-
1
-
-
26444559586
-
An evolutionary approach to designing and solving fuzzy job-shop problems
-
I. González Rodríguez, C. R. Vela, and J. Puente, "An evolutionary approach to designing and solving fuzzy job-shop problems," in Proc. IWINAC, 2005, vol. 3562, pp. 74-83.
-
(2005)
Proc. IWINAC
, vol.3562
, pp. 74-83
-
-
González Rodríguez, I.1
Vela, C.R.2
Puente, J.3
-
6
-
-
0033093715
-
Production scheduling and rescheduling with genetic algorithms
-
C. Bierwirth and D. C. Mattfeld, "Production scheduling and rescheduling with genetic algorithms," Evol. Comput., vol. 7, no. 1, pp. 1-17, 1999.
-
(1999)
Evol. Comput
, vol.7
, Issue.1
, pp. 1-17
-
-
Bierwirth, C.1
Mattfeld, D.C.2
-
7
-
-
0037448778
-
A knowledge-based evolutionary strategy for scheduling problems with bottlenecks
-
Feb
-
R. Varela, C. R. Vela, J. Puente, and A. Gómez, "A knowledge-based evolutionary strategy for scheduling problems with bottlenecks," Eur. J. Oper Res., vol. 145, no. 1, pp. 57-71, Feb. 2003.
-
(2003)
Eur. J. Oper Res
, vol.145
, Issue.1
, pp. 57-71
-
-
Varela, R.1
Vela, C.R.2
Puente, J.3
Gómez, A.4
-
8
-
-
21044438483
-
Evolutionary optimization in uncertain environments - A survey
-
Jun
-
Y. Jin and J. Branke, "Evolutionary optimization in uncertain environments - A survey," IEEE Trans. Evol. Comput., vol. 9, no. 3, pp. 303-317, Jun. 2005.
-
(2005)
IEEE Trans. Evol. Comput
, vol.9
, Issue.3
, pp. 303-317
-
-
Jin, Y.1
Branke, J.2
-
9
-
-
27844476311
-
Anticipation and flexibility in dynamic scheduling
-
Aug
-
J. Branke and D. Mattfeld, "Anticipation and flexibility in dynamic scheduling," Int. J. Prod. Res., vol. 43, no. 15, pp. 3103-3129, Aug. 2005.
-
(2005)
Int. J. Prod. Res
, vol.43
, Issue.15
, pp. 3103-3129
-
-
Branke, J.1
Mattfeld, D.2
-
10
-
-
30844449000
-
Application of genetic algorithms with dominant genes in a distributed scheduling problem in flexible manufacturing systems
-
F. Chan, S. Chung, and P. Chan, "Application of genetic algorithms with dominant genes in a distributed scheduling problem in flexible manufacturing systems," Int. J. Prod. Res., vol. 44, no. 3, pp. 523-543, 2006.
-
(2006)
Int. J. Prod. Res
, vol.44
, Issue.3
, pp. 523-543
-
-
Chan, F.1
Chung, S.2
Chan, P.3
-
11
-
-
35048882391
-
An effective chromosome representation for evolving flexible job shop schedules
-
J. Tay and D. Wibowo, "An effective chromosome representation for evolving flexible job shop schedules," in Proc. GECCO, 2004, vol. 3103, pp. 210-221.
-
(2004)
Proc. GECCO
, vol.3103
, pp. 210-221
-
-
Tay, J.1
Wibowo, D.2
-
12
-
-
33646400835
-
Flexible job-shop scheduling problem under resource constraints
-
Jun
-
F. Chan, T. Wong, and P. Chan, "Flexible job-shop scheduling problem under resource constraints," Int. J. Prod. Res., vol. 44, no. 11, pp. 2071-2089, Jun. 2006.
-
(2006)
Int. J. Prod. Res
, vol.44
, Issue.11
, pp. 2071-2089
-
-
Chan, F.1
Wong, T.2
Chan, P.3
-
13
-
-
0037410423
-
Fuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledge
-
Jun
-
D. Dubois, H. Fargier, and P. Fortemps, "Fuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledge," Eur. J. Oper. Res., vol. 147, no. 2, pp. 231-252, Jun. 2003.
