메뉴 건너뛰기




Volumn , Issue , 2008, Pages 590-595

A risk-based decision approach for maintenance scheduling strategies for transmission system equipment

Author keywords

Circuit breakers; Condition data; Maintenance; Risk analysis

Indexed keywords

CIRCUIT BREAKER; CIRCUIT BREAKERS; CONDITION DATA; EVENT PROBABILITY; LABOR HOURS; MAINTENANCE ACTION; MAINTENANCE ACTIVITY; MAINTENANCE DECISIONS; MAINTENANCE POLICY; MAINTENANCE SCHEDULING; MAINTENANCE STRATEGIES; MAINTENANCE TASKS; POWER INDUSTRY; POWER SYSTEM EQUIPMENTS; RISK BASED APPROACHES; RISK-BASED DECISIONS; SHORT TERM; SHRINKING BUDGET; TRANSMISSION SYSTEMS;

EID: 70349096009     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (27)

References (31)
  • 1
    • 0035505636 scopus 로고    scopus 로고
    • The present status of maintenance strategies and the impact of maintenance on reliability
    • IEEE/PES Task Force on Impact of Maintenance Strategy on Reliability of the Reliability, Risk and Probability Applications Subcommittee, November
    • IEEE/PES Task Force on Impact of Maintenance Strategy on Reliability of the Reliability, Risk and Probability Applications Subcommittee, "The present status of maintenance strategies and the impact of maintenance on reliability", IEEE Trans. Power Systems, vol.16, no.4, pp. 638-646, November 2001.
    • (2001) IEEE Trans. Power Systems , vol.16 , Issue.4 , pp. 638-646
  • 2
    • 14544269080 scopus 로고
    • Availability optimization for continuously operating equipment with maintenance and repair
    • California, September
    • J. Endrenyi, and S. H. Sim, "Availability optimization for continuously operating equipment with maintenance and repair", in Proceedings of the Second PMAPS Symposium, California, September 1988.
    • (1988) Proceedings of the Second PMAPS Symposium
    • Endrenyi, J.1    Sim, S.H.2
  • 3
    • 0032071144 scopus 로고    scopus 로고
    • Probabilistic evaluation of the effect of maintenance on reliability-An application
    • May
    • J. Endrenyi, G. J. Anders, and A. M. Leite da Silva, "Probabilistic evaluation of the effect of maintenance on reliability-An application", IEEE Trans. Power System, vol.13, no.2, pp. 576-583, May 1998.
    • (1998) IEEE Trans. Power System , vol.13 , Issue.2 , pp. 576-583
    • Endrenyi, J.1    Anders, G.J.2    Leite Da Silva, A.M.3
  • 5
    • 5144222229 scopus 로고    scopus 로고
    • The effect of transformer maintenance parameters on reliability and cost: A probabilistic model
    • 15 December
    • Panida Jirutitijaroen, and Chanan Singh, "The Effect of Transformer Maintenance Parameters on Reliability and Cost: A Probabilistic Model", Electric Power Systems Research, Volume 72, Issue 3, 15 December 2004, Pages 213-222
    • (2004) Electric Power Systems Research , vol.72 , Issue.3 , pp. 213-222
    • Jirutitijaroen, P.1    Singh, C.2
  • 8
    • 13844313055 scopus 로고    scopus 로고
    • A reliability-centered asset maintenance method for assessing the impact of maintenance in power distribution systems
    • DOI 10.1109/TPWRS.2004.840433
    • Lina Bertling, Ron Allan, Roland Eriksson, "A reliability-centered asset maintenance method for assessing the impact of maintenance in power distribution systems", IEEE Trans. Power Systems, vol.20, no.1, pp 75-82, February 2005. (Pubitemid 40259422)
    • (2005) IEEE Transactions on Power Systems , vol.20 , Issue.1 , pp. 75-82
    • Bertling, L.1    Allan, R.2    Eriksson, R.3
  • 9
    • 42549104902 scopus 로고    scopus 로고
    • Transmission system equipment maintenance: On-line use of circuit breaker condition data
