-
1
-
-
0029273901
-
Joint vendor-buyer policy in JIT manufacturing
-
ADEROHUNMU, R., MOBOLURIN, A. and BRYSON, N., 1995, Joint vendor-buyer policy in JIT manufacturing. Journal of the Operational Research Society, 46, 375-385.
-
(1995)
Journal of the Operational Research Society
, vol.46
, pp. 375-385
-
-
Aderohunmu, R.1
Mobolurin, A.2
Bryson, N.3
-
2
-
-
0033207830
-
Modeling emergency supply flexibility in a two-echelon inventory system
-
ALFREDSSON, P. and VERRIJDT, J., 1999, Modeling emergency supply flexibility in a two-echelon inventory system. Management Science, 45, 1416-1431.
-
(1999)
Management Science
, vol.45
, pp. 1416-1431
-
-
Alfredsson, P.1
Verrijdt, J.2
-
3
-
-
0000700776
-
Modeling emergency lateral transshipments in inventory system
-
AXSÄTER, S., 1990, Modeling emergency lateral transshipments in inventory system. Management Science, 36, 1329-1338.
-
(1990)
Management Science
, vol.36
, pp. 1329-1338
-
-
Axsäter, S.1
-
4
-
-
84985846646
-
A joint economic-lot size model for purchaser and vendor
-
BANERJEE, A., 1986, A joint economic-lot size model for purchaser and vendor. Decision Sciences, 17, 1-7.
-
(1986)
Decision Sciences
, vol.17
, pp. 1-7
-
-
Banerjee, A.1
-
5
-
-
0028443964
-
A coordinated order-up-to inventory control policy for a single supplier and multiple buyers using electronic data interchange
-
BANERJEE, A. and BANERJEE, S., 1994, A coordinated order-up-to inventory control policy for a single supplier and multiple buyers using electronic data interchange. International Journal of Production Economics, 35, 85-89.
-
(1994)
International Journal of Production Economics
, vol.35
, pp. 85-89
-
-
Banerjee, A.1
Banerjee, S.2
-
6
-
-
3543067624
-
An integrated JIT inventory model
-
BANERJEE, A. and KIM, S. L., 1995, An integrated JIT inventory model. International Journal of Operations & Production Management, 15, 237-244.
-
(1995)
International Journal of Operations & Production Management
, vol.15
, pp. 237-244
-
-
Banerjee, A.1
Kim, S.L.2
-
7
-
-
0027624422
-
A cost saving technique for solving capacitated multi-stage lot-sizing problems
-
CHIU, H. N., 1993, A cost saving technique for solving capacitated multi-stage lot-sizing problems. Computers & Industrial Engineering, 24, 367-377.
-
(1993)
Computers & Industrial Engineering
, vol.24
, pp. 367-377
-
-
Chiu, H.N.1
-
8
-
-
0030206361
-
Controlling a divergent 2-echelon network with transshipments using the consistent appropriate share rationing policy
-
DIKS, E. B. and KOK, D., 1996, Controlling a divergent 2-echelon network with transshipments using the consistent appropriate share rationing policy. International Journal of Production Economics, 45, 369-379.
-
(1996)
International Journal of Production Economics
, vol.45
, pp. 369-379
-
-
Diks, E.1
Kok, B.D.2
-
9
-
-
0003557512
-
-
Wiley
-
DORNIER, P. P., ERNST, R., FENDER, M. and KOUVELIS, P., 1998, Global Operations and Logistics (Wiley), pp. 187-196.
-
(1998)
Global Operations and Logistics
, pp. 187-196
-
-
Dornier, P.P.1
Ernst, R.2
Fender, M.3
Kouvelis, P.4
-
10
-
-
0017416997
-
An integrated inventory model for a single-supplier single-customer problem
-
GOYAL, S. K., 1977, An integrated inventory model for a single-supplier single-customer problem. International Journal of Production Research, 15, 107-111.
-
(1977)
International Journal of Production Research
, vol.15
, pp. 107-111
-
-
Goyal, S.K.1
-
11
-
-
84985781712
-
A joint economic lot size model for purchaser and vendor: A comment
-
GOYAL, S. K., 1988, A joint economic lot size model for purchaser and vendor: a comment. Decision Sciences, 19, 236-241.
-
(1988)
Decision Sciences
, vol.19
, pp. 236-241
-
-
Goyal, S.K.1
-
12
-
-
0024715832
-
Integrated inventory models: The buyer-vendor coordination
-
GOYAL, S. K. and GUPTA, Y. P., 1989, Integrated inventory models: the buyer-vendor coordination. European Journal of Operational Research, 41, 261-269.
-
(1989)
European Journal of Operational Research
, vol.41
, pp. 261-269
-
-
Goyal, S.K.1
Gupta, Y.P.2
-
13
-
-
0031259399
-
Delivery delay variation in multi-echelon inventory problems
-
GRAMAN, G. A. and ROGERS, D. F., 1997, Delivery delay variation in multi-echelon inventory problems. Journal of the Operational Research Society, 48, 1029-1036.