-
(2003)
Eur. J. Oper. Res
, vol.147
, Issue.2
, pp. 231-252
-
-
Dubois, D.1
Fargier, H.2
Fortemps, P.3
-
14
-
-
33746224638
-
Scheduling Under Fuzziness
-
R. Slowiñski and M. Hapke, Eds. Heidelberg, Germany: Physica-Verlag
-
Scheduling Under Fuzziness, ser. Studies in Fuzziness and Soft Computing, vol. 37, R. Slowiñski and M. Hapke, Eds. Heidelberg, Germany: Physica-Verlag, 2000.
-
(2000)
ser. Studies in Fuzziness and Soft Computing
, vol.37
-
-
-
15
-
-
0031268178
-
Jobshop scheduling with imprecise durations: A fuzzy approach
-
Nov
-
P. Fortemps, "Jobshop scheduling with imprecise durations: A fuzzy approach," IEEE Trans. Fuzzy Syst., vol. 5, no. 4, pp. 557-569, Nov. 1997.
-
(1997)
IEEE Trans. Fuzzy Syst
, vol.5
, Issue.4
, pp. 557-569
-
-
Fortemps, P.1
-
16
-
-
0036685625
-
Fuzzy job-shop scheduling based on ranking level (λ, 1) interval-valued fuzzy numbers
-
Aug
-
F.-T. Lin, "Fuzzy job-shop scheduling based on ranking level (λ, 1) interval-valued fuzzy numbers," IEEE Trans. Fuzzy Syst., vol. 10, no. 4, pp. 510-522, Aug. 2000.
-
(2000)
IEEE Trans. Fuzzy Syst
, vol.10
, Issue.4
, pp. 510-522
-
-
Lin, F.-T.1
-
17
-
-
0032592176
-
An efficient genetic algorithm for job-shop scheduling problems with fuzzy processing time and fuzzy duedate
-
Apr
-
M. Sakawa and T. Mori, "An efficient genetic algorithm for job-shop scheduling problems with fuzzy processing time and fuzzy duedate," Comput. Ind. Eng., vol. 36, no. 2, pp. 325-341, Apr. 1999.
-
(1999)
Comput. Ind. Eng
, vol.36
, Issue.2
, pp. 325-341
-
-
Sakawa, M.1
Mori, T.2
-
18
-
-
0033881797
-
Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy duedate through genetic algorithms
-
Jan
-
M. Sakawa and R. Kubota, "Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy duedate through genetic algorithms," Eur. J. Oper Res., vol. 120, no. 2, pp. 393-407, Jan. 2000.
-
(2000)
Eur. J. Oper Res
, vol.120
, Issue.2
, pp. 393-407
-
-
Sakawa, M.1
Kubota, R.2
-
19
-
-
26944476629
-
A fuzzy genetic algorithm for real-world job shop scheduling
-
C. Fayad and S. Petrovic, "A fuzzy genetic algorithm for real-world job shop scheduling," in Proc. Innovations Appl. Artif. Intell., 2005, vol. 3533, pp. 524-533.
-
(2005)
Proc. Innovations Appl. Artif. Intell
, vol.3533
, pp. 524-533
-
-
Fayad, C.1
Petrovic, S.2
-
20
-
-
0742321202
-
-
G. Celano, A. Costa, and S. Fichera, An evolutionary algorithm for pure fuzzy flowshop scheduling problems, Int. J. Uncertain. Fuzziness Knowl.-Based Syst., 11, no. 6, pp. 655-669, Dec. 2003.
-
G. Celano, A. Costa, and S. Fichera, "An evolutionary algorithm for pure fuzzy flowshop scheduling problems," Int. J. Uncertain. Fuzziness Knowl.-Based Syst., vol. 11, no. 6, pp. 655-669, Dec. 2003.
-
-
-
-
21
-
-
40749136762
-
A new approach to two-machine flow shop problem with uncertain processing time
-
B. Ayyub and N. Attoh-Okine Eds
-
S. Petrovic and X. Song, "A new approach to two-machine flow shop problem with uncertain processing time," in Proc. 4th ISUMA, B. Ayyub and N. Attoh-Okine Eds., 2003, pp. 110-115.
-
(2003)
Proc. 4th ISUMA
, pp. 110-115
-
-
Petrovic, S.1
Song, X.2
-
22
-
-
0036683729
-
On the sure criticality of tasks in activity networks with imprecise durations
-
Aug
-
S. Chanas, D. Dubois, and P. Zieliński, "On the sure criticality of tasks in activity networks with imprecise durations," IEEE Trans. Syst., Man, Cybern. B, Cybern., vol. 32, no. 4, pp. 393-407, Aug. 2002.