    • Tampa, Florida, June
    • Satish Natti, and Mladen Kezunovic, "Transmission system equipment maintenance: on-line use of circuit breaker condition data", IEEE PES General Meeting, Tampa, Florida, June 2007.
    • (2007) IEEE PES General Meeting
    • Natti, S.1    Kezunovic, M.2
  • 10
    • 50849085133 scopus 로고    scopus 로고
    • Model for quantifying the effect of circuit breaker maintenance using condition-based data
    • Lausanne, Switzerland, July
    • Satish Natti, and Mladen Kezunovic, "Model for quantifying the effect of circuit breaker maintenance using condition-based data", Power Tech 2007, Lausanne, Switzerland, July 2007.
    • (2007) Power Tech 2007
    • Natti, S.1    Kezunovic, M.2
  • 12
    • 0038180767 scopus 로고    scopus 로고
    • Risk assessment in energy trading
    • May
    • R. Bjorgan, C. Liu, and J. Lawarree, "Risk assessment in energy trading", IEEE Trans. Power Systems, vol.18, no.2, pp 503-511, May 2003.
    • (2003) IEEE Trans. Power Systems , vol.18 , Issue.2 , pp. 503-511
    • Bjorgan, R.1    Liu, C.2    Lawarree, J.3
  • 13
    • 0033221395 scopus 로고    scopus 로고
    • Financial risk management in a competitive electricity market
    • November
    • R. Bjorgan, C. Liu, and J. Lawarree, "Financial risk management in a competitive electricity market", IEEE Trans. Power Systems, vol.14, no.4, pp 1285-1291, November 1999.
    • (1999) IEEE Trans. Power Systems , vol.14 , Issue.4 , pp. 1285-1291
    • Bjorgan, R.1    Liu, C.2    Lawarree, J.3
  • 15
    • 1442288865 scopus 로고    scopus 로고
    • Optimal integrated generation bidding and scheduling with risk management under a deregulated power market
    • February
    • E. Ni, P. B. Luh, and S. Rourke, "Optimal integrated generation bidding and scheduling with risk management under a deregulated power market", IEEE Trans. Power Systems, vol.19, no.1, pp 600-609, February 2004.
    • (2004) IEEE Trans. Power Systems , vol.19 , Issue.1 , pp. 600-609
    • Ni, E.1    Luh, P.B.2    Rourke, S.3
  • 17
    • 0029253069 scopus 로고
    • Evaluating risk management strategies in resource planning
    • February
    • C. J. Andrews, "Evaluating risk management strategies in resource planning", IEEE Trans. Power Systems, vol.10, no.1, pp 420-426, February 1995.
    • (1995) IEEE Trans. Power Systems , vol.10 , Issue.1 , pp. 420-426
    • Andrews, C.J.1
  • 18
    • 85008041954 scopus 로고    scopus 로고
    • Risk-based planner for asset management
    • October
    • G. J. Anders, J. Endrenyi, and C. Yung, "Risk-based planner for asset management", IEEE Comput. Applicat. Power, vol.14, no.4, pp 718-723, October 2001.
    • (2001) IEEE Comput. Applicat. Power , vol.14 , Issue.4 , pp. 718-723
    • Anders, G.J.1    Endrenyi, J.2    Yung, C.3
  • 19
    • 0035506263 scopus 로고    scopus 로고
    • Annual risk assessment for overload security
    • November
    • Y. Dai, J. McCalley, and V. Vittal, "Annual risk assessment for overload security", IEEE Trans. Power Systems, vol.16, no.4, pp 616-623, November 2001.
    • (2001) IEEE Trans. Power Systems , vol.16 , Issue.4 , pp. 616-623
    • Dai, Y.1    McCalley, J.2    Vittal, V.3
  • 20
    • 0037292303 scopus 로고    scopus 로고
    • On-line risk based security assessment
    • February
    • M. Ni, J. McCalley, V. Vittal, and T. Tayyib, "On-line risk based security assessment", IEEE Trans. Power Systems, vol.18, no.1, pp 258-623, February 2003.
    • (2003) IEEE Trans. Power Systems , vol.18 , Issue.1 , pp. 258-623
    • Ni, M.1    McCalley, J.2    Vittal, V.3    Tayyib, T.4
  • 21
    • 0034428672 scopus 로고    scopus 로고
