메뉴 건너뛰기




Volumn 121, Issue 2, 2009, Pages 610-619

Linking operations objectives to actions: A plug and play approach

Author keywords

Operations strategy; Plug and play; Rapid modelling

Indexed keywords

CAUSE-EFFECT; ISSUES AND CHALLENGES; OPERATIONS STRATEGY; PLUG AND PLAY; PLUG AND PLAY APPROACH; RAPID MODELLING; SALIENT FEATURES; SIMPLIFIED MODELS; SOFTWARE TOOL; STRATEGIC DEPLOYMENT;

EID: 70349211691     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2007.02.032     Document Type: Article
Times cited : (8)

References (41)
  • 1
    • 23044475876 scopus 로고    scopus 로고
    • A Short, Practical Guide to Implementing Strategy
    • Allio M.K. A Short, Practical Guide to Implementing Strategy. Journal of Business Strategy 26 4 (2005) 12-21
    • (2005) Journal of Business Strategy , vol.26 , Issue.4 , pp. 12-21
    • Allio, M.K.1
  • 3
    • 0035883112 scopus 로고    scopus 로고
    • Linking improvement models to manufacturing strategies-a methodology for small manufacturing enterprises
    • Barad M., and Gien D. Linking improvement models to manufacturing strategies-a methodology for small manufacturing enterprises. International Journal of Production Research 39 12 (2001) 2675-2695
    • (2001) International Journal of Production Research , vol.39 , Issue.12 , pp. 2675-2695
    • Barad, M.1    Gien, D.2
  • 4
    • 0032362623 scopus 로고    scopus 로고
    • Longitudinal linkages between intended and realised operations strategies
    • Boyer K.K. Longitudinal linkages between intended and realised operations strategies. International Journal of Operations & Production Management 18 4 (1998) 356-374
    • (1998) International Journal of Operations & Production Management , vol.18 , Issue.4 , pp. 356-374
    • Boyer, K.K.1
  • 6
    • 0002751207 scopus 로고
    • IBM combines rapid modelling technique and simulation to design PCB factory-of-the-future
    • Brown, E., 1988. IBM combines rapid modelling technique and simulation to design PCB factory-of-the-future. Industrial Engineering, 23-26.
    • (1988) Industrial Engineering , pp. 23-26
    • Brown, E.1
  • 9
    • 0034392313 scopus 로고    scopus 로고
    • How improvement programmes of manufacturing are selected: the role of strategic priorities and past experience
    • Cagliano R., and Spina G. How improvement programmes of manufacturing are selected: the role of strategic priorities and past experience. International Journal of Operations & Production Management 20 7 (2000) 772-792
    • (2000) International Journal of Operations & Production Management , vol.20 , Issue.7 , pp. 772-792
    • Cagliano, R.1    Spina, G.2
  • 11
    • 0001037391 scopus 로고
    • Lasting improvements in manufacturing performance
    • De Meyer A., and Ferdows K. Lasting improvements in manufacturing performance. Journal of Operations Management 9 2 (1990) 168-184
    • (1990) Journal of Operations Management , vol.9 , Issue.2 , pp. 168-184
    • De Meyer, A.1    Ferdows, K.2
  • 14
    • 0022153539 scopus 로고
    • Manufacturing strategy: a methodology and description
    • Fine C.H., and Hax A.C. Manufacturing strategy: a methodology and description. Interfaces 15 6 (1985) 28-46
    • (1985) Interfaces , vol.15 , Issue.6 , pp. 28-46
    • Fine, C.H.1    Hax, A.C.2
  • 15
    • 21344492901 scopus 로고
    • Manufacturing srategic panning
    • Garvin D.A. Manufacturing srategic panning. California Management Review 35 4 (1993) 85-106
    • (1993) California Management Review , vol.35 , Issue.4 , pp. 85-106
    • Garvin, D.A.1
  • 22
    • 85139722913 scopus 로고
    • Stimulating ideas through creativity software
    • MacCrimmon K.R., and Wagner C. Stimulating ideas through creativity software. Management Science 40 11 (1994) 1514-1532