-
(2002)
IEEE Trans. Syst., Man, Cybern. B, Cybern
, vol.32
, Issue.4
, pp. 393-407
-
-
Chanas, S.1
Dubois, D.2
Zieliński, P.3
-
24
-
-
0342526931
-
A review of some methods for ranking fuzzy subsets
-
D. Dubois, H. Prade, and R. Yager, Eds. Amsterdam, The Netherlands: Morgan Kaufmann
-
G. Bortolan and R. Degani, "A review of some methods for ranking fuzzy subsets," in Readings in Fuzzy Sets for Intelligence Systems, D. Dubois, H. Prade, and R. Yager, Eds. Amsterdam, The Netherlands: Morgan Kaufmann, 1993, pp. 149-158.
-
(1993)
Readings in Fuzzy Sets for Intelligence Systems
, pp. 149-158
-
-
Bortolan, G.1
Degani, R.2
-
26
-
-
0022101320
-
A review of fuzzy set aggregation connectives
-
Jul./Aug
-
D. Dubois and H. Prade, "A review of fuzzy set aggregation connectives," Inf. Sci., vol. 36, no. 1/2, pp. 85-121, Jul./Aug. 1985.
-
(1985)
Inf. Sci
, vol.36
, Issue.1-2
, pp. 85-121
-
-
Dubois, D.1
Prade, H.2
-
27
-
-
0000259996
-
Weighted minimum and maximum operations in fuzzy set theory
-
Sep
-
D. Dubois and H. Prade, "Weighted minimum and maximum operations in fuzzy set theory," Inf. Sci., vol. 39, no. 2, pp. 205-210, Sep. 1986.
-
(1986)
Inf. Sci
, vol.39
, Issue.2
, pp. 205-210
-
-
Dubois, D.1
Prade, H.2
-
28
-
-
0346636333
-
Decision-making in a fuzzy environment
-
Dec
-
R. E. Bellman and L. A. Zadeh, "Decision-making in a fuzzy environment," Manage. Sci., vol. 17, no. 4, pp. 141-164, Dec. 1970.
-
(1970)
Manage. Sci
, vol.17
, Issue.4
, pp. 141-164
-
-
Bellman, R.E.1
Zadeh, L.A.2
-
29
-
-
0000131281
-
Algorithms for solving production scheduling problems
-
Jul, Aug
-
B. Giffler and G. L. Thomson, "Algorithms for solving production scheduling problems," Oper Res., vol. 8, no. 4, pp. 487-503, Jul./ Aug. 1960.
-
(1960)
Oper Res
, vol.8
, Issue.4
, pp. 487-503
-
-
Giffler, B.1
Thomson, G.L.2
-
30
-
-
0035215629
-
Real-time task scheduling with fuzzy deadlines and processing times
-
Jan
-
M. Litoiu and R. Tadei, "Real-time task scheduling with fuzzy deadlines and processing times," Fuzzy Sets Syst., vol. 117, no. 1, pp. 23-45, Jan. 2001.
-
(2001)
Fuzzy Sets Syst
, vol.117
, Issue.1
, pp. 23-45
-
-
Litoiu, M.1
Tadei, R.2
-
31
-
-
1242310012
-
Possible and necessary optimality of solutions in the single machine scheduling problem with fuzzy parameters
-
Mar
-
S. Chanas and A. Kasperski, "Possible and necessary optimality of solutions in the single machine scheduling problem with fuzzy parameters," Fuzzy Sets Syst., vol. 142, no. 3, pp. 359-371, Mar. 2004.
-
(2004)
Fuzzy Sets Syst
, vol.142
, Issue.3
, pp. 359-371
-
-
Chanas, S.1
Kasperski, A.2
-
32
-
-
21144440772
-
A genetic algorithm for hybrid flow-shop scheduling with multiprocessor tasks
-
Jul
-
C. Oguz and F. Ercan, "A genetic algorithm for hybrid flow-shop scheduling with multiprocessor tasks," J. Scheduling, vol. 8, no. 4, pp. 321-351, Jul. 2005.
-
(2005)
J. Scheduling
, vol.8
, Issue.4
, pp. 321-351
-
-
Oguz, C.1
Ercan, F.2
|