-
1
-
-
1842865110
-
A real-time predictive maintenance system for machine systems
-
Bansal, D., Evans, D.J. and Jones, B. (2004), "A real-time predictive maintenance system for machine systems", International Journal of Machine Tools & Manufacture, Vol. 44 Nos 7/8, pp. 759-66.
-
(2004)
International Journal of Machine Tools & Manufacture
, vol.44
, Issue.7
, pp. 759-766
-
-
Bansal, D.1
Evans, D.J.2
Jones, B.3
-
2
-
-
0032665853
-
Qualitative company performance evaluation: Linear discriminant analysis and neural network models
-
Bertel, K.J. and Mneuberg, L.L. (1999), "Qualitative company performance evaluation: linear discriminant analysis and neural network models", European Journal of Operational Research, Vol. 115 No. 3, pp. 608-15.
-
(1999)
European Journal of Operational Research
, vol.115
, Issue.3
, pp. 608-615
-
-
Bertel, K.J.1
Mneuberg, L.L.2
-
3
-
-
0003908748
-
-
McGraw-Hill, New York, NY
-
Chase, R.B., Aquilano, N.J. and Jacobs, F.R. (2002), Operations Management for Competitive Advantage, 10th ed., McGraw-Hill, New York, NY.
-
(2002)
Operations Management for Competitive Advantage, 10th Ed.
-
-
Chase, R.B.1
Aquilano, N.J.2
Jacobs, F.R.3
-
4
-
-
0036604737
-
Estimation of all-terminal network reliability using an artificial neural network
-
Chat, S., Konak, A. and Smith, A.E. (2002), "Estimation of all-terminal network reliability using an artificial neural network", Computers & Operations Research, Vol. 29, pp. 849-68.
-
(2002)
Computers & Operations Research
, vol.29
, pp. 849-868
-
-
Chat, S.1
Konak, A.2
Smith, A.E.3
-
5
-
-
70349205655
-
Eshinui Inc., Hayward, California
-
Dellar, Carl N.R., Vernilovsky, A. and Cockerill, L. (2002), "Eshinui Inc., Hayward, California", Semiconductor Technique Magazine, No. 29, pp. 60-2.
-
(2002)
Semiconductor Technique Magazine
, Issue.29
, pp. 60-62
-
-
Dellar Carl, N.R.1
Vernilovsky, A.2
Cockerill, L.3
-
6
-
-
0042430207
-
Artificial neural networks for job shop simulation
-
Fonseca, D.J. and Navaresse, D. (2002), "Artificial neural networks for job shop simulation", Advanced Engineering Informatics, Vol. 16, pp. 241-6.
-
(2002)
Advanced Engineering Informatics
, vol.16
, pp. 241-246
-
-
Fonseca, D.J.1
Navaresse, D.2
-
7
-
-
0036565786
-
A condition-based maintenance policy for stochastically deteriorating systems
-
Grall, A., Berenguer, C. and Dieulle, L. (2002), "A condition-based maintenance policy for stochastically deteriorating systems", Reliability Engineering & System Safety, Vol. 76, pp. 167-80.
-
(2002)
Reliability Engineering & System Safety
, vol.76
, pp. 167-180
-
-
Grall, A.1
Berenguer, C.2
Dieulle, L.3
-
8
-
-
9444284317
-
Assessing effort estimation models for corrective maintenance through empirical studies
-
Lucia, A.D., Pompella, E. and Stefanucci, S. (2005), "Assessing effort estimation models for corrective maintenance through empirical studies", Information and Software Technology, Vol. 47 No. 1, pp. 31-3.
-
(2005)
Information and Software Technology
, vol.47
, Issue.1
, pp. 31-33
-
-
Lucia, A.D.1
Pompella, E.2
Stefanucci, S.3
-
9
-
-
0033117677
-
An improved neural classification network for the two-group problem
-
Managiameli, P.W. (1999), "An improved neural classification network for the two-group problem", Computers & Operations Research, Vol. 26 No. 5, pp. 443-60.
-
(1999)
Computers & Operations Research
, vol.26
, Issue.5
, pp. 443-460
-
-
Managiameli, P.W.1
-
10
-
-
9644307981
-
Implementation and benefits of introducing a computerized maintenance management system into a textile manufacturing company
-
O'Donoghue, C.D. and Prendergast, J.G. (2004), "Implementation and benefits of introducing a computerized maintenance management system into a textile manufacturing company", Journal of Materials Processing Technology, Vol. 153-154, pp. 226-32.
-
(2004)
Journal of Materials Processing Technology
, vol.153
, pp. 226-232
-
-
O'donoghue, C.D.1
Prendergast, J.G.2
-
11
-
-
0032021890
-
Using feature construction to improve the performance of neural network
-
Priamuthm, S., Ragavan, H. and Shaw, M.J. (1998), "Using feature construction to improve the performance of neural network", Management Science, Vol. 44 No. 3, pp. 416-30.
-
(1998)
Management Science
, vol.44
, Issue.3
, pp. 416-430
-
-
Priamuthm, S.1
Ragavan, H.2
Shaw, M.J.3
-
12
-
-
2442663120
-
Joint optimization of preventive maintenance and inventory control in a production line using simulation
-
Rezg, N., Xie, X. and Mait, Y. (2004), "Joint optimization of preventive maintenance and inventory control in a production line using simulation", International Journal of Production Research, Vol. 42 No. 10, pp. 2029-46.
-
(2004)
International Journal of Production Research
, vol.42
, Issue.10
, pp. 2029-2046
-
-
Rezg, N.1
Xie, X.2
Mait, Y.3
-
13
-
-
0037062528
-
A framework for maintenance concept development
-
Waeyenbergh, G. and Pintelon, L. (2002), "A framework for maintenance concept development", International Journal of Production Economics, Vol. 77, pp. 299-313.
-
(2002)
International Journal of Production Economics
, vol.77
, pp. 299-313
-
-
Waeyenbergh, G.1
Pintelon, L.2
-
14
-
-
70349207298
-
-
Inc., Cleveland, OH
-
Weeden, O. (2003), Probe Card Tutorial, Keithley Instruments, Inc., Cleveland, OH.
-
(2003)
Probe Card Tutorial, Keithley Instruments
-
-
Weeden, O.1
-
15
-
-
33744831752
-
Machine number, priority rule, and due date determination in flexible manufacturing systems using artificial neural networks
-
Yildirim, M.B., Cakar, T., Doguc, U. and Meza, J.C. (2006), "Machine number, priority rule, and due date determination in flexible manufacturing systems using artificial neural networks", Computers & Industrial Engineering., Vol. 50, pp. 185-94.
-
(2006)
Computers & Industrial Engineering
, vol.50
, pp. 185-194
-
-
Yildirim, M.B.1
Cakar, T.2
Doguc, U.3
Meza, J.C.4
|