733-9364(1993)119:2(226)
-
Yates, J. K. (1993). " Construction decision support system for delay analysis.." J. Constr. Eng. Manage. 0733-9364, 119 (2), 226-244. 10.1061/(ASCE)0733-9364(1993)119:2(226)
-
(1993)
J. Constr. Eng. Manage.
, vol.119
, Issue.2
, pp. 226-244
-
-
Yates, J.K.1
|