-
(1997)
Journal of the Operational Research Society
, vol.48 1
, pp. 029-1036
-
-
Graman, G.A.1
Rogers, D.F.2
-
14
-
-
0034298707
-
Modeling and analysis of supply chain management systems: An editorial overview
-
GUNASEKAREN, A., MACBETH, D. K. and LAMMING, R., 2000, Modeling and analysis of supply chain management systems: an editorial overview, Journal of the Operational Research Society, 51, 1112-1115.
-
(2000)
Journal of the Operational Research Society
, vol.51
, pp. 1112-1115
-
-
Gunasekaren, A.1
Macbeth, D.K.2
Lamming, R.3
-
15
-
-
0031103642
-
Implementation for JIT purchasing: An integrated approach
-
HA, D. and KIM, S. L., 1997, Implementation for JIT purchasing: an integrated approach. Production Planning & Control, 8, 152-157.
-
(1997)
Production Planning & Control
, vol.8
, pp. 152-157
-
-
Ha, D.1
Kim, S.L.2
-
16
-
-
3543130792
-
Transition to just-in-time purchasing handling uncertain deliveries with vendor-purchaser co-operation
-
KELLE, P. and MILLER, P. A., 1998, Transition to just-in-time purchasing handling uncertain deliveries with vendor-purchaser co-operation. International Journal of Operations & Production Management, 18, 53-65.
-
(1998)
International Journal of Operations & Production Management
, vol.18
, pp. 53-65
-
-
Kelle, P.1
Miller, P.A.2
-
17
-
-
26444479778
-
Optimization by simulated annealing
-
KIRKPATRICK, S., GELATT, C. D. and VECCHI, M. P., 1983, Optimization by simulated annealing. Science, 220, 671-680.
-
(1983)
Science
, vol.220
, pp. 671-680
-
-
Kirkpatrick, S.1
Gelatt, C.D.2
Vecchi, M.P.3
-
18
-
-
0033078591
-
Some new results on simulated annealing applied to the job shop scheduling problem
-
KOLONKO, M., 1999, Some new results on simulated annealing applied to the job shop scheduling problem. European Journal of Operational Research, 113, 123-136.
-
(1999)
European Journal of Operational Research
, vol.113
, pp. 123-136
-
-
Kolonko, M.1
-
19
-
-
0039875027
-
A facilities in series capacity constrained dynamic lot-size model
-
LAMBRECHT, M. and VANDER, E. J., 1978, A facilities in series capacity constrained dynamic lot-size model. European Journal of Operational Research, 2, 42-49.
-
(1978)
European Journal of Operational Research
, vol.2
, pp. 42-49
-
-
Lambrecht, M.1
Vander, E.J.2
-
20
-
-
0032650280
-
Applying simulated annealing to the open shop scheduling problem
-
LIAW, C. F., 1999, Applying simulated annealing to the open shop scheduling problem. IIE Transactions, 31, 457-465.
-
(1999)
IIE Transactions
, vol.31
, pp. 457-465
-
-
Liaw, C.F.1
-
21
-
-
5744249209
-
Equation of state calculations by fast computing machines
-
METROPOLIS, N. A., ROSENBLUTH, A., ROSENBLUTH, M., TELLER, A. and TELLER, E., 1953, Equation of state calculations by fast computing machines. Journal of chemical Physics, 21, 1087-1095.
-
(1953)
Journal of Chemical Physics
, vol.21
, pp. 1087-1095
-
-
Metropolis, N.A.1
Rosenbluth, A.2
Rosenbluth, M.3
Teller, A.4
Teller, E.5
-
22
-
-
0036604813
-
Simultaneous lotsizing and scheduling on parallel machines
-
MEYR, H., 2001, Simultaneous lotsizing and scheduling on parallel machines. European Journal of Operational Research, 139, 277-292.
-
(2001)
European Journal of Operational Research
, vol.139
, pp. 277-292
-
-
Meyr, H.1
-
23
-
-
21144479287
-
Dealing with the uncertainties of manufacturing: Flexibility, buffers and integration
-
NEWMAN, W. R., HANNA, M. and MAFFEI, M. J., 1993, Dealing with the uncertainties of manufacturing: flexibility, buffers and integration. International Journal of Operations & Production Management, 13, 19-34.
-
(1993)
International Journal of Operations & Production Management
, vol.13
, pp. 19-34
-
-
Newman, W.R.1
Hanna, M.2
Maffei, M.J.3
-
24
-
-
0034300834
-
Scheduling multipurpose batch process industries with no-wait restrictions by simulated annealing
-
RAAYMAKERS, W. H. M. and HOOGEVEEN, J. A., 2000, Scheduling multipurpose batch process industries with no-wait restrictions by simulated annealing. European Journal of Operational Research, 126, 131-151.
