The economic production quantity (EPQ) with shortage derived algebraically
-
Cárdenas-Barrón L.E. The economic production quantity (EPQ) with shortage derived algebraically. International Journal of Production Economics 70 3 (2001) 289-292
-
(2001)
International Journal of Production Economics
, vol.70
, Issue.3
, pp. 289-292
-
-
Cárdenas-Barrón, L.E.1
-
3
-
-
55649099841
-
Optimal manufacturing batch size with rework in a single-stage production system-a simple derivation
-
Cárdenas-Barrón L.E. Optimal manufacturing batch size with rework in a single-stage production system-a simple derivation. Computers & Industrial Engineering 55 4 (2008) 758-765
-
(2008)
Computers & Industrial Engineering
, vol.55
, Issue.4
, pp. 758-765
-
-
Cárdenas-Barrón, L.E.1
-
4
-
-
0013113585
-
A dispute on James R. Evans' "An efficient implementation of the Wagner Whitin algorithm for dynamic lot-sizing", Journal of Operations Management, vol. 5, no. 2, February 1985
-
Chong P.S. A dispute on James R. Evans' "An efficient implementation of the Wagner Whitin algorithm for dynamic lot-sizing", Journal of Operations Management, vol. 5, no. 2, February 1985. Journal of Operations Management 7 1-2 (1987) 27-31
-
(1987)
Journal of Operations Management
, vol.7
, Issue.1-2
, pp. 27-31
-
-
Chong, P.S.1
-
5
-
-
0000975712
-
An efficient implementation of the Wagner-Whitin algorithm for dynamic lot-sizing
-
Evans J.R. An efficient implementation of the Wagner-Whitin algorithm for dynamic lot-sizing. Journal of Operations Management 5 2 (1985) 229-235
-
(1985)
Journal of Operations Management
, vol.5
, Issue.2
, pp. 229-235
-
-
Evans, J.R.1
-
6
-
-
38249022926
-
A note on solving the concave cost dynamic lot-sizing problem in almost linear time
-
Evans J.R., Saydam S., and McKnew M. A note on solving the concave cost dynamic lot-sizing problem in almost linear time. Journal of Operations Management 8 2 (1989) 159-167
-
(1989)
Journal of Operations Management
, vol.8
, Issue.2
, pp. 159-167
-
-
Evans, J.R.1
Saydam, S.2
McKnew, M.3
-
8
-
-
0010308943
-
An improved implementation of the Wagner-Whitin algorithm
-
Heady R.B., and Zhu Z. An improved implementation of the Wagner-Whitin algorithm. Production and Operations Management 3 1 (1994) 55-63
-
(1994)
Production and Operations Management
, vol.3
, Issue.1
, pp. 55-63
-
-
Heady, R.B.1
Zhu, Z.2
-
9
-
-
26044456161
-
Adaptive genetic algorithm for lot-sizing problem with self-adjustment operation rate
-
Hop N.V., and Tabucanon M.T. Adaptive genetic algorithm for lot-sizing problem with self-adjustment operation rate. International Journal of Production Economics 98 2 (2005) 129-135
-
(2005)
International Journal of Production Economics
, vol.98
, Issue.2
, pp. 129-135
-
-
Hop, N.V.1
Tabucanon, M.T.2
-
11
-
-
0023581408
-
A fast microcomputer program for ordering using the Wagner-Whitin algorithm
-
Saydam S., and McKnew M. A fast microcomputer program for ordering using the Wagner-Whitin algorithm. Production and Inventory Management Journal 28 4 (1987) 15-19
-
(1987)
Production and Inventory Management Journal
, vol.28
, Issue.4
, pp. 15-19
-
-
Saydam, S.1
McKnew, M.2
-
12
-
-
0002657699
-
A heuristic for selecting lot size requirements for the case of a deterministic time-varying demand rate with discrete opportunities for replenishment.
-
Silver E.A., and Meal H.A. A heuristic for selecting lot size requirements for the case of a deterministic time-varying demand rate with discrete opportunities for replenishment. Production and Inventory Management Journal 4 2 (1973) 64-74
-
(1973)
Production and Inventory Management Journal
, vol.4
, Issue.2
, pp. 64-74
-
-
Silver, E.A.1
Meal, H.A.2
-
14
-
-
0001962762
-
Dynamic version of the economic lot size model
-
Wagner H.M., and Whitin T.M. Dynamic version of the economic lot size model. Management Science 5 1 (1958) 89-96
-
(1958)
Management Science
, vol.5
, Issue.1
, pp. 89-96
-
-
Wagner, H.M.1
Whitin, T.M.2
|