    • Risk based voltage security assessment
    • November
    • H. Wan, J. McCalley, and V. Vittal, "Risk based voltage security assessment", IEEE Trans. Power Systems, vol.15, no.4, pp 1247-1254, November 2000.
    • (2000) IEEE Trans. Power Systems , vol.15 , Issue.4 , pp. 1247-1254
    • Wan, H.1    McCalley, J.2    Vittal, V.3
  • 22
    • 0024668655 scopus 로고
    • An interactive package for risk evaluation and maintenance scheduling
    • May
    • G. C. Contaxis, S. D. Kavatza, and C. D. Vournas, "An interactive package for risk evaluation and maintenance scheduling", IEEE Trans. Power Systems, vol.4, no.2, pp 389-395, May 1989.
    • (1989) IEEE Trans. Power Systems , vol.4 , Issue.2 , pp. 389-395
    • Contaxis, G.C.1    Kavatza, S.D.2    Vournas, C.D.3
  • 23
    • 33747620741 scopus 로고    scopus 로고
    • Risk-based resource optimization for transmission system maintenance
    • August
    • Y. Jiang, M. Ni, J. McCalley, T. Van Voorhis, "Risk-based resource optimization for transmission system maintenance," IEEE Trans. Power Systems, vol 21, no.3, pp 1191-2000, August 2006.
    • (2006) IEEE Trans. Power Systems , vol.21 , Issue.3 , pp. 1191-2000
    • Jiang, Y.1    Ni, M.2    McCalley, J.3    Van Voorhis, T.4
  • 24
    • 34248588339 scopus 로고    scopus 로고
    • Selective maintenance schedule of distribution networks based on risk management approach
    • May
    • A. D. Janjic, and D. S. Popovic, "Selective maintenance schedule of distribution networks based on risk management approach", IEEE Trans. Power Systems, vol.22, no.2, pp 616-623, May 2007.
    • (2007) IEEE Trans. Power Systems , vol.22 , Issue.2 , pp. 616-623
    • Janjic, A.D.1    Popovic, D.S.2
  • 25
  • 26
    • 33749620859 scopus 로고    scopus 로고
    • Real-time monitoring and assessment of circuit breaker operations for diagnostics and control applications
    • New Orleans, Louisiana, March
    • M. Kezunovic, G. Latisko, N. Ved, "Real-time monitoring and assessment of circuit breaker operations for diagnostics and control applications", EPRI Substation Equipment Diagnostics Conference XIII, New Orleans, Louisiana, March 2005
    • (2005) EPRI Substation Equipment Diagnostics Conference XIII
    • Kezunovic, M.1    Latisko, G.2    Ved, N.3
  • 28
    • 50849101771 scopus 로고    scopus 로고
    • M.Sc. hesis, Dept. of ECE., Texas A&M University, College Station, TX
    • Christopher Donald Nail, "Automated Circuit Breaker Analysis", M.Sc. hesis, Dept. of ECE., Texas A&M University, College Station, TX, 2002.
    • (2002) Automated Circuit Breaker Analysis
    • Donald Nail, C.1
  • 30
    • 0018544097 scopus 로고
    • Reliability test system task force of the application of probability methods subcommittee
    • PAS-98, Nov./Dec.
    • Reliability test system task force of the application of probability methods subcommittee, "IEEE reliability test system," IEEE Trans. Power App. Syst., vol.PAS-98, pp. 2047-2054, Nov./Dec. 1979.
    • (1979) IEEE Reliability Test System, IEEE Trans. Power App. Syst. , pp. 2047-2054
  • 31
    • 0032592961 scopus 로고    scopus 로고
    • Reliability test system task force of the application of probability methods subcommittee
    • August
    • Reliability test system task force of the application of probability methods subcommittee, "IEEE reliability test system-1996," IEEE Trans. Power Systems., vol.14, no.3, pp. 1010-1020, August 1999.
    • (1999) IEEE Reliability Test System-1996, IEEE Trans. Power Systems. , vol.14 , Issue.3 , pp. 1010-1020


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.