메뉴 건너뛰기




Volumn 5601 LNCS, Issue PART 1, 2009, Pages 255-264

A genetic algorithm for the open shop problem with uncertain durations

Author keywords

[No Author keywords available]

Indexed keywords

BENCH-MARK PROBLEMS; EXPECTED MAKESPAN; FUZZY DURATIONS; FUZZY NUMBERS; GENETIC APPROACH; GENETIC OPERATORS; GREEDY HEURISTICS; OPEN-SHOP PROBLEM;

EID: 70350669892     PISSN: 03029743     EISSN: 16113349     Source Type: Book Series    
DOI: 10.1007/978-3-642-02264-7_27     Document Type: Conference Paper
Times cited : (10)

References (20)
  • 1
    • 0032097675 scopus 로고    scopus 로고
    • Classical and new heuristics for the open-shop problem: A computational evaluation
    • Gúeret, C., Prins, C.: Classical and new heuristics for the open-shop problem: A computational evaluation. European Journal of Operational Research 107, 306-314 (1998)
    • (1998) European Journal of Operational Research , vol.107 , pp. 306-314
    • Gúeret, C.1    Prins, C.2
  • 2
    • 0034230637 scopus 로고    scopus 로고
    • A hybrid genetic algorithm for the open shop scheduling problem
    • Liaw, C.F.: A hybrid genetic algorithm for the open shop scheduling problem. European Journal of Operational Research 124, 28-42 (2000)
    • (2000) European Journal of Operational Research , vol.124 , pp. 28-42
    • Liaw, C.F.1
  • 3
    • 40249116814 scopus 로고    scopus 로고
    • A new particle swarm optimization for the open shop scheduling problem
    • Sha, D.Y., Cheng-Yu, H.: A new particle swarm optimization for the open shop scheduling problem. Computers & Operations Research 35, 3243-3261 (2008)
    • (2008) Computers & Operations Research , vol.35 , pp. 3243-3261
    • Sha, D.Y.1    Cheng-Yu, H.2
  • 4
    • 13444269168 scopus 로고    scopus 로고
    • Project scheduling under uncertainty: Survey and research potentials
    • Herroelen, W., Leus, R.: Project scheduling under uncertainty: Survey and research potentials. European Journal of Operational Research 165, 289-306 (2005)
    • (2005) European Journal of Operational Research , vol.165 , pp. 289-306
    • Herroelen, W.1    Leus, R.2
  • 5
    • 0037410423 scopus 로고    scopus 로고
    • Fuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledge
    • Dubois, D., Fargier, H., Fortemps, P.: Fuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledge. European Journal of Operational Research 147, 231-252 (2003)
    • (2003) European Journal of Operational Research , vol.147 , pp. 231-252
    • Dubois, D.1    Fargier, H.2    Fortemps, P.3
  • 8
    • 0031268178 scopus 로고    scopus 로고
    • Jobshop scheduling with imprecise durations: A fuzzy approach
    • Fortemps, P.: Jobshop scheduling with imprecise durations: a fuzzy approach. IEEE Transactions of Fuzzy Systems 7, 557-569 (1997)
    • (1997) IEEE Transactions of Fuzzy Systems , vol.7 , pp. 557-569
    • Fortemps, P.1
  • 11
    • 41149097015 scopus 로고    scopus 로고
    • Accessing feasible space in a generalized job shop scheduling problem with the fuzzy processing times: A fuzzy-neural approach
    • Tavakkoli-Moghaddam, R., Safei, N., Kah, M.: Accessing feasible space in a generalized job shop scheduling problem with the fuzzy processing times: a fuzzy-neural approach. Journal of the Operational Research Society 59, 431-442 (2008)
    • (2008) Journal of the Operational Research Society , vol.59 , pp. 431-442
    • Tavakkoli-Moghaddam, R.1    Safei, N.2    Kah, M.3
  • 13
    • 0036685786 scopus 로고    scopus 로고
    • Expected value of fuzzy variable and fuzzy expected value models
    • Liu, B., Liu, Y.K.: Expected value of fuzzy variable and fuzzy expected value models. IEEE Transactions on Fuzzy Systems 10, 445-450 (2002)
    • (2002) IEEE Transactions on Fuzzy Systems , vol.10 , pp. 445-450
    • Liu, B.1    Liu, Y.K.2
  • 14
    • 0032320903 scopus 로고    scopus 로고
    • An iterative improvement approach for the nonpreemptive open shop scheduling problem
    • Liaw, C.F.: An iterative improvement approach for the nonpreemptive open shop scheduling problem. European Journal of Operational Research 111, 509-517 (1998)
    • (1998) European Journal of Operational Research , vol.111 , pp. 509-517
    • Liaw, C.F.1
  • 15
    • 0033080204 scopus 로고    scopus 로고
    • A tabu search algorithm for the open shop scheduling problem
    • Liaw, C.F.: A tabu search algorithm for the open shop scheduling problem. Computers and Operations Research 26, 109-126 (1999)
    • (1999) Computers and Operations Research , vol.26 , pp. 109-126
    • Liaw, C.F.1
  • 16
    • 7444265400 scopus 로고    scopus 로고
    • Heuristic Rules and Genetic Algorithms for Open Shop Scheduling Problem
    • Conejo, R, Urretavizcaya, M, Ṕerez-de-la-Cruz, J.-L, eds, CAEPIA/TTIA 2003, Springer, Heidelberg
    • Puente, J., Diez, H., Varela, R., Vela, C., Hidalgo, L.: Heuristic Rules and Genetic Algorithms for Open Shop Scheduling Problem. In: Conejo, R., Urretavizcaya, M., Ṕerez-de-la-Cruz, J.-L. (eds.) CAEPIA/TTIA 2003. LNCS(LNAI), vol. 3040, pp. 394-403. Springer, Heidelberg (2004)
    • (2004) LNCS(LNAI , vol.3040 , pp. 394-403
    • Puente, J.1    Diez, H.2    Varela, R.3    Vela, C.4    Hidalgo, L.5
  • 17
    • 0036641319 scopus 로고    scopus 로고
    • Local search with constraint propagation and conflict-based heuristics
    • Jussien, N., Lhomme, O.: Local search with constraint propagation and conflict-based heuristics. Artificial Intelligence 139, 21-45 (2002)
    • (2002) Artificial Intelligence , vol.139 , pp. 21-45
    • Jussien, N.1    Lhomme, O.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.