메뉴 건너뛰기




Volumn 1, Issue , 2009, Pages 240-243

Short term load forecasting by using neural network structure

Author keywords

Daily load; Load forecasting; Neural network; Short term load

Indexed keywords

DAILY LOAD; DATA BASE; ELECTRICAL INDUSTRY; ELECTRICITY MARKET; LOAD FORECASTING; MATLAB ENVIRONMENT; MAXIMUM ERROR; MULTI-LAYER PERCEPTRON NEURAL NETWORKS; NEURAL NETWORK STRUCTURES; POWER SYSTEMS; SHORT TERM LOAD; SHORT TERM LOAD FORECASTING; TIME-ACCURATE; TIME-CONSUMING TASKS; VISUAL BASIC;

EID: 70350046930     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/ECTICON.2009.5137001     Document Type: Conference Paper
Times cited : (4)

References (12)
  • 1
    • 0034186817 scopus 로고    scopus 로고
    • Short-term load forecasting for special days in anomalous load conditions using neural networks and fuzzy inference method
    • K. Kim, H. S. Youn, and Y. C. Kang, "Short-term load forecasting for special days in anomalous load conditions using neural networks and fuzzy inference method," IEEE Trans. Power Syst., vol. 15, no. 2, pp. 559-565, 2000.
    • (2000) IEEE Trans. Power Syst , vol.15 , Issue.2 , pp. 559-565
    • Kim, K.1    Youn, H.S.2    Kang, Y.C.3
  • 2
    • 0025519319 scopus 로고
    • A regression-based approach to short-term load forecasting
    • A. D. Papalexopoulos and T. C. Hesterberg, "A regression-based approach to short-term load forecasting," IEEE Trans. Power Syst., vol. 5, no. 4, pp. 1535-1550, 1990.
    • (1990) IEEE Trans. Power Syst , vol.5 , Issue.4 , pp. 1535-1550
    • Papalexopoulos, A.D.1    Hesterberg, T.C.2
  • 3
    • 0028546825 scopus 로고
    • Regression based peak load forecasting using a transformation technique
    • T. Haida and S. Muto, "Regression based peak load forecasting using a transformation technique," IEEE Trans. Power Syst., vol. 9, no. 4, pp. 1788-1794, 1994.
    • (1994) IEEE Trans. Power Syst , vol.9 , Issue.4 , pp. 1788-1794
    • Haida, T.1    Muto, S.2
  • 4
    • 0027590291 scopus 로고
    • A generalized knowledge-based short term load-forecasting technique
    • S. Rahman and O. Hazim, "A generalized knowledge-based short term load-forecasting technique", IEEE Trans. Power Syst., vol. 8, no. 2, pp. 508-514, 1993.
    • (1993) IEEE Trans. Power Syst , vol.8 , Issue.2 , pp. 508-514
    • Rahman, S.1    Hazim, O.2
  • 5
    • 0037505508 scopus 로고    scopus 로고
    • Short-term load forecasting via ARMA model identification including nongaussian process considerations
    • S. J. Huang and K. R. Shih, "Short-term load forecasting via ARMA model identification including nongaussian process considerations", IEEE Trans. Power Syst., vol. 18, no. 2, pp. 673-679, 2003.
    • (2003) IEEE Trans. Power Syst , vol.18 , Issue.2 , pp. 673-679
    • Huang, S.J.1    Shih, K.R.2
  • 6
    • 0036577946 scopus 로고    scopus 로고
    • A data mining approach for spatial modeling in small area load forecast
    • H.Wu and C. Lu, "A data mining approach for spatial modeling in small area load forecast," IEEE Trans. Power Syst., vol. 17, no. 2, pp. 516-521, 2003.
    • (2003) IEEE Trans. Power Syst , vol.17 , Issue.2 , pp. 516-521
    • Wu, H.1    Lu, C.2
  • 7
    • 0035248045 scopus 로고    scopus 로고
    • Neural networks for short-term load forecasting: A review and evaluation
    • H. S. Hippert, C. E. Pedreira, and R. C. Souza, "Neural networks for short-term load forecasting: A review and evaluation," IEEE Trans.Power Syst., vol. 16, no. 1, pp. 44-55, 2001.
    • (2001) IEEE Trans.Power Syst , vol.16 , Issue.1 , pp. 44-55
    • Hippert, H.S.1    Pedreira, C.E.2    Souza, R.C.3
  • 8
    • 0026257538 scopus 로고
    • A priory vector based technique for load forecasting
    • S. Rahman and G. Shrestha, "A priory vector based technique for load forecasting," IEEE Trans. Power Syst., vol. 6, no. 4, pp. 1459-1464, 1993.
    • (1993) IEEE Trans. Power Syst , vol.6 , Issue.4 , pp. 1459-1464
    • Rahman, S.1    Shrestha, G.2
  • 9
    • 0024001840 scopus 로고
    • An expert system based algorithm for short term load forecast
    • S. Rahman and R. Bhatnagar, "An expert system based algorithm for short term load forecast," IEEE Trans. Power Syst., vol. 3, no. 2, pp. 392-399, 1988.
    • (1988) IEEE Trans. Power Syst , vol.3 , Issue.2 , pp. 392-399
    • Rahman, S.1    Bhatnagar, R.2
  • 10
    • 0029410319 scopus 로고
    • Demand forecasting using fuzzy neural computation, with special emphasis on weekend and public holiday forecasting
    • D. Srinivasan, C. S. Chang, and A. C. Liew, "Demand forecasting using fuzzy neural computation, with special emphasis on weekend and public holiday forecasting," IEEE Trans. Power Syst., vol. 10, no. 2, pp. 1897-1903, 1995.
    • (1995) IEEE Trans. Power Syst , vol.10 , Issue.2 , pp. 1897-1903
    • Srinivasan, D.1    Chang, C.S.2    Liew, A.C.3
  • 11
    • 0030289955 scopus 로고    scopus 로고
    • A neural network based technique for short-term forecasting of anomalous load periods
    • R. Lamedica, A. Prudenzi, M. Sforna, M. Caciotta, and V. O. Cencellli, "A neural network based technique for short-term forecasting of anomalous load periods," IEEE Trans. Power Syst., vol. 11, no. 4, pp. 1749-1750, 1996.
    • (1996) IEEE Trans. Power Syst , vol.11 , Issue.4 , pp. 1749-1750
    • Lamedica, R.1    Prudenzi, A.2    Sforna, M.3    Caciotta, M.4    Cencellli, V.O.5
  • 12
    • 0036474210 scopus 로고    scopus 로고
    • One-hour-ahead load forecasting using neural network
    • T. Senjyu, H. Takara, K. Uezato, and T. Funabashi, "One-hour-ahead load forecasting using neural network," IEEE Trans. Power Syst., vol. 17, no. 1, pp. 113-118, 2002.
    • (2002) IEEE Trans. Power Syst , vol.17 , Issue.1 , pp. 113-118
    • Senjyu, T.1    Takara, H.2    Uezato, K.3    Funabashi, T.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.