-
1
-
-
0006439659
-
Two unit cold standby system with correlated failures and repairs
-
Goel, L. R., Srivastava, P., and Gupta, R. 1992, Two unit cold standby system with correlated failures and repairs. International Journal of Systems Science, 23, 379-391.
-
(1992)
International Journal of Systems Science
, vol.23
, pp. 379-391
-
-
Goel, L.R.1
Srivastava, P.2
Gupta, R.3
-
2
-
-
0022920361
-
Analysis of one server two-unit parallel system subject to degradation
-
Gopalan, M. N., Ramesh, T. K., and Krishna Kumar, K. V., 1986, Analysis of one server two-unit parallel system subject to degradation. Microelectron Reliability, 26, 657-664.
-
(1986)
Microelectron Reliability
, vol.26
, pp. 657-664
-
-
Gopalan, M.N.1
Ramesh, T.K.2
Krishna Kumar, K.V.3
-
3
-
-
0027037908
-
A two-unit priority system subject to random shocks and Rayleigh failure time distributions
-
Gupta, R., and Chaudhary, A., 1992, A two-unit priority system subject to random shocks and Rayleigh failure time distributions. Microelectronics and Reliability, 32, 1713-1723.
-
(1992)
Microelectronics and Reliability
, vol.32
, pp. 1713-1723
-
-
Gupta, R.1
Chaudhary, A.2
-
4
-
-
0024736085
-
Profit analysis of two unit priority standby system with administrative delay in repair
-
Gupta, R., and Goel, L. R., 1989, Profit analysis of two unit priority standby system with administrative delay in repair. International Journal of Systems Science, 20, 1703-1712.
-
(1989)
International Journal of Systems Science
, vol.20
, pp. 1703-1712
-
-
Gupta, R.1
Goel, L.R.2
-
5
-
-
0025464889
-
Cost benefit analysis of a two-unit parallel standby system with administrative delay in repair
-
Gupta, R., and Goel, L. R., 1990, Cost benefit analysis of a two-unit parallel standby system with administrative delay in repair. International Journal of Systems Science, 21, 1369-1379.
-
(1990)
International Journal of Systems Science
, vol.21
, pp. 1369-1379
-
-
Gupta, R.1
Goel, L.R.2
-
6
-
-
1642292632
-
On the profit comparison of two stochastic models each pertaining to a two-unit standby system with fixed preparation time and hyperexponential repair time distributions
-
Gupta, R., and Kishan, R., 1999, On the profit comparison of two stochastic models each pertaining to a two-unit standby system with fixed preparation time and hyperexponential repair time distributions. International Journal of Systems Science, 30, (12), 1309-1317.
-
(1999)
International Journal of Systems Science
, vol.30
, Issue.12
, pp. 1309-1317
-
-
Gupta, R.1
Kishan, R.2
-
7
-
-
0033321725
-
A two-non-identical-unit parallel system with correlated lifetimes
-
Gupta, R., Kishan, R., and Kumar, P., 1999, A two-non-identical-unit parallel system with correlated lifetimes. International Journal of Systems Science, 30, (10), 1123-1129.
-
(1999)
International Journal of Systems Science
, vol.30
, Issue.10
, pp. 1123-1129
-
-
Gupta, R.1
Kishan, R.2
Kumar, P.3
-
8
-
-
0035296734
-
A generalized age replacement policy with random delivery time and inspection
-
Jhang, J.-P., 2001, A generalized age replacement policy with random delivery time and inspection. International Journal of Systems Science, 32, (3), 321-329.
-
(2001)
International Journal of Systems Science
, vol.32
, Issue.3
, pp. 321-329
-
-
Jhang, J.-P.1
-
9
-
-
1642295890
-
Scheduling starting times in redundant systems
-
Kokolakis, G., Varvarigou, T., and Anagnostou, M., 1996, Scheduling starting times in redundant systems. Hermis Conference, 498-505.
-
(1996)
Hermis Conference
, pp. 498-505
-
-
Kokolakis, G.1
Varvarigou, T.2
Anagnostou, M.3
-
10
-
-
0021128201
-
Comparison of two unit cold standby reliability models with three types of repair facilities
-
Murari, K., and Goel, V., 1984, Comparison of two unit cold standby reliability models with three types of repair facilities. Microelectronics and Reliability, 24, 35-39.
-
(1984)
Microelectronics and Reliability
, vol.24
, pp. 35-39
-
-
Murari, K.1
Goel, V.2
-
11
-
-
0343396836
-
Two-units parallel system with periods of working and rest
-
Murari, K., and Maruthachalam, C., 1981, Two-units parallel system with periods of working and rest. IEEE Transactions on Reliability, 30, 91.
-
(1981)
IEEE Transactions on Reliability
, vol.30
, pp. 91
-
-
Murari, K.1
Maruthachalam, C.2
-
12
-
-
0001687830
-
Optimum replacement policies with delay
-
Nakagawa, T., and Osaki, S., 1974, Optimum replacement policies with delay. Journal of Applied Probability, 11, 102-110.
-
(1974)
Journal of Applied Probability
, vol.11
, pp. 102-110
-
-
Nakagawa, T.1
Osaki, S.2
-
13
-
-
0017252561
-
Age replacement with lead time
-
Osaki, S., and Yamada, S., 1976, Age replacement with lead time. IEEE Transactions on Reliability, 25, 344-345.
-
(1976)
IEEE Transactions on Reliability
, vol.25
, pp. 344-345
-
-
Osaki, S.1
Yamada, S.2
|