-
(2000)
European Journal of Operational Research
, vol.126
, pp. 131-151
-
-
Raaymakers, W.H.M.1
Hoogeveen, J.A.2
-
25
-
-
0032114853
-
A quantitative approach to estimate the size of the time buffer in the theory of constraints
-
RADOVILSKY, Z. D., 1998, A quantitative approach to estimate the size of the time buffer in the theory of constraints. International Journal of Production Economics, 55, 113-119.
-
(1998)
International Journal of Production Economics
, vol.55
, pp. 113-119
-
-
Radovilsky, Z.D.1
-
26
-
-
0000128577
-
Sole versus dual sourcing in stochastic lead time (s, Q) inventory models
-
RAMASESH, R. A., ORD, J. K., HAYYA, J. C. and PAN, A. C., 1991, Sole versus dual sourcing in stochastic lead time (s, Q) inventory models. Management Science, 37, 428-443.
-
(1991)
Management Science
, vol.37
, pp. 428-443
-
-
Ramasesh, R.A.1
Ord, J.K.2
Hayya, J.C.3
Pan, A.C.4
-
27
-
-
0032599587
-
Scheduling a manufacturing plant using a simulated annealing and simulation
-
REYNOLDS, A. P. and MCKEOWN, G. P., 1999, Scheduling a manufacturing plant using a simulated annealing and simulation. Computers & Industrial Engineering, 37, 63-67.
-
(1999)
Computers & Industrial Engineering
, vol.37
, pp. 63-67
-
-
Reynolds, A.P.1
McKeown, G.P.2
-
28
-
-
0025403717
-
Optimal and approximate polices in multiperiod, multilocation inventory models with transshipments
-
ROBINSON, L. W., 1990, Optimal and approximate polices in multiperiod, multilocation inventory models with transshipments. Operations Research, 38, 278-295.
-
(1990)
Operations Research
, vol.38
, pp. 278-295
-
-
Robinson, L.W.1
-
29
-
-
0033344267
-
A review of integrated analysis of production-distribution systems
-
SARMIENTO, A. M. and NAGI, R., 1999, A review of integrated analysis of production-distribution systems. IIE Transactions, 31, 1061-1074.
-
(1999)
IIE Transactions
, vol.31
, pp. 1061-1074
-
-
Sarmiento, A.M.1
Nagi, R.2
-
30
-
-
0005276554
-
-
Boca Raton, FL: St. Lucie Press
-
SCHRAGENHEIM, E. and DETTMER, H. W., 2001, Manufacturing at Warp Speed Optimizing Supply Chain Financial Performance (Boca Raton, FL: St. Lucie Press), pp. 123-146.
-
(2001)
Manufacturing at Warp Speed Optimizing Supply Chain Financial Performance
, pp. 123-146
-
-
Schragenheim, E.1
Dettmer, H.W.2
-
31
-
-
0032627684
-
The capacitated lot sizing problem with setup carry-over
-
Spx, C. R. and GAO, Y., 1999, The capacitated lot sizing problem with setup carry-over. IIE Transactions, 31, 173-181.
-
(1999)
IIE Transactions
, vol.31
, pp. 173-181
-
-
Sox, C.R.1
Gao, Y.2
-
32
-
-
0001854683
-
Pooling in multi-location periodic inventory distribution systems
-
TAGARAS, G., 1999, Pooling in multi-location periodic inventory distribution systems. Omega, 21, 39-59.
-
(1999)
Omega
, vol.21
, pp. 39-59
-
-
Tagaras, G.1
-
33
-
-
0000932719
-
Pooling in two-location inventory systems with non-negligible replenishment lead times
-
TAGARAS, G. and COHEN, M. A., 1992, Pooling in two-location inventory systems with non-negligible replenishment lead times. Management Science, 38, 1067-1083.
-
(1992)
Management Science
, vol.38
, pp. 1067-1083
-
-
Tagaras, G.1
Cohen, M.A.2
-
34
-
-
0031119856
-
Strategic production-distribution models: A critical review with emphasis on global supply chain models
-
VIDAL, C. J. and GOETSCHALCKX, M., 1997, Strategic production-distribution models: a critical review with emphasis on global supply chain models. European Journal of Operational Research, 98, 1-18.
-
(1997)
European Journal of Operational Research
, vol.98
, pp. 1-18
-
-
Vidal, C.J.1
Goetschalckx, M.2
-
35
-
-
0023419888
-
Planned leadtimes for serial production systems
-
YANO, C. A., 1987, Planned leadtimes for serial production systems. IIE Transactions, 19, 300-307.
-
(1987)
IIE Transactions
, vol.19
, pp. 300-307
-
-
Yano, C.A.1
-
36
-
-
0018015469
-
Order-level inventory systems with independent stochastic leadtimes
-
ZALKIND, D., 1978, Order-level inventory systems with independent stochastic leadtimes. Management Science, 24, 1384-1392.
-
(1978)
Management Science
, vol.24
, pp. 1384-1392
-
-
Zalkind, D.1
|