    • (1994) Management Science , vol.40 , Issue.11 , pp. 1514-1532
    • MacCrimmon, K.R.1    Wagner, C.2
  • 25
    • 0023572654 scopus 로고
    • Using analytical and simulation modelling for early factory prototyping
    • Nymon, J., 1987. Using analytical and simulation modelling for early factory prototyping. Proceedings of the Winter Simulation Conference, pp. 721-724.
    • (1987) Proceedings of the Winter Simulation Conference , pp. 721-724
    • Nymon, J.1
  • 26
    • 0032284159 scopus 로고    scopus 로고
    • A rapid modelling technique for measurable improvements in factory performance
    • Peikert, A., Thoma, J., Brown, S., 1998. A rapid modelling technique for measurable improvements in factory performance. Winter Simulation Conference 1998, pp. 1011-1016.
    • (1998) Winter Simulation Conference , pp. 1011-1016
    • Peikert, A.1    Thoma, J.2    Brown, S.3
  • 27
    • 0041522302 scopus 로고
    • Ph.D. Thesis, Manufacturing Engineering Group, Engineering Department, University of Cambridge
    • Platts, K.W., 1990. Manufacturing audit in the process of strategy formulation. Ph.D. Thesis, Manufacturing Engineering Group, Engineering Department, University of Cambridge.
    • (1990) Manufacturing audit in the process of strategy formulation
    • Platts, K.W.1
  • 28
    • 2242485025 scopus 로고
    • The AHP-what it is and how it is used
    • Saaty T.L. The AHP-what it is and how it is used. Mathematical Modelling 9 3-5 (1987) 161-176
    • (1987) Mathematical Modelling , vol.9 , Issue.3-5 , pp. 161-176
    • Saaty, T.L.1
  • 30
    • 70349227952 scopus 로고    scopus 로고
    • Aligning operating tactics with strategic decisions
    • Segerstrom, J.R., 2003. Aligning operating tactics with strategic decisions. Bank Accounting & Finance, 10/3, #2, 15-23.
    • (2003) Bank Accounting & Finance, 10/3 , Issue.2 , pp. 15-23
    • Segerstrom, J.R.1
  • 32
    • 0032317887 scopus 로고    scopus 로고
    • Manufacturing System Design. 48th General Assembly of CIRP
    • Suh N.P., Cochran D.S., and Lima P.C. Manufacturing System Design. 48th General Assembly of CIRP. Annals of the CIRP 47 2 (1998) 627-639
    • (1998) Annals of the CIRP , vol.47 , Issue.2 , pp. 627-639
    • Suh, N.P.1    Cochran, D.S.2    Lima, P.C.3
  • 33
    • 9744251065 scopus 로고
    • RMT puts manufacturing at the Helm
    • February, pp
    • Suri, R., 1988. RMT puts manufacturing at the Helm. Manufacturing Engineering, February, pp. 41-44
    • (1988) Manufacturing Engineering , pp. 41-44
    • Suri, R.1
  • 35
    • 3543061742 scopus 로고
    • Manufacturing strategy: propositions, current research, renewed directions
    • Swink M., and Way H.M. Manufacturing strategy: propositions, current research, renewed directions. International Journal of Operation and Management 15 7 (1995)
    • (1995) International Journal of Operation and Management , vol.15 , Issue.7
    • Swink, M.1    Way, H.M.2
  • 38
    • 1642573292 scopus 로고    scopus 로고
    • Linking objectives to action plans: a decision support approach based on the connectance concept
    • Tan K.H., and Platts K. Linking objectives to action plans: a decision support approach based on the connectance concept. Decision Sciences 34 3 (2003) 569-593
    • (2003) Decision Sciences , vol.34 , Issue.3 , pp. 569-593
    • Tan, K.H.1    Platts, K.2
  • 39
    • 2442623446 scopus 로고    scopus 로고
    • Operationalising strategy: mapping manufacturing variables
    • Tan K.H., and Platts K. Operationalising strategy: mapping manufacturing variables. International Journal of Production Economics 89 3 (2004) 379-393
    • (2004) International Journal of Production Economics , vol.89 , Issue.3 , pp. 379-393
    • Tan, K.H.1    Platts, K.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.